Common use of Certification Regarding Suspension or Debarment Clause in Contracts

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment This document consists of 2 pages. Except as modified by this Amendment No. 1, all provisions of the Contract remain in full force and effect. The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. STATE OF VERMONT MARBLE VALLEY ENGINEERING, P.C. By: Name: Xxxxxxxxxxx Xxxx Title: BGS Commissioner Date: By: Name: Title: Date: MASTER COPY DISTRIBUTED (Contractor, Accounting, Regional Director, Project Manager, DFM) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES (Revised 03/2018) THE XXXXX XX XXXXXXX XXXXXXXX XX. 00000 STANDARD FORM OF AGREEMENT BETWEEN STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made this 18th day of June in the year 2018. BETWEEN Agency of Administration Department of Buildings and General Services Two Governor Aiken Avenue Montpelier, Vermont 05633-5801 the State. Marble Valley Engineering, P.C. 00 Xxxxx Xxxxxx Xxxxxxx, Xxxxxxx 00000 the ARCHITECT/ENGINEER. It is the intention of the State to utilize architectural and engineering services on a as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth below: The period of performance under this contract shall commence on June 18th, 2018 and end on June 18th, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying, and construction estimating, as required for the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such as labor, material, equipment, etc.

Appears in 3 contracts

Samples: Vermont Contract, Vermont Contract, Vermont Contract

AutoNDA by SimpleDocs

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s 's principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s 's debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment This document consists of 2 5 pages. Except as modified by this Amendment No. 14, all provisions of the Contract remain in full force and effect. The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. STATE OF VERMONT MARBLE VALLEY ENGINEERING, P.C. ByCONTACT: XXXX XXXXXX PURCHASING AGENT 000-000-0000 FAX 000-000-0000 XXXX.XXXXXX@Xxxxxxx.xxx Unit Xxx Xxx Line # Item ID Item Desc UOM Price Qty Amt WE THE UNDERSIGNED PARTIES AGREE TO BE BOUND BY THIS CONTRACT By the STATE of VERMONT By the CONTRACTOR Date: Signature: Name: Xxxxxxxxxxx Xxxx Title: BGS Commissioner Date: BySignature: Name: Title: DateEmail: MASTER COPY DISTRIBUTED (Contractor, Accounting, Regional Director, Project Manager, DFM) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES (Revised 03/2018) Title: Email: Line # Item ID Item Desc UOM Unit Price Max Qty Max Amt 1 SNOWPLOW BLADE CUTTING EDGES. CONTACT CONTRACTOR FOR PRICE QUOTE EA 0.01000 0.00 0.00 BLADES PER THE XXXXX XX XXXXXXX XXXXXXXX XX. 00000 ATTACHED LIST STANDARD FORM OF AGREEMENT BETWEEN STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made this 18th day of June in the year 2018. BETWEEN Agency of Administration Department of Buildings and General Services Two Governor Aiken Avenue Montpelier, Vermont 05633-5801 the State. Marble Valley Engineering, P.C. 00 Xxxxx Xxxxxx Xxxxxxx, Xxxxxxx 00000 the ARCHITECT/ENGINEER. It is the intention of the State to utilize architectural and engineering services on a as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth below: The period of performance under this contract shall commence on June 18th, 2018 and end on June 18th, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying, and construction estimating, as required for the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such as labor, material, equipment, etc.CONTRACT FOR SNOWPLOWBLADE CUTTING EDGES

Appears in 3 contracts

Samples: bgs.vermont.gov, bgs.vermont.gov, bgs.vermont.gov

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment This document consists of 2 pages. Except as modified by this Amendment No. 1, all provisions of the Contract remain in full force and effect. The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. STATE OF VERMONT MARBLE VALLEY ENGINEERINGXXXXXX ASSOCIATES, P.C. INC. By: Name: Xxxxxxxxxxx Xxxx Title: BGS Commissioner Date: By: Name: Name: Title: Title: Date: Date: MASTER COPY DISTRIBUTED (Contractor, Accounting, Regional Director, Project Manager, DFM) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES (Revised 03/2018) THE XXXXX XX XXXXXXX XXXXXXXX XX. 00000 STATE OF VERMONT STANDARD FORM OF AGREEMENT BETWEEN STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made this 18th day of June in the year 2018. BETWEEN Agency of Administration Department of Buildings and General Services Two Governor Aiken Avenue Montpelier, Vermont 05633-5801 the State. Marble Valley EngineeringXxxxxx Associates, P.C. Inc. 00 Xxxxx Xxxxxxx Xxxxxx XxxxxxxLittleton, Xxxxxxx 00000 New Hampshire 03561 the ARCHITECT/ENGINEER. It is the intention of the State to utilize architectural and engineering services on a as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth below: The period of performance under this contract shall commence on June 18thAugust 1st, 2018 and end on June 18th, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying, and construction estimating, as required for the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such as labor, material, equipment, etc.

Appears in 2 contracts

Samples: Vermont Contract, Vermont Contract

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment This document consists of 2 3 pages. Except as modified by this Amendment No. 1, all provisions of the Contract remain in full force and effect. [Remainder of Page Intentionally Left Blank] Contract #37611 Contract #37611 The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. STATE OF VERMONT MARBLE VALLEY ENGINEERINGLUXBRUSH PAINTING CO., P.C. INC. By: Name: Xxxxxxxxxxx Xxxx Title: BGS Commissioner Date: By: Name: Name: Title: Title: Date: MASTER COPY DISTRIBUTED (Contractor, Accounting, Regional Director, Project Manager, DFM) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES (Revised 03/2018) THE XXXXX XX XXXXXXX XXXXXXXX XX. 00000 STANDARD FORM OF AGREEMENT BETWEEN STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made this 18th day Date: State of June in the year 2018. BETWEEN Agency of Administration Department of Vermont Buildings and General Services Two Governor Engineering Division 2 Gov Aiken Avenue Montpelier, Vermont 05633Ave Drawer 33 Montpelier VT 05633 United States CONTRACT Contract ID 0000000000000000000037611 Page 1 of 2 Contract Dates 01/01/2019 to 12/31/2019 Origin CPS Description: Retainer Painting Services Contract Maximum$300,000.00 Buyer Name Buyer Phone Xxxx Xxxxx Xxxxxxx Contract Status Approved Vendor ID 0000272806 LuxBrush Painting Co Inc XX Xxx 0000 Xxxxxxxxxx Xxx XX 00000 Xxxxxx Xxxxxx Phone #: 802/000-5801 the State. Marble Valley Engineering, P.C. 00 Xxxxx Xxxxxx Xxxxxxx, Xxxxxxx 00000 the ARCHITECT/ENGINEER. It is the intention of the State to utilize architectural and engineering services on a as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth below: The period of performance under this contract shall commence on June 18th, 2018 and end on June 18th, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying, and construction estimating, as required for the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such as labor, material, equipment, etc.0000 Line # Item ID Item Desc UOM Unit Price Max Qty Max Amt 1 Retainer Painting Services JOB 0.01000 0.00 300,000.00 CONTRACT TERMS AND ADDITIONAL INFORMATION STANDARD CONTRACT FOR SERVICES

Appears in 2 contracts

Samples: Vermont Contract, Vermont Contract

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment This document consists of 2 4 pages. Except as modified by this Amendment No. 1, all provisions of the Contract remain in full force and effect. The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. STATE OF VERMONT MARBLE VALLEY ENGINEERINGXxxxxx Moving & Storage, P.C. Inc By: Name: Xxxxxxxxxxx Xxxx _Jennifer Fitch Acting Commissioner - Buildings and Title: BGS Commissioner General Services Date: By: Name: Title: Date: MASTER COPY DISTRIBUTED (Contractor, Accounting, Regional Director, Project Manager, DFM) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES (Revised 03/2018) THE XXXXX XX XXXXXXX XXXXXXXX XX. 00000 STANDARD FORM OF AGREEMENT BETWEEN STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made VERMONT- FEDERAL TERMS SUPPLEMENT (Non-Construction) for all Contracts and Purchases1‌ of Products and Services Connected with 2020 Pandemic XXXX ANTI-LOBBYING AMENDMENT Contractors who apply or bid for an award of $100,000 or more certify that each tier certifies to the tier above that it will not and has not used Federal appropriated funds to pay any person or organization for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, officer or employee of Congress, or an employee of a Member of Congress in connection with obtaining any Federal contract, grant, or any other award covered by 31 U.S.C. § 1352. Each tier shall also disclose any lobbying with non-Federal funds that takes place in connection with obtaining any Federal award. Such disclosures are forwarded from tier to tier, up to the recipient who in turn will forward the certification(s) to the awarding agency PROCUREMENT OF RECOVERED MATERIALS In the performance of this 18th day contract, the Contractor shall make maximum use of June in products containing recovered materials that are EPA-designated Items unless the year 2018. BETWEEN Agency of Administration Department of Buildings and General Services Two Governor Aiken Avenue Montpelier, Vermont 05633-5801 the State. Marble Valley Engineering, P.C. 00 Xxxxx Xxxxxx Xxxxxxx, Xxxxxxx 00000 the ARCHITECT/ENGINEER. It is the intention of the State to utilize architectural and engineering services on a as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth below: The period of performance under this contract shall commence on June 18th, 2018 and end on June 18th, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may products cannot be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying, and construction estimating, as required for the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such as labor, material, equipment, etc.acquired-

Appears in 2 contracts

Samples: Vermont Contract, Vermont Contract

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment State and Federal Terms for Products and Services related the 2020 Covid-19 Pandemic. Contractor agrees that “STATE OF VERMONT- FEDERAL TERMS SUPPLEMENT (Non- Construction) for all Contracts and Purchases of Products and Services Connected with 2020 Pandemic,” which is attached as Attachment D to this amendment, applies to any products or services provided to the State, at any time, in connection with the 2020 Pandemic. This document consists of 2 4 pages. Except as modified by this Amendment No. 1, 1 all provisions of the Contract remain in full force and effect. Contract #34359 The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. STATE OF VERMONT MARBLE VALLEY ENGINEERING, P.C. By: Dataman USA By: Name: Xxxxxxxxxxx Xxxx Title: BGS Commissioner Date: By: Name: Title: Title: Date: MASTER COPY DISTRIBUTED (Contractor, Accounting, Regional Director, Project Manager, DFM) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES (Revised 03/2018) THE XXXXX XX XXXXXXX XXXXXXXX XX. 00000 STANDARD FORM OF AGREEMENT BETWEEN Date: Attachment D STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made VERMONT- FEDERAL TERMS SUPPLEMENT (Non-Construction) for all Contracts and Purchases1 of Products and Services Connected with 2020 Pandemic XXXX ANTI-LOBBYING AMENDMENT Contractors who apply or bid for an award of $100,000 or more certify that each tier certifies to the tier above that it will not and has not used Federal appropriated funds to pay any person or organization for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, officer or employee of Congress, or an employee of a Member of Congress in connection with obtaining any Federal contract, grant, or any other award covered by 31 U.S.C. § 1352. Each tier shall also disclose any lobbying with non-Federal funds that takes place in connection with obtaining any Federal award. Such disclosures are forwarded from tier to tier, up to the recipient who in turn will forward the certification(s) to the awarding agency PROCUREMENT OF RECOVERED MATERIALS In the performance of this 18th day contract, the Contractor shall make maximum use of June in products containing recovered materials that are EPA-designated Items unless the year 2018. BETWEEN Agency of Administration Department of Buildings and General Services Two Governor Aiken Avenue Montpelier, Vermont 05633-5801 the State. Marble Valley Engineering, P.C. 00 Xxxxx Xxxxxx Xxxxxxx, Xxxxxxx 00000 the ARCHITECT/ENGINEER. It is the intention of the State to utilize architectural and engineering services on a as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth below: The period of performance under this contract shall commence on June 18th, 2018 and end on June 18th, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may products cannot be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying, and construction estimating, as required for the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such as labor, material, equipment, etc.acquired-

