Choke Manifold Pressure Gauge Sample Clauses

Choke Manifold Pressure Gauge. Quantity no.: 2 Make/Type HITEC SMART DRILLING INSTRUMENTATION Pressure range (maximum) psi: 0 - 15,000
AutoNDA by SimpleDocs
Choke Manifold Pressure Gauge. Make/Type : Strain gauge Pressure range psi: 0-15,000 H.3.1 and H.3.2 combined on one panel yes/no: yes Visible from choke operating position yes/no: yes H.4 STANDPIPE PRESSURE GAUGE Strain Gauges Make/Type : OTECO Pressure range psi: 0-10,000 Visible from driller’s position yes/no: No
Choke Manifold Pressure Gauge. Make/type Pressure range (maximum) psi H.3.1 and H.3.2 combined on one panel: Yes/No Visible from choke operation position: Yes/No
Choke Manifold Pressure Gauge. Quantity: no. 4 Make/type: NOV-Hitec with transmitter Pressure range: psi - psi 0 – 20,000 Quantity: no. 4 Make/type: NOV/Pressure Gauge Pressure range: psi - psi 0 – 20,000
Choke Manifold Pressure Gauge. Make/type R.B. Pipetech Pressure range (maximum) psi 10,000 and 15,000 (fine scale)
Choke Manifold Pressure Gauge. Quantity: no. 2 Make/type: Houston Digital Instruments (Mounted on manifold) Pressure range: psi - psi 0 - 16,000psi Quantity: no. 2 Make/type: Electroflow Pressure range: psi - psi 0 - 16,000psi Quantity: no. 2 Make/type: HDI (mounted on manifold) Pressure range: psi - psi 0 -15,000psi
Choke Manifold Pressure Gauge. Make/type HDI Type 2400 Pressure range (maximum): psi 15,000psi H.3.1 and H.3.2 combined on one panel: yes/no Yes Visible from choke operation position: yes/no Yes H.4 STANDPIPE PRESSURE GAUGE HDI already shown on H.3.1 & H.1.2 Make/type: HDI 2400 Pressure range: psi 10,000psi Visible from Driller’s position: yes/no Yes
AutoNDA by SimpleDocs

Related to Choke Manifold Pressure Gauge

  • Delivery Point (a) All Energy shall be Delivered hereunder by Seller to Buyer at the Delivery Point. Seller shall be responsible for the costs of delivering its Energy to the Delivery Point consistent with all standards and requirements set forth by the FERC, ISO-NE, the Interconnecting Utility and any other applicable Governmental Entity and any applicable tariff.

  • Delivery Points ‌ Project water made available to the Agency pursuant to Article 6 shall be delivered to the Agency by the State at the delivery structures established in accordance with Article 10.

  • Delivery Pressure Xxxxxx agrees to use due care and diligence to furnish gas hereunder at such uniform pressure as Seller may elect up to, but not exceeding 20 pounds per square inch gauge, and not less than 5 pounds per square inch gauge, at the "Point of Delivery". Buyer shall be responsible for the installation and operation of adequate safety equipment downstream of the Point of Delivery so as to relieve or control pressure variations within the limits described above that may, for any reason through malfunction of Seller's equipment or otherwise, occur on Buyer's side of the "Delivery Point".

  • Temperature Where low temperature and/or self-service cases are used for any of such merchandise coming under the jurisdiction of the Union, such cases shall be served only by employees covered by this Agreement.

  • Fuel 28.1 The Vehicle must be returned with the amount of fuel equal to that at the time of the commencement of the rental. If the Vehicle is returned with less fuel, the difference will be charged to You at a rate of $5.00 including GST per litre (which includes a service component).

  • Floor Loading Floor loading capacity shall be within building design capacity. Tenant may exceed floor loading capacity with Landlord’s consent, at Landlord’s sole discretion and must, at Tenant’s sole cost and expense, reinforce the floor as required for such excess loading.

  • Loading RPMG shall schedule the loading and shipping of all outbound corn oil purchased hereunder, but all labor and equipment necessary to load trucks and rail cars and other associated costs shall be supplied and borne by Producer without charge to RPMG. Producer shall handle the corn oil in a good and workmanlike manner in accordance with RPMG’s written requirements and normal industry practice. Producer shall maintain the truck and rail loading facilities in safe operating condition in accordance with normal industry standards and shall visually inspect all trucks and rail cars to assure (i) cleanliness so as to avoid contamination, and (ii) that such trucks and railcars are in a condition suitable for transporting the corn oil. RPMG and RPMG’s agents shall have adequate access to the Ethanol Facility to load Producer’s corn oil on an industry standard basis that allows RPMG to economically market Producer’s corn oil. RPMG’s employees shall follow all reasonable safety rules and procedures promulgated by Producer and provided to RPMG reasonably in advance and in writing. Producer shall supply product description tags, certificates of analysis, bills of lading and/or material safety data sheets that are applicable to all shipments. In the event that Producer fails to provide the labor, equipment and facilities necessary to meet RPMG’s loading schedule, Producer shall be responsible for all costs and expenses, including without limitation actual demurrage and wait time, incurred by RPMG resulting from or arising in connection with Producer’s failure to do so.

  • Storage Tanks If storage tanks storing Hazardous Materials located on the Premises or the Project are used by Tenant or are hereafter placed on the Premises or the Project by Tenant, Tenant shall install, use, monitor, operate, maintain, upgrade and manage such storage tanks, maintain appropriate records, obtain and maintain appropriate insurance, implement reporting procedures, properly close any storage tanks, and take or cause to be taken all other actions necessary or required under applicable state and federal Legal Requirements, as such now exists or may hereafter be adopted or amended in connection with the installation, use, maintenance, management, operation, upgrading and closure of such storage tanks. Notwithstanding anything to the contrary contained herein, Tenant shall have no right to use or install any underground storage tanks at the Project.

  • Underground Storage Tanks In accordance with the requirements of Section 3(g) of the D.C. Underground Storage Tank Management Act of 1990, as amended by the District of Columbia Underground Storage Tank Management Act of 1990 Amendment Act of 1992 (D.C. Code § 8-113.01, et seq.) (collectively, the “UST Act”) and the applicable D.C. Underground Storage Tank Regulations, 20 DCMR Chapter 56 (the “UST Regulations”), District hereby informs the Developer that it has no knowledge of the existence or removal during its ownership of the Property of any “underground storage tanks” (as defined in the UST Act). Information pertaining to underground storage tanks and underground storage tank removals of which the D.C. Government has received notification is on file with the District Department of the Environment, Underground Storage Tank Branch, 00 X Xxxxxx, X.X., Xxxxx Xxxxx, Xxxxxxxxxx, X.X., 00000, telephone (000) 000-0000. District’s knowledge for purposes of this Section shall mean and be limited to the actual knowledge of Xxxxxx Xxxxx, Property Acquisition and Disposition Division of the Department of Housing and Community Development, telephone no. (000) 000-0000. The foregoing is set forth pursuant to requirements contained in the UST Act and UST Regulations and does not constitute a representation or warranty by District.

  • Interconnection 2.1.10 Startup Testing and Commissioning

Time is Money Join Law Insider Premium to draft better contracts faster.