Appears in 2 contracts

Samples: Vermont Contract, Vermont Contract

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s 's principals Unit Xxx Xxx Line # Item ID Item Desc UOM Price Qty Amt (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s 's debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment Sole Source Contract for Services. This Contract results from a "sole source" procurement under State of Vermont Administrative Bulletin 3.5 process and Contractor hereby certifies that it is and will remain in compliance with the campaign contribution restrictions under 17 V.S.A. § 2950. SOV Cybersecurity Standard 19-01. All products and service provided to or for the use of the State under this Contract shall be in compliance with State of Vermont Cybersecurity Standard 19-01, which Contractor acknowledges has been provided to it, and is available on-line at the following URL:xxxxx://xxxxxxxxxxxxxxx.xxxxxxx.xxx/cybersecurity/cybersecurity-standards-and-directives This document consists of 2 7 pages. Except as modified by this Amendment No. 16, all provisions of the Contract remain in full force and effect. The signatures WE THE UNDERSIGNED PARTIES AGREE TO BE BOUND BY THIS CONTRACT By the STATE of VERMONT By the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. STATE OF VERMONT MARBLE VALLEY ENGINEERING, P.C. ByCONTRACTOR Date: Signature: Date: Signature: Name: Xxxxxxxxxxx Xxxx Title: BGS Commissioner Date: By: Xxxxxxxx Xxxxx Name: Title: Date: MASTER COPY DISTRIBUTED (Contractor, Accounting, Regional Director, Project Manager, DFM) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES (Revised 03/2018) THE XXXXX XX XXXXXXX XXXXXXXX XX. 00000 STANDARD FORM OF AGREEMENT BETWEEN STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made this 18th day of June in the year 2018. BETWEEN Agency of Administration Department of Commissioner - Buildings and General Services Two Governor Aiken Avenue Montpelier, Vermont 05633-5801 the StateTitle: Email: Title: Email: Line # Item ID Item Desc UOM Unit Price Max Qty Max Amt 1 SNOWPLOW BLADE CUTTING EDGES. Marble Valley Engineering, P.C. 00 Xxxxx Xxxxxx Xxxxxxx, Xxxxxxx 00000 the ARCHITECT/ENGINEER. It is the intention of the State to utilize architectural and engineering services on a as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth below: The period of performance under this contract shall commence on June 18th, 2018 and end on June 18th, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying, and construction estimating, as required for the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such as labor, material, equipment, etc.CONTACT CONTRACTOR FOR PRICE QUOTE EA 0.01000 0.00 0.00 BLADES PER THE ATTACHED LIST STANDARD CONTRACT FOR SNOWPLOWBLADE CUTTING EDGES

Appears in 2 contracts

Samples: bgs.vermont.gov, bgs.vermont.gov

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s Contractor¿s principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s State¿s debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment State and Federal Terms for Products and Services related the 2020 Covid-19 Pandemic. Contractor agrees that "STATE OF VERMONT- FEDERAL TERMS SUPPLEMENT (Non-Construction) for all Contracts and Purchases of Products and Services Connected with 2020 Pandemic," which is attached as Attachment D to this amendment, applies to any products or services provided to the State, at any time, in connection with the 2020 Pandemic. This document consists of 2 5 pages. Except as modified by this Amendment No. 12, all provisions of the Contract remain in full force and effect. The signatures WE THE UNDERSIGNED PARTIES AGREE TO BE BOUND BY THIS CONTRACT By the STATE of VERMONT By the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. STATE OF VERMONT MARBLE VALLEY ENGINEERING, P.C. ByCONTRACTOR Date: Signature: Name: Xxxxxxxxxxx Xxxx Title: BGS Commissioner Date: BySignature: Name: Title: DateEmail: MASTER COPY DISTRIBUTED (Contractor, Accounting, Regional Director, Project Manager, DFM) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES (Revised 03/2018) THE XXXXX XX XXXXXXX XXXXXXXX XX. 00000 STANDARD FORM OF AGREEMENT BETWEEN Title: Email: Attachment D STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made VERMONT- FEDERAL TERMS SUPPLEMENT (Non-Construction) for all Contracts and Purchases1 of Products and Services Connected with 2020 Pandemic XXXX ANTI-LOBBYING AMENDMENT Contractors who apply or bid for an award of $100,000 or more certify that each tier certifies to the tier above that it will not and has not used Federal appropriated funds to pay any person or organization for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, officer or employee of Congress, or an employee of a Member of Congress in connection with obtaining any Federal contract, grant, or any other award covered by 31 U.S.C. § 1352. Each tier shall also disclose any lobbying with non-Federal funds that takes place in connection with obtaining any Federal award. Such disclosures are forwarded from tier to tier, up to the recipient who in turn will forward the certification(s) to the awarding agency PROCUREMENT OF RECOVERED MATERIALS In the performance of this 18th day contract, the Contractor shall make maximum use of June in products containing recovered materials that are EPA-designated Items unless the year 2018. BETWEEN Agency of Administration Department of Buildings and General Services Two Governor Aiken Avenue Montpelier, Vermont 05633-5801 the State. Marble Valley Engineering, P.C. 00 Xxxxx Xxxxxx Xxxxxxx, Xxxxxxx 00000 the ARCHITECT/ENGINEER. It is the intention of the State to utilize architectural and engineering services on a as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth below: The period of performance under this contract shall commence on June 18th, 2018 and end on June 18th, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may products cannot be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying, and construction estimating, as required for the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such as labor, material, equipment, etc.acquired-

Appears in 2 contracts

Samples: Vermont Contract, Vermont Contract

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s 's principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s 's debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment Sole Source Contract for Services. This Contract results from a "sole source" procurement under State of Vermont Administrative Bulletin 3.5 process and Contractor hereby certifies that it is and will remain in compliance with the campaign contribution restrictions under 17 V.S.A. § 2950. SOV Cybersecurity Standard 19-01. All products and service provided to or for the use of the State under this Contract shall be in compliance with State of Vermont Cybersecurity Standard 19-01, which Contractor acknowledges has been provided to it, and is available on-line at the following URL:xxxxx://xxxxxxxxxxxxxxx.xxxxxxx.xxx/cybersecurity/cybersecurity-standards-and-directives This document consists of 2 pages. Except as modified by this Amendment No. 1, all provisions of the Contract remain in full force and effect. The signatures [Remainder of the undersigned indicate that each has read and agrees to be bound by this Amendment to the ContractPage Intentionally Left Blank] Unit Max Max Line # Item ID Item Desc UOM Price Qty Amt CONTRACTOR POC: XXXXX XXXXXX EMAIL: XXXXXXX@XXXXXXXXXXXX.XXX Phone: 000-000-0000. FAX: 000-000-0000 Website: xxx.xxxxxxxxxxxx.xxx Alternate Email: xxxx@xxxxxxxxxxxx.xxx . QUANTITY: THE ANNUAL VALUE AND QUANTITIES ARE ESTIMATED ONLY BASED ON PRIOR USAGE; ACTUAL PURCHASES MAY BE HIGHER OR LOWER DEPENDING ON THE STATE'S NEEDS. THE CONTRACT MAXIMUM IS NOT REFLECTIVE OF ACTUAL USAGE. DELIVERY: RESPONSIBILITY FOR PRODUCT DELIVERY REMAINS WITH THE CONTRACTOR UNTIL THE PRODUCT IS PROPERLY DELIVERED AND SIGNED FOR IN ACCORDANCE WITH THE OFFICE OF PURCHASING & CONTRACTING TERMS AND CONDITIONS. SHIPMENTS SHALL BE SECURELY AND PROPERLY PACKED, ACCORDING TO ACCEPTED COMMERCIAL PRACTICES, WITHOUT EXTRA CHARGE FOR PACKING CASES OR OTHER CONTAINERS. SUCH CONTAINERS WILL REMAIN THE PROPERTY OF THE STATE UNLESS OTHERWISE STATED. DELIVERED GOODS THAT DO NOT CONFORM TO THE SPECIFICATIONS OR ARE NOT IN GOOD CONDITION UPON RECEIPT SHALL BE REPLACED PROMPTLY BY THE CONTRACTOR. PRICING: ALL EQUIPMENT PRICING IS TO INCLUDE F.O.B. DELIVERY TO THE ORDERING FACILITY. NO REQUEST FOR EXTRA DELIVERY COST WILL BE HONORED. ALL EQUIPMENT SHALL BE DELIVERED ASSEMBLED, SERVICED, OILED, AND READY FOR IMMEDIATE USE, UNLESS OTHERWISE REQUESTED BY THE PURCHASING AGENCY. QUALITY: ALL PRODUCTS PROVIDED UNDER THESE AGREEMENTS WILL BE NEW AND UNUSED, UNLESS OTHERWISE STATED. FACTORY SECONDS OR REMANUFACTURED PRODUCTS WILL NOT BE ACCEPTED UNLESS SPECIFICALLY REQUESTED BY THE PURCHASING AGENCY. ALL PRODUCTS PROVIDED BY THE CONTRACTOR MUST MEET ALL FEDERAL, STATE, AND LOCAL STANDARDS FOR QUALITY AND SAFETY REQUIREMENTS. PRODUCTS NOT MEETING THESE STANDARDS WILL BE DEEMED UNACCEPTABLE AND RETURNED TO THE CONTRACTOR FOR CREDIT AT NO CHARGE TO THE STATE. METHOD OF ORDERING: PURCHASE ORDERS MUST BE USED TO ORDER ITEMS AVAILABLE UNDER THIS CONTRACT. IF VERBAL ORDERS ARE GIVEN A CONFIRMING PURCHASE ORDER MUST BE ISSUED. INVOICING: ALL INVOICES ARE TO BE RENDERED BY THE CONTRACTOR ON THE VENDOR'S STANDARD BILLHEAD AND FORWARDED DIRECTLY TO THE INSTITUTION OR AGENCY ORDERING MATERIALS OR SERVICES AND SHALL SPECIFY THE ADDRESS TO WHICH PAYMENTS WILL BE SENT. CANCELLATION: THE STATE SPECIFICALLY RESERVES THE RIGHT TO CANCEL THE CONTRACT, OR ANY PORTION THEREOF, IF, IN THE OPINION OF ITS COMMISSIONER OF BUILDINGS AND GENERAL SERVICES, THE SERVICES OR MATERIALS SUPPLIED BY THE CONTRACTOR ARE NOT SATISFACTORY OR ARE NOT CONSISTENT WITH THE TERMS OF THE CONTRACT DEFAULT: IN CASE OF DEFAULT OF THE CONTRACTOR, THE STATE MAY PROCURE THE MATERIALS OR SUPPLIES FROM OTHER SOURCES AND HOLD THE CONTRACTOR RESPONSIBLE FOR ANY EXCESS COST OCCASIONED THEREBY, PROVIDED, THAT IF PUBLIC NECESSITY REQUIRES THE USE OF MATERIALS OR SUPPLIES NOT CONFORMING TO THE SPECIFICATIONS THEY MAY BE ACCEPTED AND PAYMENT THEREFORE SHALL BE MADE AT A PROPER REDUCTION IN PRICE. CONTRACT TERMS: THIS CONTRACT WILL BE SUBJECT TO REVIEW THROUGHOUT ITS TERM. THE STATE WILL CONSIDER CANCELLATION UPON DISCOVERY THAT A VENDOR IS IN VIOLATION OF ANY PORTION OF THE AGREEMENT, INCLUDING AN INABILITY BY THE VENDOR TO PROVIDE THE PRODUCTS, SUPPORT, AND/OR SERVICE OFFERED IN THEIR RESPONSE. THE VISA PURCHASING CARD MAY BE USED AS A FORM OF PAYMENT UNDER THIS CONTRACT. VERMONT STATE COLLEGES: THIS CONTRACT IS ALSO AVAILABLE FOR USE BY THE UNIVERSITY OF VERMONT AND THE VERMONT STATE COLLEGES INC., A SEPARATE CORPORATION, HAVING UNDER ITS JURISDICTION CASTLETON STATE COLLEGE, XXXXXXX STATE COLLEGE, XXXXXX STATE COLLEGE, COMMUNITY COLLEGE OF VERMONT, AND THE VERMONT TECHNICAL COLLEGE. TOWNS AND SCHOOLS OF THE STATE OF VERMONT MARBLE VALLEY ENGINEERINGVERMONT: AT THE BIDDER'S ELECTION POLITICAL SUBDIVISIONS AND INDEPENDENT COLLEGES OF THE STATE MAY PARTICIPATE IN STATE CONTRACTS AT THE SAME PRICES, P.C. By: Name: Xxxxxxxxxxx Xxxx Title: BGS Commissioner Date: By: Name: Title: Date: MASTER COPY DISTRIBUTED (Contractor, Accounting, Regional Director, Project Manager, DFM) DEPARTMENT TERMS AND CONDITIONS. ITEMS FURNISHED TO POLITICAL SUBDIVISIONS AND INDEPENDENT COLLEGES WILL BE BILLED DIRECTLY TO AND PAID FOR BY THE POLITICAL SUBDIVISIONS OR INDEPENDENT COLLEGES AND NEITHER THE STATE NOR ITS COMMISSIONER OF BUILDINGS AND GENERAL SERVICES PERSONALLY OR OFFICIALLY ASSUMES ANY RESPONSIBILITY FOR THESE PAYMENTS. Unit Max Max Line # Item ID Item Desc UOM Price Qty Amt AGENCIES & DEPARTMENTS ARE REQUESTED TO ADVISE THE PURCHASING AGENT AT ONCE OF THE FAILURE ON THE PART OF THE CONTRACTOR TO FULFILL ANY OF THE TERMS OR CONDITIONS OF THIS CONTRACT. PLEASE REFER TO THE ASSIGNED CONTRACT NUMBER/PURCHASE ORDER # ON ALL CORRESPONDENCE, DELIVERY DOCUMENTS AND INVOICES. ======================================================= JUNE 29, 2017 AMENDMENT #01 - TO EXTEND CONTRACT FOR A ONE YEAR PERIOD AT THE SAME PRICES, TERMS AND CONDITIONS. ======================================================= JUNE 14, 2018 AMENDMENT #02 - TO EXTEND CONTRACT FOR A ONE YEAR PERIOD AND TO INCORPORATE THE ATTACHED REVISED PRICE LIST INTO THE CONTRACT. ALL OTHER PRICES, TERMS AND CONDITIONS REMAIN THE SAME. . ATTACHMENT C: ATTACHMENT C: STANDARD STATE CONTRACT PROVISIONS FOR CONTRACTS AND GRANTS DATED DECEMBER 15, 2017 SEE ATTACHED, WHICH SUPERSEDES ALL PRIOR VERSIONS OF ATTACHMENT C. . CONTRACTOR CERTIFIES UNDER THE PAINS AND PENALITIES OF PERJURY THAT, AS OF THE DATE THIS CONTRACT AMENDMENT IS SIGNED, CONTRACTOR IS IN GOOD STANDING WITH RESPECT TO, OR IN FULL COMPLIANCE WITH A PLAN TO PAY ANY AND ALL TAXES DUE THE STATE OF VERMONT. . CERTIFICATION REGARDING SUSPENSION OR DEBARMENT. CONTRACTOR CERTIFIES UNDER THE PAINS AND PENALTIES OF PERJURY THAT, AS OF THIS DATE THIS CONTRACT AMENDMENT IS SIGNED, NEITHER PARTY NO PARTY'S PRINCIPALS (Revised 03/2018OFFICERS, DIRECTORS, OWNERS, OR PARTNERS) ARE PRESENTLY DEBARRED, SUSPENDED, PROPOSED FOR DEBARMENT, DECLARED INELIGIBLE OR EXCLUDED FROM PARTICIPATION IN FEDERAL PROGRAMS, OR PROGRAMS SUPPORTED IN WHOLE OR IN PART BY FEDERAL FUNDS. PARTY FURTHER CERTIFIES UNDER PAINS AND PENALTIES OF PERJURY THAT, AS OF THE XXXXX XX XXXXXXX XXXXXXXX XXDATE THIS AGREEMENT IS SIGNED, PARTY IS NOT PRESENTLY DEBARRED, SUSPENDED, NOR NAMED ON THE STATE'S DEBARMENT LIST AT: XXXX://XXX.XXXXXXX.XXX/PURCHASING/DEBARMENT. 00000 STANDARD FORM . CHILD SUPPORT (APPLICABLE TO NATURAL PERSONS ONLY; NOT APPLICABLE TO CORPORATIONS, PARTNERSHIPS OR LLCS): CONTRACTOR IS UNDER NO OBLIGATION TO PAY CHILD SUPPORT OR IS IN GOOD STANDING WITH RESPECT TO OR IN FULL COMPLIANCE WITH A PLAN TO PAY ANY AND ALL CHILD SUPPORT PAYABLE UNDER A SUPPORT ORDER AS OF AGREEMENT BETWEEN THE DATE OF THIS AMENDMENT. =========================================================== AMENDMENT#3 (MAY 2019). THIS CHANGE ORDER EXERCISES THE THIRD OF THE FIVE ONE-YEAR OPTIONS TO RENEW, AND EXTENDS THE CONTRACT FOR ONE ADDITIONAL YEAR TO 08/26/2020, AT THE SAME PRICING, TERMS, AND CONDITIONS. STATE OF VERMONT ATTACHMENT C: STANDARD STATE CONTRACT PROVISIONS DATED DECEMBER 15, 2017 IS ATTACHED AND INCORPORATED AS PART OF THIS ORDER. CONTRACTOR CERTIFIES UNDER THE PAINS AND PENALTIES OF PERJURY THAT AS OF THE DATE THIS AMENDMENT IS SIGNED, CONTRACT IS IN GOOD STANDING TO OR IN FULL COMPLIANCE WITH A PLAN TO PAY ANY AGENCY THEREOF AND ARCHITECTALL TAXES DUE THE STATE OF VERMONT. CERTIFICATION REGARDING SUSPENSION OR DISBARMENT. CONTRACTOR CERTIFIES UNDER THE PAINS AND PENALTIES OF PERJURY THAT, AS OF THIS DATE THIS CONTRACT AMENDMENT IS SIGNED, NEITHER PARTY NO PARTY'S PRINCIPALS (OFFICERS, DIRECTORS, OWNERS, OR PARTNERS) ARE PRESENTLY DEBARRED, SUSPENDED, PROPOSED FOR DEBARMENT, DECLARED INELIGIBLE OR EXCLUDED FROM PARTICIPATION IN FEDERAL PROGRAMS, OR PROGRAMS SUPPORTED IN WHOLE OR IN PART BY FEDERAL FUNDS. CHILD SUPPORT (APPLICABLE TO NATURAL PERSONS ONLY; NOT APPLICABLE TO CORPORATIONS, PARTNERSHIPS OR LLCS): CONTRACTOR IS UNDER NO OBLIGATION TO PAY CHILD SUPPORT OR IS IN GOOD STANDING WITH RESPECT TO OR IN FULL COMPLIANCE WITH A PLAN TO PAY ANY AND ALL CHILD SUPPORT PAYABLE UNDER A SUPPORT ORDER AS OF THE DATE OF THIS AMENDMENT. PARTY FURTHER CERTIFIES UNDER PAINS AND PENALTIES OF PERJURY THAT, AS OF THE DATE THIS AGREEMENT IS SIGNED, Unit Xxx Xxx Line # Item ID Item Desc UOM Price Qty Amt PARTY IS NOT PRESENTLY DEBARRED, SUSPENDED, NOR NAMED ON THE STATE'S DEBARMENT LIST AT: XXXX://XXX.XXXXXXX.XXX/ENGINEER AGREEMENT made this 18th day of June in the year 2018PURCHASING/DEBARMENT. BETWEEN Agency of Administration Department of Buildings and General Services Two Governor Aiken Avenue Montpelier, Vermont 05633. IF YOU HAVE ANY QUESTIONS REGARDING THIS DOCUMENT PLEASE CONTACT: XXXX XXXXXX PURCHASING AGENT 000-5801 the State. Marble Valley Engineering, P.C. 00 Xxxxx Xxxxxx Xxxxxxx, Xxxxxxx 00000 the ARCHITECT/ENGINEER. 000-0000 FAX 000-000-0000 xxxx.xxxxxx@Xxxxxxx.xxx ============================================================ STATE OF VERMONT Contract # 30013 CONTRACT AMENDMENT #4 It is the intention of hereby agreed by and between the State to utilize architectural of Vermont,Office of Purchasing and engineering services on Contracting (the "State") and Xxxxxx North America Inc, with a principal place of business in Charleston, SC (the "Contractor") that the contract between them originally dated as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth below: The period of performance under this contract shall commence on June 18thAugust 26, 2018 and end on June 18th2015, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying, and construction estimatingContract # 30013, as required for amended to date, (the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such "Contract") is hereby amended as labor, material, equipment, etc.follows:

Appears in 2 contracts

Samples: bgs.vermont.gov, bidopportunities.iowa.gov

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment xxxx://xxx.xxxxxxx.xxx/purchasing/debarment. SOV Cybersecurity Standard 19-01. All products and service provided to or for the use of the State under this Contract shall be in compliance with State of Vermont Cybersecurity Standard 19-01, which Contractor acknowledges has been provided to it, and is available on-line at the following URL:xxxxx://xxxxxxxxxxxxxxx.xxxxxxx.xxx/cybersecurity/cybersecurity-standards-and- directives This document consists of 2 pages. Except as modified by this Amendment No. 1, 3 all provisions of the Contract remain in full force and effect. Contract #30882 Amendment #3 The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. STATE OF VERMONT MARBLE VALLEY ENGINEERING, P.C. CDW Government LLC By: Name: Xxxxxxxxxxx Xxxx Title: BGS Commissioner Date: By: Name: Name: Title: Title: Date: MASTER COPY DISTRIBUTED (Contractor, Accounting, Regional Director, Project Manager, DFM) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES (Revised 03/2018) THE XXXXX XX XXXXXXX XXXXXXXX XX. 00000 STANDARD FORM OF AGREEMENT BETWEEN Date: STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made this 18th day CONTRACT AMENDMENT Contract #30882 Amendment #2 It is hereby agreed by and between the State of June in the year 2018. BETWEEN Agency of Administration Vermont, Department of Buildings and General Services Two Governor Aiken Avenue MontpelierServices, Vermont 05633-5801 Office of Purchasing and Contracting. (the "State. Marble Valley Engineering") and CDW Government LLC with a principal place of business in Vernon Hills, P.C. 00 Xxxxx Xxxxxx XxxxxxxIL (the "Contractor") that the contract between them originally dated as of March 01, Xxxxxxx 00000 the ARCHITECT/ENGINEER. It is the intention of the State to utilize architectural and engineering services on a as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth below: The period of performance under this contract shall commence on June 18th2016, 2018 and end on June 18th, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying, and construction estimatingContract #30882, as required for amended to date, (the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such “Contract”) is hereby amended as labor, material, equipment, etc.follows:

Appears in 2 contracts

Samples: Vermont Contract, Vermont Contract

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment This document consists of 2 pages. Except as modified by this Amendment No. 1, all provisions of the Contract remain in full force and effect. The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. STATE OF VERMONT MARBLE VALLEY ENGINEERINGKIRICK ENGINEERING ASSOCIATES, P.C. By: Name: Xxxxxxxxxxx Xxxx Title: BGS Commissioner Date: By: Name: Name: Title: Title: Date: Date: MASTER COPY DISTRIBUTED (Contractor, Accounting, Regional Director, Project Manager, DFM) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES (Revised 03/2018) THE XXXXX XX XXXXXXX XXXXXXXX XX. 00000 STATE OF VERMONT STANDARD FORM OF AGREEMENT BETWEEN STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made this 18th day of June in the year 2018. BETWEEN Agency of Administration Department of Buildings and General Services Two Governor Aiken Avenue Montpelier, Vermont 05633-5801 the State. Marble Valley EngineeringKirick Engineering Associates P.C. 0000 Xxxxxxxxx Xxxx, P.C. 00 Xxxxx Xxxxxx Xxxxxxx000 Xxxxxxxxx, Xxxxxxx 00000 the ARCHITECT/ENGINEER. It is the intention of the State to utilize architectural and engineering services on a as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth below: The period of performance under this contract shall commence on June 18th, 2018 and end on June 18th, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying, and construction estimating, as required for the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such as labor, material, equipment, etc.not

Appears in 2 contracts

Samples: Vermont Contract, Vermont Contract

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment State and Federal Terms for Products and Services related the 2020 Covid-19 Pandemic. Contractor agrees that “STATE OF VERMONT- FEDERAL TERMS SUPPLEMENT (Non- Construction) for all Contracts and Purchases of Products and Services Connected with 2020 Pandemic,” which is attached as Attachment D to this amendment, applies to any products or services provided to the State, at any time, in connection with the 2020 Pandemic. This document consists of 2 4 pages. Except as modified by this Amendment No. 1, 1 all provisions of the Contract remain in full force and effect. The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. STATE OF VERMONT MARBLE VALLEY ENGINEERINGBy: 22nd Century Technologies, P.C. Inc By: Name: Xxxxxxxxxxx Xxxx Title: BGS Commissioner Date: By: Name: Title: Title: Date: MASTER COPY DISTRIBUTED (Contractor, Accounting, Regional Director, Project Manager, DFM) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES (Revised 03/2018) THE XXXXX XX XXXXXXX XXXXXXXX XX. 00000 STANDARD FORM OF AGREEMENT BETWEEN Date: Attachment D STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made VERMONT- FEDERAL TERMS SUPPLEMENT (Non-Construction) for all Contracts and Purchases1 of Products and Services Connected with 2020 Pandemic XXXX ANTI-LOBBYING AMENDMENT Contractors who apply or bid for an award of $100,000 or more certify that each tier certifies to the tier above that it will not and has not used Federal appropriated funds to pay any person or organization for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, officer or employee of Congress, or an employee of a Member of Congress in connection with obtaining any Federal contract, grant, or any other award covered by 31 U.S.C. § 1352. Each tier shall also disclose any lobbying with non-Federal funds that takes place in connection with obtaining any Federal award. Such disclosures are forwarded from tier to tier, up to the recipient who in turn will forward the certification(s) to the awarding agency PROCUREMENT OF RECOVERED MATERIALS In the performance of this 18th day contract, the Contractor shall make maximum use of June in products containing recovered materials that are EPA-designated Items unless the year 2018. BETWEEN Agency of Administration Department of Buildings and General Services Two Governor Aiken Avenue Montpelier, Vermont 05633-5801 the State. Marble Valley Engineering, P.C. 00 Xxxxx Xxxxxx Xxxxxxx, Xxxxxxx 00000 the ARCHITECT/ENGINEER. It is the intention of the State to utilize architectural and engineering services on a as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth below: The period of performance under this contract shall commence on June 18th, 2018 and end on June 18th, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may products cannot be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying, and construction estimating, as required for the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such as labor, material, equipment, etc.acquired-

Appears in 2 contracts

Samples: Vermont Contract, Vermont Contract

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment This document consists of 2 pages. Except as modified by this Amendment No. 1, all provisions of the Contract remain in full force and effect. The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. STATE OF VERMONT MARBLE VALLEY ENGINEERING, P.C. MSK ENGINEERING & DESIGN By: Name: Xxxxxxxxxxx Xxxx Title: BGS Commissioner Date: By: Name: Name: Title: Title: Date: Date: MASTER COPY DISTRIBUTED (Contractor, Accounting, Regional Director, Project Manager, DFM) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES (Revised 03/2018) THE XXXXX XX XXXXXXX XXXXXXXX XX. 00000 STATE OF VERMONT STANDARD FORM OF AGREEMENT BETWEEN STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made this 18th day of June in the year 2018. BETWEEN Agency of Administration Department of Buildings and General Services Two Governor Aiken Avenue Montpelier, Vermont 05633-5801 the State. Marble Valley EngineeringMS&K, P.C. 00 Xxxxx Xxxxxx XxxxxxxInc. XX Xxx 000 Xxxxxxxxxx, Xxxxxxx 00000 the ARCHITECT/ENGINEER. It is the intention of the State to utilize architectural and engineering services on a as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth below: The period of performance under this contract shall commence on June 18th, 2018 and end on June 18th, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying, and construction estimating, as required for the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such as labor, material, equipment, etc.not

Appears in 2 contracts

Samples: Vermont Contract, Vermont Contract

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment State and Federal Terms for Products and Services related the 2020 Covid-19 Pandemic. Contractor agrees that “STATE OF VERMONT- FEDERAL TERMS SUPPLEMENT (Non- Construction) for all Contracts and Purchases of Products and Services Connected with 2020 Pandemic,” which is attached as Attachment D to this amendment, applies to any products or services provided to the State, at any time, in connection with the 2020 Pandemic. This document consists of 2 5 pages. Except as modified by this Amendment No. 1, all provisions of the Contract remain in full force and effect. The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. STATE OF VERMONT MARBLE VALLEY ENGINEERING, P.C. By: Name: Xxxxxxxxxxx Xxxx Title: BGS Commissioner Date: By: Name: Title: Date: MASTER COPY DISTRIBUTED (Contractor, Accounting, Regional Director, Project Manager, DFM) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES (Revised 03/2018) THE XXXXX XX XXXXXXX XXXXXXXX XX. 00000 STANDARD FORM OF AGREEMENT BETWEEN Caledonia Spirits Inc By: Name: Title: Date: Revision Date: 05/30/2019 Attachment D STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made VERMONT- FEDERAL TERMS SUPPLEMENT (Non-Construction) for all Contracts and Purchases1 of Products and Services Connected with 2020 Pandemic XXXX ANTI-LOBBYING AMENDMENT Contractors who apply or bid for an award of $100,000 or more certify that each tier certifies to the tier above that it will not and has not used Federal appropriated funds to pay any person or organization for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, officer or employee of Congress, or an employee of a Member of Congress in connection with obtaining any Federal contract, grant, or any other award covered by 31 U.S.C. § 1352. Each tier shall also disclose any lobbying with non-Federal funds that takes place in connection with obtaining any Federal award. Such disclosures are forwarded from tier to tier, up to the recipient who in turn will forward the certification(s) to the awarding agency PROCUREMENT OF RECOVERED MATERIALS In the performance of this 18th day contract, the Contractor shall make maximum use of June in products containing recovered materials that are EPA-designated Items unless the year 2018. BETWEEN Agency of Administration Department of Buildings and General Services Two Governor Aiken Avenue Montpelier, Vermont 05633-5801 the State. Marble Valley Engineering, P.C. 00 Xxxxx Xxxxxx Xxxxxxx, Xxxxxxx 00000 the ARCHITECT/ENGINEER. It is the intention of the State to utilize architectural and engineering services on a as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth below: The period of performance under this contract shall commence on June 18th, 2018 and end on June 18th, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may products cannot be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying, and construction estimating, as required for the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such as labor, material, equipment, etc.acquired-

Appears in 2 contracts

Samples: Vermont Contract, Vermont Contract

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment This document consists of 2 pages. Except as modified by this Amendment No. 1, 1 all provisions of the Contract remain in full force and effect. The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. STATE OF VERMONT MARBLE VALLEY ENGINEERINGATA Services, P.C. Inc. By: By: Name: Xxxxxxxxxxx Xxxx Xxxxxxxx X.X. Xxxxx Title: BGS Commissioner Date: By: Name: Title: Date: MASTER COPY DISTRIBUTED Date: Attachment F TEMPORARY WORK REQUEST (ContractorAdd sheets if needed, Accountinga detailed Statement of Work is required for technology procurements) Requestor: Phone #: Email: Department: Agency: # Staff Requested: TYPE OF SERVICE NEEDED (indicate with an "X" in the corrersponding box) a. Administrative Support (including Office and Clerical), Regional Directorwhich includes occupations in which workers are responsible for day to day operations such as internal and external communication, Project Managerrecording and retrieval of data and/or information and other paperwork required in an office. May include but is not limited to: bookkeepers, DFMmessengers, clerk‐typists, stenographers, court transcribers, hearing reporters, statistical clerks, dispatchers, license distributors, payroll clerks, office machine and computer operators, legalassistants, cashiers, and toll collectors. b. Commercial/Industrial Workers, which includes occupations in which workers perform jobs which require special manual skill and a thorough and comprehensive knowledge of the processes involved in the work which is acquired through on‐the‐job training and experience or through apprenticeship or other formal training programs. May include but is not limited to: mechanics and repairers, electricians, heavy equipment operators, stationary engineers, skilled machining occupations, carpenters, power plant operators, water and sewage treatment plant operators, service/maintenance. Workers in the following group may operate machinery: Chauffeurs, laundry and dry cleaning operatives, truck drivers, bus drivers, garage Laborers, custodial, gardeners and groundskeepers, refuse collectors, Construction laborers, park rangers (maintenance), farm workers (except managers), craft apprentices/ trainees/ c. Healthcare Staffing/Services, which includes Medical and Healthcare related service jobs including, but is not limited to, all classes of positions, the duties of which are to advise, administer, supervise, research or other professional and scientific work, technical work, or related clerical work in several branches of medicine, surgery, and dentistry or in related patient care services such as dietetics, nursing, occupational therapy, physical therapy, pharmacy, dietitians, doctors, psychologists, and registered nurses d. Information Technology Professional Services, which includes facilities management, database planning/design, systems analysis/ design, network services, programming, conversion & implementation support, network services, project management, data/records management. e. Professional, which includes occupations which require specialized and theoretical knowledge, usually acquired through college training or through work experience and be licensed or certified which provides comparable knowledge to college degree. May Include but is not limited to: personnel and labor relations workers, social workers, economists, lawyers, systems analysts, accountants, engineers, employment and vocational rehabilitation counselors, teachers, trainers or instructors, librarians, management analysts, surveyors and mapping scientists. Position Title: Hours Per Week: Work Shift Time Begin / End: Expected Start Date: Expected End Date: Physical Location of Work (include Room #): Min. Education LevelNeeded : Experience/Certification/Licensure/Required: Min. Yrs. of RelevantExperience: Duties: (Provide a general overview/summary of the essential functions/ responsibilities the position will perform) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES Critical Qualifications/ Skills: (Revised 03/2018Please consider and provide a description of the daily activities and indicate the critical qualifications for a successfulcandidate (i.e. customer service skills, multi‐‐tasking abilities, proficient with Excel etc.) THE YES / NO OTHER PERTINANT INFORMATION Computer hardware to be used: This position will have access to sensitive/confidential information or info. systems. This position will directly work with children, vulnerable adults or in healthcare setting. This position will handle cash, checks, process payments or be involved in procurement. Computer software to be used: This position will require a current background check and/or drug testing. This position will require professional attire to be worn at the workplace. Primary Approver (Print): Sign: Date: Additional Approver (Print): Sign: Date: Additional Approver (Print): Sign: Date: AGO Certification required per 3 VSA Sec 342 for Work Requests ≥ $25,000: Sign: Date: Primary Contact Person (with knowledge of the position) : Phone #: Email: Agency: Dpartment: Dept. ID: Business Unit: Notes: Xxxxxxxx # 00000 XXXXX XX XXXXXXX XXXXXXXX XX. 00000 STANDARD FORM OF AGREEMENT BETWEEN STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made this 18th day CONTRACT AMENDMENT It is hereby agreed by and between the State of June in the year 2018. BETWEEN Agency of Administration Vermont, Department of Buildings and General Services Two Governor Aiken Avenue MontpelierServices, Vermont 05633-5801 Office of Procurement and Contracting (the "State. Marble Valley Engineering") and ATA Services, P.C. 00 Xxxxx Xxxxxx XxxxxxxInc., Xxxxxxx 00000 with a principal place of business in Lakewood, CO (the ARCHITECT/ENGINEER. It is "Contractor") that the intention contract between them originally dated as of the State to utilize architectural and engineering services on a as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth below: The period of performance under this contract shall commence on June 18thSeptember 1, 2018 and end on June 18th2017, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying, and construction estimatingContract # 34361, as required for amended to date, (the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such “Contract”) is hereby amended as labor, material, equipment, etc.follows:

Appears in 2 contracts

Samples: Vermont Contract, Vermont Contract

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s Revision Date: 05/30/2019 debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment This document consists of 2 5 pages. Except as modified by this Amendment No. 12, all provisions of the Contract remain in full force and effect. The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. STATE OF VERMONT MARBLE VALLEY ENGINEERINGXXXX WELDING SUPPLY, P.C. INC. By: Name: Xxxxxxxxxxx Xxxx Title: BGS Commissioner Date: By: Name: Xxxxxxxx Xxxxx Name: Acting Commissioner - Buildings and Title: General Services Title: Date: MASTER COPY DISTRIBUTED (Contractor, Accounting, Regional Director, Project Manager, DFM) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES (Revised 03/2018) THE XXXXX XX XXXXXXX XXXXXXXX XX. 00000 STANDARD FORM OF AGREEMENT BETWEEN Date: Revision Date: 05/30/2019 ATTACHMENT D STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made VERMONT- FEDERAL TERMS SUPPLEMENT (Non-Construction) for all Contracts and Purchases1 of Products and Services Connected with 2020 Pandemic XXXX ANTI-LOBBYING AMENDMENT Contractors who apply or bid for an award of $100,000 or more certify that each tier certifies to the tier above that it will not and has not used Federal appropriated funds to pay any person or organization for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, officer or employee of Congress, or an employee of a Member of Congress in connection with obtaining any Federal contract, grant, or any other award covered by 31 U.S.C. § 1352. Each tier shall also disclose any lobbying with non-Federal funds that takes place in connection with obtaining any Federal award. Such disclosures are forwarded from tier to tier, up to the recipient who in turn will forward the certification(s) to the awarding agency PROCUREMENT OF RECOVERED MATERIALS In the performance of this 18th day contract, the Contractor shall make maximum use of June in products containing recovered materials that are EPA-designated Items unless the year 2018. BETWEEN Agency of Administration Department of Buildings and General Services Two Governor Aiken Avenue Montpelier, Vermont 05633-5801 the State. Marble Valley Engineering, P.C. 00 Xxxxx Xxxxxx Xxxxxxx, Xxxxxxx 00000 the ARCHITECT/ENGINEER. It is the intention of the State to utilize architectural and engineering services on a as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth below: The period of performance under this contract shall commence on June 18th, 2018 and end on June 18th, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may products cannot be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying, and construction estimating, as required for the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such as labor, material, equipment, etc.acquired-

Appears in 2 contracts

Samples: Vermont Contract, bgs.vermont.gov

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment This document consists of 2 pages. Except as modified by this Amendment No. 1, all provisions of the Contract remain in full force and effect. The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. STATE OF VERMONT MARBLE VALLEY ENGINEERINGXXXXX, XXXXXXX & SIENKIEWYCZ ARCHITECTS, P.C. By: Name: Xxxxxxxxxxx Xxxx Title: BGS Commissioner Date: By: Name: Name: Title: Title: Date: Date: MASTER COPY DISTRIBUTED (Contractor, Accounting, Regional Director, Project Manager, DFM) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES (Revised 03/2018) THE XXXXX XX XXXXXXX XXXXXXXX XX. 00000 STATE OF VERMONT STANDARD FORM OF AGREEMENT BETWEEN STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made this 18th day of June in the year 2018. BETWEEN Agency of Administration Department of Buildings and General Services Two Governor Aiken Avenue Montpelier, Vermont 05633-5801 the State. Marble Valley EngineeringXxxxx, Xxxxxxx & Xxxxxxxxxxx Architects, P.C. 00 Xxxxx Xxxxxx Xxxxxxx000 Xx. Xxxx Xxxxxx, Xxxxxxx 00000 3rd Floor Burlington, Vermont 05401 the ARCHITECT/ENGINEER. It is the intention of the State to utilize architectural and engineering services on a as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth below: The period of performance under this contract shall commence on June 18th, 2018 and end on June 18th, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying, and construction estimating, as required for the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such as labor, material, equipment, etc.not

Appears in 2 contracts

Samples: Vermont Contract, Vermont Contract

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment This document consists of 2 pages. Except as modified by this Amendment No. 12, all provisions of the Contract remain in full force and effect. The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. STATE OF VERMONT MARBLE VALLEY ENGINEERINGLIMOGE & SONS GARAGE DOORS, P.C. INC. By: Name: Xxxxxxxxxxx Xxxx Title: BGS Commissioner Date: By: Name: Name: Title: Title: Date: Date: MASTER COPY DISTRIBUTED (DISTRIBUTED: Contractor, Accounting, Regional Director, Project ManagerPM, DFM) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES (Revised 03/2018) THE XXXXX XX XXXXXXX XXXXXXXX XXPC, ETC. 00000 STANDARD FORM OF AGREEMENT BETWEEN PROJECT NAME: DEPT ID: FUND SOURCE: PROJECT #: BUILDING #: Contract #37045 Amendment #1 STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made this 18th day CONTRACT AMENDMENT It is hereby agreed by and between the State of June in the year 2018. BETWEEN Agency of Administration Vermont, Department of Buildings and & General Services Two Governor Aiken Avenue Montpelier(the "State") and Limoge & Sons Garage Door with a principal place of business in Williston, Vermont 05633-5801 VT (the State. Marble Valley Engineering"Contractor") that the contract between them originally dated as of September 15, P.C. 00 Xxxxx Xxxxxx Xxxxxxx2018, Xxxxxxx 00000 the ARCHITECT/ENGINEER. It is the intention of the State to utilize architectural and engineering services on a as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth below: The period of performance under this contract shall commence on June 18th, 2018 and end on June 18th, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying, and construction estimatingContract # 37045, as required for amended to date, (the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such “Contract”) is hereby amended as labor, material, equipment, etc.follows:

Appears in 2 contracts

Samples: Vermont Contract, Vermont Contract

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment SOV Cybersecurity Standard 19-01. All products and service provided to or for the use of the State under this Contract shall be in compliance with State of Vermont Cybersecurity Standard 19-01, which Contractor acknowledges has been provided to it, and is available on-line at the following URL:xxxxx://xxxxxxxxxxxxxxx.xxxxxxx.xxx/cybersecurity/cybersecurity-standards-and- directives This document consists of 2 pages. Except as modified by this Amendment No. 12, all provisions of the Contract remain in full force and effect. The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. STATE OF VERMONT MARBLE VALLEY ENGINEERING, P.C. VERSATILE COMMUNICATIONS INC By: Name: Xxxxxxxxxxx Xxxx Title: BGS Commissioner Date: By: Name: Name: Title: Title: Date: MASTER COPY DISTRIBUTED (Contractor, Accounting, Regional Director, Project Manager, DFM) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES (Revised 03/2018) THE XXXXX XX XXXXXXX XXXXXXXX XX. 00000 STANDARD FORM OF AGREEMENT BETWEEN Date: STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made this 18th day CONTRACT AMENDMENT It is hereby agreed by and between the State of June in the year 2018. BETWEEN Agency of Administration Vermont, Department of Buildings and General Services Two Governor Aiken Avenue MontpelierServices, Vermont 05633-5801 Office of Purchasing & Contracting the "State. Marble Valley Engineering") and Versatile Communications Inc, P.C. 00 Xxxxx Xxxxxx Xxxxxxxwith a principal place of business in Marlboro, Xxxxxxx 00000 MA (the ARCHITECT/ENGINEER. It is "Contractor") that the intention contract between them originally dated as of the State to utilize architectural and engineering services on a as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth below: The period of performance under this contract shall commence on June 18thMarch 1, 2018 and end on June 18th2016, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying, and construction estimatingContract # 30732, as required for amended to date, (the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such “Contract”) is hereby amended as labor, material, equipment, etc.follows:

Appears in 1 contract

Samples: Vermont Contract

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment This document consists of 2 3 pages. Except as modified by this Amendment No. 1, all provisions of the Contract remain in full force and effect. The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. STATE OF VERMONT MARBLE VALLEY ENGINEERINGLYME GREEN HEAT, P.C. INC. By: Name: Xxxxxxxxxxx Xxxx Title: BGS Commissioner Date: By: Name: Name: Title: Title: Date: MASTER COPY DISTRIBUTED (Contractor, Accounting, Regional Director, Project Manager, DFM) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES (Revised 03/2018) THE XXXXX XX XXXXXXX XXXXXXXX XX. 00000 STANDARD FORM OF AGREEMENT BETWEEN Date: STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made this 18th day of June in the year 2018. BETWEEN Agency of Administration Department of Buildings and General Services Two Governor Aiken Avenue Montpelier, Vermont 05633-5801 the State. Marble Valley Engineering, P.C. 00 Xxxxx Xxxxxx Xxxxxxx, Xxxxxxx 00000 the ARCHITECT/ENGINEER. NOVATION AND AMENDMENT It is hereby agreed by and among the intention State of Vermont, Department of Buildings and General Services (hereinafter called "State"), Xxxxxx Energy LLC, a corporation with a principal place of business in Greenfield, MA (hereinafter called “Xxxxxx Energy”) and Lyme Green Heat Inc, a corporation with a principal place of business in Lyme, NH (hereinafter called "Contractor”), that the Contractor intends to assume all of the State to utilize architectural rights, benefits, duties and engineering services on a as needed basis. The obligations of Xxxxxx Energy LLC under the Contract between the State and Xxxxxx Energy LLC dated as of September 1, 2020, Contract # 40568, as amended to date (the ARCHITECT/ENGINEER agree as set forth below: The period of performance under this contract shall commence on June 18th, 2018 and end on June 18th, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying“Contract”), and construction estimating, that the Contract is hereby amended as required for the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such as labor, material, equipment, etc.follows:

Appears in 1 contract

Samples: Vermont Contract

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment This document consists of 2 pages. Except as modified by this Amendment No. 1, all provisions of the Contract remain in full force and effect. The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. STATE OF VERMONT MARBLE VALLEY ENGINEERINGNIMTZ, BERRYHILL, XXXXXX ARCHITECTS, P.C. By: Name: Xxxxxxxxxxx Xxxx Title: BGS Commissioner Date: By: Name: Name: Title: Title: Date: Date: MASTER COPY DISTRIBUTED (Contractor, Accounting, Regional Director, Project Manager, DFM) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES (Revised 03/2018) THE XXXXX XX XXXXXXX XXXXXXXX XX. 00000 STATE OF VERMONT STANDARD FORM OF AGREEMENT BETWEEN STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made this 18th day of June in the year 2018. BETWEEN Agency of Administration Department of Buildings and General Services Two Governor Aiken Avenue Montpelier, Vermont 05633-5801 the State. Marble Valley EngineeringXxxxx/Xxxxxxxxx/Xxxxxx Architects, P.C. 00 Xxxxx Xxxxxx Xxxxxxx24 ½ Center Street Rutland, Xxxxxxx 00000 Vermont 05701 the ARCHITECT/ENGINEER. It is the intention of the State to utilize architectural and engineering services on a as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth below: The period of performance under this contract shall commence on June 18th, 2018 and end on June 18th, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying, and construction estimating, as required for the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such as labor, material, equipment, etc.

Appears in 1 contract

Samples: Vermont Contract

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment State and Federal Terms for Products and Services related the 2020 Covid-19 Pandemic. Contractor agrees that “STATE OF VERMONT- FEDERAL TERMS SUPPLEMENT (Non- Construction) for all Contracts and Purchases of Products and Services Connected with 2020 Pandemic,” which is attached as Attachment to this amendment, applies to any products or services provided to the State, at any time, in connection with the 2020 Pandemic. This document consists of 2 1 pages. Except as modified by this Amendment No. 12, all provisions of the Contract remain in full force and effect. Revision Date: 05/30/2019 The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. STATE OF VERMONT MARBLE VALLEY ENGINEERING, P.C. By: The Hertz Corporation By: Name: Xxxxxxxxxxx Xxxx Title: BGS Commissioner Date: By: Name: Title: Title: Date: MASTER COPY DISTRIBUTED (Contractor, Accounting, Regional Director, Project Manager, DFM) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES (Revised 03/2018) THE XXXXX XX XXXXXXX XXXXXXXX XX. 00000 STANDARD FORM OF AGREEMENT BETWEEN Date: Revision Date: 05/30/2019 ATTACHMENT D STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made VERMONT- FEDERAL TERMS SUPPLEMENT (Non-Construction) for all Contracts and Purchases1 of Products and Services Connected with 2020 Pandemic XXXX ANTI-LOBBYING AMENDMENT Contractors who apply or bid for an award of $100,000 or more certify that each tier certifies to the tier above that it will not and has not used Federal appropriated funds to pay any person or organization for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, officer or employee of Congress, or an employee of a Member of Congress in connection with obtaining any Federal contract, grant, or any other award covered by 31 U.S.C. § 1352. Each tier shall also disclose any lobbying with non-Federal funds that takes place in connection with obtaining any Federal award. Such disclosures are forwarded from tier to tier, up to the recipient who in turn will forward the certification(s) to the awarding agency PROCUREMENT OF RECOVERED MATERIALS In the performance of this 18th day contract, the Contractor shall make maximum use of June in products containing recovered materials that are EPA-designated Items unless the year 2018. BETWEEN Agency of Administration Department of Buildings and General Services Two Governor Aiken Avenue Montpelier, Vermont 05633-5801 the State. Marble Valley Engineering, P.C. 00 Xxxxx Xxxxxx Xxxxxxx, Xxxxxxx 00000 the ARCHITECT/ENGINEER. It is the intention of the State to utilize architectural and engineering services on a as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth below: The period of performance under this contract shall commence on June 18th, 2018 and end on June 18th, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may products cannot be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying, and construction estimating, as required for the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such as labor, material, equipment, etc.acquired-

Appears in 1 contract

Samples: Rental Agreement Terms and Conditions

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment Contract # 34360 Amendment # 5 This document consists of 2 pages. Except as modified by this Amendment No. 1, 1 all provisions of the Contract remain in full force and effect. The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. STATE OF VERMONT MARBLE VALLEY ENGINEERING22nd Century Technologies, P.C. Inc. By: Name: Xxxxxxxxxxx Xxxx Title: BGS Commissioner Date: By: Name: Name: Title: Title: Date: MASTER COPY DISTRIBUTED Date: Attachment F TEMPORARY WORK REQUEST (ContractorAdd sheets if needed, Accountinga detailed Statement of Work is required for technology procurements) Requestor: Phone #: Email: Department: Agency: # Staff Requested: TYPE OF SERVICE NEEDED (indicate with an "X" in the corrersponding box) a. Administrative Support (including Office and Clerical), Regional Directorwhich includes occupations in which workers are responsible for day to day operations such as internal and external communication, Project Managerrecording and retrieval of data and/or information and other paperwork required in an office. May include but is not limited to: bookkeepers, DFMmessengers, clerk‐typists, stenographers, court transcribers, hearing reporters, statistical clerks, dispatchers, license distributors, payroll clerks, office machine and computer operators, legalassistants, cashiers, and toll collectors. b. Commercial/Industrial Workers, which includes occupations in which workers perform jobs which require special manual skill and a thorough and comprehensive knowledge of the processes involved in the work which is acquired through on‐the‐job training and experience or through apprenticeship or other formal training programs. May include but is not limited to: mechanics and repairers, electricians, heavy equipment operators, stationary engineers, skilled machining occupations, carpenters, power plant operators, water and sewage treatment plant operators, service/maintenance. Workers in the following group may operate machinery: Chauffeurs, laundry and dry cleaning operatives, truck drivers, bus drivers, garage Laborers, custodial, gardeners and groundskeepers, refuse collectors, Construction laborers, park rangers (maintenance), farm workers (except managers), craft apprentices/ trainees/ c. Healthcare Staffing/Services, which includes Medical and Healthcare related service jobs including, but is not limited to, all classes of positions, the duties of which are to advise, administer, supervise, research or other professional and scientific work, technical work, or related clerical work in several branches of medicine, surgery, and dentistry or in related patient care services such as dietetics, nursing, occupational therapy, physical therapy, pharmacy, dietitians, doctors, psychologists, and registered nurses d. Information Technology Professional Services, which includes facilities management, database planning/design, systems analysis/ design, network services, programming, conversion & implementation support, network services, project management, data/records management. e. Professional, which includes occupations which require specialized and theoretical knowledge, usually acquired through college training or through work experience and be licensed or certified which provides comparable knowledge to college degree. May Include but is not limited to: personnel and labor relations workers, social workers, economists, lawyers, systems analysts, accountants, engineers, employment and vocational rehabilitation counselors, teachers, trainers or instructors, librarians, management analysts, surveyors and mapping scientists. Position Title: Hours Per Week: Work Shift Time Begin / End: Expected Start Date: Expected End Date: Physical Location of Work (include Room #): Min. Education LevelNeeded : Experience/Certification/Licensure/Required: Min. Yrs. of RelevantExperience: Duties: (Provide a general overview/summary of the essential functions/ responsibilities the position will perform) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES Critical Qualifications/ Skills: (Revised 03/2018Please consider and provide a description of the daily activities and indicate the critical qualifications for a successfulcandidate (i.e. customer service skills, multi‐‐tasking abilities, proficient with Excel etc.) THE YES / NO OTHER PERTINANT INFORMATION Computer hardware to be used: This position will have access to sensitive/confidential information or info. systems. This position will directly work with children, vulnerable adults or in healthcare setting. This position will handle cash, checks, process payments or be involved in procurement. Computer software to be used: This position will require a current background check and/or drug testing. This position will require professional attire to be worn at the workplace. Primary Approver (Print): Sign: Date: Additional Approver (Print): Sign: Date: Additional Approver (Print): Sign: Date: AGO Certification required per 3 VSA Sec 342 for Work Requests ≥ $25,000: Sign: Date: Primary Contact Person (with knowledge of the position) : Phone #: Email: Agency: Dpartment: Dept. ID: Business Unit: Notes: Xxxxxxxx # 00000 XXXXX XX XXXXXXX XXXXXXXX XX. 00000 STANDARD FORM OF AGREEMENT BETWEEN STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made this 18th day CONTRACT AMENDMENT It is hereby agreed by and between the State of June in the year 2018. BETWEEN Agency of Administration Vermont, Department of Buildings and General Services Two Governor Aiken Avenue MontpelierServices, Vermont 05633-5801 Office of Procurement and Contracting (the "State. Marble Valley Engineering") and 22nd Century Technologies, P.C. 00 Xxxxx Xxxxxx XxxxxxxInc., Xxxxxxx 00000 with a principal place of business in Centennial, CO (the ARCHITECT/ENGINEER. It is "Contractor") that the intention contract between them originally dated as of the State to utilize architectural and engineering services on a as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth below: The period of performance under this contract shall commence on June 18thSeptember 1, 2018 and end on June 18th2017, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying, and construction estimatingContract # 34360, as required for amended to date, (the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such “Contract”) is hereby amended as labor, material, equipment, etc.follows:

Appears in 1 contract

Samples: Vermont Contract

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment This document consists of 2 pages. Except as modified by this Amendment No. 1, all provisions of the Contract remain in full force and effect. The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. STATE OF VERMONT MARBLE VALLEY ENGINEERINGXXXXXX & XXXXXXX ARCHITECTS, P.C. INC. By: Name: Xxxxxxxxxxx Xxxx Title: BGS Commissioner Date: By: Name: Name: Title: Title: Date: Date: MASTER COPY DISTRIBUTED (Contractor, Accounting, Regional Director, Project Manager, DFM) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES (Revised 03/2018) THE XXXXX XX XXXXXXX XXXXXXXX XX. 00000 STATE OF VERMONT STANDARD FORM OF AGREEMENT BETWEEN STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made this 18th day of June in the year 2018. BETWEEN Agency of Administration Department of Buildings and General Services Two Governor Aiken Avenue Montpelier, Vermont 05633-5801 the State. Marble Valley EngineeringXxxxxx & Xxxxxxx Architects, P.C. 00 Xxxxx Xxxxxx XxxxxxxInc. 0 Xxxxxxx Xxxxxx, Xxx 000 Xx. Xxxxxx, Xxxxxxx 00000 the ARCHITECT/ENGINEER. It is the intention of the State to utilize architectural and engineering services on a as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth below: The period of performance under this contract shall commence on June 18th, 18th ,2018 and end on June 18th, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying, and construction estimating, as required for the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such as labor, material, equipment, etc.not

Appears in 1 contract

Samples: Vermont Contract

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment This document consists of 2 pages. Except as modified by this Amendment No. 1, all provisions of the Contract remain in full force and effect. The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. STATE OF VERMONT MARBLE VALLEY ENGINEERINGHILL & XXXXX, P.C. INC. By: NameBy: Xxxxxxxxxxx Xxxx Title: BGS Commissioner Revision Date: By12/12/2018 Name: Name: Title: Title: Date: MASTER COPY DISTRIBUTED (Contractor, Accounting, Regional Director, Project Manager, DFM) Date: Revision Date: 12/12/2018 STATE OF VERMONT DEPARTMENT OF BUILDINGS AND & GENERAL SERVICES (Revised 03/2018) THE XXXXX XX XXXXXXX XXXXXXXX XX. 00000 STANDARD FORM OFFICE OF AGREEMENT BETWEEN STATE OF VERMONT OR ANY AGENCY THEREOF PURCHASING & CONTRACTING NOVATION AND ARCHITECT/ENGINEER AGREEMENT made this 18th day AMENDMENT It is hereby agreed by and among the State of June in the year 2018. BETWEEN Agency of Administration Vermont, Department of Buildings and & General Services Two Governor Aiken Avenue Montpelier(hereinafter called "State"), Vermont 05633-5801 Work Area Protection Corporation Vendor ID # 10334, a Corporation with a principal place of business in Pittsburgh, PA (hereinafter called “Contractor”) and Hill and Xxxxx Inc. DBA Work Area Protection, Vendor ID# 373832, a Corporation with a principal place of business in Columbus, OH (hereinafter called "Contractor”), that the State. Marble Valley Engineering, P.C. 00 Xxxxx Xxxxxx Xxxxxxx, Xxxxxxx 00000 the ARCHITECT/ENGINEER. It is the intention Contractor intends to assume all of the State to utilize architectural rights, benefits, duties and engineering services on a as needed basis. The obligations of Work Area Protection Corporation Vendor ID # 10334, under the Contract between the State and Work Area Protection Corporation Vendor ID # 10334, dated as of March 29, 2017, Contract # 33357, as amended to date (the ARCHITECT/ENGINEER agree as set forth below: The period of performance under this contract shall commence on June 18th, 2018 and end on June 18th, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying“Contract”), and construction estimating, that the Contract is hereby amended as required for the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such as labor, material, equipment, etc.follows:

Appears in 1 contract

Samples: Vermont Contract

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment SOV Cybersecurity Standard 19-01. All products and service provided to or for the use of the State under this Contract shall be in compliance with State of Vermont Cybersecurity Standard 19-01, which Contractor acknowledges has been provided to it, and is available on-line at the following URL:xxxxx://xxxxxxxxxxxxxxx.xxxxxxx.xxx/cybersecurity/cybersecurity-standards-and- directives This document consists of 2 pages. Except as modified by this Amendment No. 12, all provisions of the Contract remain in full force and effect. The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. STATE OF VERMONT MARBLE VALLEY ENGINEERING, P.C. XXXXXX'X COMPUTER STORE INC By: Name: Xxxxxxxxxxx Xxxx Title: BGS Commissioner Date: By: Name: Name: Title: Title: Date: MASTER COPY DISTRIBUTED (Contractor, Accounting, Regional Director, Project Manager, DFM) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES (Revised 03/2018) THE XXXXX XX XXXXXXX XXXXXXXX XX. 00000 STANDARD FORM OF AGREEMENT BETWEEN Date: STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made this 18th day CONTRACT AMENDMENT It is hereby agreed by and between the State of June in the year 2018. BETWEEN Agency of Administration Vermont, Department of Buildings and General Services Two Governor Aiken Avenue MontpelierServices, Vermont 05633-5801 Office of Purchasing & Contracting the "State. Marble Valley Engineering") and Xxxxxx'x Computer Store Inc, P.C. 00 Xxxxx Xxxxxx Xxxxxxxwith a principal place of business in Berlin, Xxxxxxx 00000 VT (the ARCHITECT/ENGINEER. It is "Contractor") that the intention contract between them originally dated as of the State to utilize architectural and engineering services on a as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth below: The period of performance under this contract shall commence on June 18thMarch 1, 2018 and end on June 18th2016, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying, and construction estimatingContract # 30736, as required for amended to date, (the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such “Contract”) is hereby amended as labor, material, equipment, etc.follows:

Appears in 1 contract

Samples: Vermont Contract

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment SOV Cybersecurity Standard 19-01. All products and service provided to or for the use of the State under this Contract shall be in compliance with State of Vermont Cybersecurity Standard 19-01, which Contractor acknowledges has been provided to it, and is available on-line at the following URL:xxxxx://xxxxxxxxxxxxxxx.xxxxxxx.xxx/cybersecurity/cybersecurity-standards-and- directives This document consists of 2 pages. Except as modified by this Amendment No. 12, all provisions of the Contract remain in full force and effect. The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. STATE OF VERMONT MARBLE VALLEY ENGINEERING, P.C. CELLCO PARTNERSHIP By: Name: Xxxxxxxxxxx Xxxx Title: BGS Commissioner Date: By: Name: Name: Title: Title: Date: Date: Line # Item ID Item Desc UOM Unit Price Max Qty Max Amt 1 VERIZON WIRELESS CELULLAR SERVICES AND EA EQUIPMENT, IN ACCORDANCE WITH THE WSCA MASTER COPY DISTRIBUTED AGREEMENT # 1907 FOR WIRELESS COMMUNICATION SERVICES AND EQUIPMENT 0.01000 0.00 0.00 CONTRACT TERMS AND ADDITIONAL INFORMATION THIS STATE OF VERMONT CONTRACT #24127 (Contractor, Accounting, Regional Director, Project Manager, DFM"CONTRACT") DEPARTMENT IS WRITTEN UNDER THE AUTHORITY GIVEN TO THE COMMISSIONER OF BUILDINGS AND GENERAL SERVICES (Revised 03/2018) IN 29 VSA § 903A TO PARTICIPATE IN COOPERATIVE PURCHASING AGREEMENTS WITH OTHER STATES. THIS CONTRACT IS WRITTEN TO ALLOW THE XXXXX XX XXXXXXX XXXXXXXX XX. 00000 STANDARD FORM OF AGREEMENT BETWEEN STATE OF VERMONT ("STATE" OR ANY AGENCY THEREOF "CUSTOMER") TO PARTICIPATE IN THE WESTERN STATES CONTRACTING ALLIANCE (WSCA) MASTER PRICE AGREEMENT #1907 WITH CELLCO PARTNERSHIP dba VERIZON WIRELESS. ("VERIZON" OR "CONTRACTOR") ON BEHALF OF ITS AFFILIATED ENTITIES PROVIDING THE PRODUCTS AND ARCHITECTSERVICES FOR THE PURCHASE OF CELLULAR PHONES AND CELLULAR SERVICE. THIS CONTRACT IS WRITTEN BASED ON THE REQUEST FOR PROPOSAL ISSUED BY THE STATE OF NEVADA ON BEHALF OF WSCA AND THE RESULTING WSCA MASTER PRICE AGREEMENT #1907 EFFECTIVE MARCH 14, 2012 ("WSCA AGREEMENT #1907"). THIS CONTRACT INCORPORATES THE SERVICES/ENGINEER PRODUCTS AND PRICING OF THE WSCA AGREEMENT made this 18th day of June in the year 2018. BETWEEN Agency of Administration Department of Buildings and General Services Two Governor Aiken Avenue Montpelier#1907 AND ALL ITS TERMS AND CONDITIONS THAT ARE NOT IN CONFLICT WITH THE STATE OF VERMONT CONTRACT #24127, Vermont 05633-5801 the State. Marble Valley Engineering, P.C. 00 Xxxxx Xxxxxx Xxxxxxx, Xxxxxxx 00000 the ARCHITECT/ENGINEER. It is the intention of the State to utilize architectural and engineering services on a as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth below: The period of performance under this contract shall commence on June 18th, 2018 and end on June 18th, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying, and construction estimating, as required for the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such as labor, material, equipment, etcAND THE STATE OF VERMONT ADDITIONAL TERMS AND CONDITIONS COOPERATIVE PROCUREMENTS AS THE RELATIONSHIP APPLIES AND ACTIVITIES APPLY TO THE STATE OF VERMONT.

Appears in 1 contract

Samples: Vermont Contract

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment State and Federal Terms for Products and Services related the 2020 Covid-19 Pandemic. Contractor agrees that “STATE OF VERMONT- FEDERAL TERMS SUPPLEMENT (Non- Construction) for all Contracts and Purchases of Products and Services Connected with 2020 Pandemic,” which is attached as Attachment D to this amendment, applies to any products or services provided to the State, at any time, in connection with the 2020 Pandemic. This document consists of 2 4 pages. Except as modified by this Amendment No. 13, all provisions of the Contract remain in full force and effect. Contract 34950 Change Order #3 The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. STATE OF VERMONT MARBLE VALLEY ENGINEERING, P.C. JANITECH By: Name: Xxxxxxxxxxx Xxxx Title: BGS Commissioner Date: By: Name: Name: Title: Title: Date: MASTER COPY DISTRIBUTED (Contractor, Accounting, Regional Director, Project Manager, DFM) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES (Revised 03/2018) THE XXXXX XX XXXXXXX XXXXXXXX XX. 00000 STANDARD FORM OF AGREEMENT BETWEEN Date: Contract 34950 Change Order #3 STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made VERMONT- FEDERAL TERMS SUPPLEMENT (Non-Construction) for all Contracts and Purchases1‌ of Products and Services Connected with 2020 Pandemic XXXX ANTI-LOBBYING AMENDMENT Attachment D Contractors who apply or bid for an award of $100,000 or more certify that each tier certifies to the tier above that it will not and has not used Federal appropriated funds to pay any person or organization for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, officer or employee of Congress, or an employee of a Member of Congress in connection with obtaining any Federal contract, grant, or any other award covered by 31 U.S.C. § 1352. Each tier shall also disclose any lobbying with non-Federal funds that takes place in connection with obtaining any Federal award. Such disclosures are forwarded from tier to tier, up to the recipient who in turn will forward the certification(s) to the awarding agency PROCUREMENT OF RECOVERED MATERIALS In the performance of this 18th day contract, the Contractor shall make maximum use of June in products containing recovered materials that are EPA-designated Items unless the year 2018. BETWEEN Agency of Administration Department of Buildings and General Services Two Governor Aiken Avenue Montpelier, Vermont 05633-5801 the State. Marble Valley Engineering, P.C. 00 Xxxxx Xxxxxx Xxxxxxx, Xxxxxxx 00000 the ARCHITECT/ENGINEER. It is the intention of the State to utilize architectural and engineering services on a as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth below: The period of performance under this contract shall commence on June 18th, 2018 and end on June 18th, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may products cannot be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying, and construction estimating, as required for the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such as labor, material, equipment, etc.acquired-

Appears in 1 contract

Samples: bgs.vermont.gov

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment SOV Cybersecurity Standard 19-01. All products and service provided to or for the use of the State under this Contract shall be in compliance with State of Vermont Cybersecurity Standard 19-01, which Contractor acknowledges has been provided to it, and is available on-line at the following URL:xxxxx://xxxxxxxxxxxxxxx.xxxxxxx.xxx/cybersecurity/cybersecurity-standards-and- directives This document consists of 2 pages. Except as modified by this Amendment No. 1No 2, all provisions of the Contract remain in full force and effect. Contract #35263 The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. STATE OF VERMONT MARBLE VALLEY ENGINEERING, P.C. The University of Vermont Xxxxxxxxxx School of Environment and Natural Resources By: Name: Xxxxxxxxxxx Xxxx Title: BGS _Jennifer Fitch Acting Commissioner Date: - Buildings and By: Name: Title: General Services Title: Date: MASTER COPY DISTRIBUTED (Contractor, Accounting, Regional Director, Project Manager, DFM) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES (Revised 03/2018) THE XXXXX XX XXXXXXX XXXXXXXX XX. 00000 STANDARD FORM OF AGREEMENT BETWEEN Date: Contract #35263 Amendment #1 STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made this 18th day CONTRACT AMENDMENT It is hereby agreed by and between the State of June in the year 2018. BETWEEN Agency of Administration Vermont, Department of Buildings and General Services Two Governor Aiken Avenue MontpelierServices, Vermont 05633-5801 Office of Purchasing and Contracting (the "State. Marble Valley Engineering") and The University of Vermont, P.C. 00 Xxxxx Xxxxxx XxxxxxxXxxxxxxxxx School of Environment and Natural Resources with a principal place of business in Burlington, Xxxxxxx 00000 VT (the ARCHITECT/ENGINEER. It is "Contractor") that the intention contract between them originally dated as of the State to utilize architectural and engineering services on a as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth below: The period of performance under this contract shall commence on June 18thDecember 1, 2018 and end on June 18th2017, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying, and construction estimatingContract # 35383, as required for amended to date, (the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such “Contract”) is hereby amended as labor, material, equipment, etc.follows:

Appears in 1 contract

Samples: Vermont Contract

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment This document consists of 2 pages. Except as modified by this Amendment No. 12, all provisions of the Contract remain in full force and effect. The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. STATE OF VERMONT MARBLE VALLEY ENGINEERINGState of Vermont Xxxxxxx X Xxxxxx, P.C. Xx. dba N-Tech By: Name: Xxxxxxxxxxx Xxxx Title: BGS Commissioner Date: _Xxxxxxxx Xxxxx By: Name: Title: Acting Commissioner - Buildings and Title: General Services Date: MASTER COPY DISTRIBUTED (Contractor, Accounting, Regional Director, Project Manager, DFM) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES (Revised 03/2018) THE XXXXX XX XXXXXXX XXXXXXXX XX. 00000 STANDARD FORM OF AGREEMENT BETWEEN Date: Contract #37349 Amendment #1 STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made this 18th day CONTRACT AMENDMENT It is hereby agreed by and between the State of June in the year 2018. BETWEEN Agency of Administration Vermont, Department of Buildings and & General Services Two Governor Aiken Avenue Montpelier(the "State") and Xxxxxxx X Xxxxxx, Vermont 05633Xx. dba N-5801 Tech with a principal place of business in Essex Junction, VT (the State. Marble Valley Engineering"Contractor") that the contract between them originally dated as of November 1, P.C. 00 Xxxxx Xxxxxx Xxxxxxx2018, Xxxxxxx 00000 the ARCHITECT/ENGINEER. It is the intention of the State to utilize architectural and engineering services on a as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth below: The period of performance under this contract shall commence on June 18th, 2018 and end on June 18th, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying, and construction estimatingContract #37349, as required for amended to date, (the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such “Contract”) is hereby amended as labor, material, equipment, etc.follows:

Appears in 1 contract

Samples: Vermont Contract

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date that this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment. Cybersecurity Standard Update 2023-01. Contractor confirms that all products and services provided to or for the use of the State under this Agreement shall be in compliance with State of Vermont Cybersecurity Standard Update 2023-01, which prohibits the use of certain branded products in State information systems or any vendor system that is supporting State information systems, and is available on-line at: xxxxx://xxxxxxxxxxxxxxx.xxxxxxx.xxx/cybersecurity/cybersecurity-standards-and- directives. State and Federal Terms for Products and Services. Contractor agrees that “STATE OF VERMONT- FEDERAL TERMS SUPPLEMENT (Non-Construction) for all Contracts and Purchases of Products and Services Using Federal Funds (Revision date: July 28, 2022)” which is attached as Attachment G to this amendment, applies to any products or services provided to the State, at any time, when using federal funds. This document consists of 2 6 pages. Except as modified by this Amendment No. 1, 1 all provisions of the Contract remain in full force and effect. The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. WE THE UNDERSIGNED PARTIES AGREE TO BE BOUND BY THIS CONTRACT STATE OF VERMONT MARBLE VALLEY ENGINEERINGDepartment of Vermont Health Access CONTRACTOR Speridian Technologies, P.C. ByLLC Xxxxxx De Xx Xxxxxx, Commissioner Date 000 Xxxxx Xxxxx NOB 1 SOUTH WATERBURY, VT 05671 PHONE: Name000-000-0000 Email: Xxxxxxxxxxx Xxxxxx.XxXxXxxxxx@xxxxxxx.xxx Xxx Xxxxx 0000 Xxxxxxxxx Xxxx TitleXX, Xxxx 0 Albuquerque, NM 00000-0000 Phone: BGS Commissioner Date000-000-0000 Email: By: Name: Title: Date: MASTER COPY DISTRIBUTED (Contractor, Accounting, Regional Director, Project Manager, DFM) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES (Revised 03/2018) THE XXXXX XX XXXXXXX XXXXXXXX XX. 00000 STANDARD FORM OF AGREEMENT BETWEEN xxx.xxxxx@xxxxxxxxx.xxx ATTACHMENT G STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made VERMONT- FEDERAL TERMS SUPPLEMENT (Non-Construction) for all Contracts and Purchases of Products and Services Using Federal Funds (Revision date: July 28, 2022) PROCUREMENT OF RECOVERED MATERIALS In the performance of this 18th day contract, the Contractor shall make maximum use of June in products containing recovered materials that are EPA-designated Items unless the year 2018. BETWEEN Agency of Administration Department of Buildings and General Services Two Governor Aiken Avenue Montpelier, Vermont 05633-5801 the State. Marble Valley Engineering, P.C. 00 Xxxxx Xxxxxx Xxxxxxx, Xxxxxxx 00000 the ARCHITECT/ENGINEER. It is the intention of the State to utilize architectural and engineering services on a as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth below: The period of performance under this contract shall commence on June 18th, 2018 and end on June 18th, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may products cannot be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying, and construction estimating, as required for the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such as labor, material, equipment, etc.acquired-

Appears in 1 contract

Samples: dvha.vermont.gov

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment This document consists of 2 pages. Except as modified by this Amendment No. 1, all provisions of the Contract remain in full force and effect. Revision Date: 12/12/2018 The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. STATE OF VERMONT MARBLE VALLEY ENGINEERINGXX XXXXXX ASSOCIATES, P.C. PLLC. By: Name: Xxxxxxxxxxx Xxxx Title: BGS Commissioner Date: By: Name: Name: Title: Title: Date: Date: Revision Date: 12/12/2018 MASTER COPY DISTRIBUTED 07.24.18 SW (Contractor, Accounting, Regional Director, Project Manager, DFM) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES (Revised 03/2018) THE XXXXX XX XXXXXXX XXXXXXXX XX. 00000 STATE OF VERMONT STANDARD FORM OF AGREEMENT BETWEEN STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made this 18th day of June in the year 2018. BETWEEN Agency of Administration Department of Buildings and General Services Two Governor Aiken Avenue Montpelier, Vermont 05633-5801 the State. Marble Valley EngineeringXX Xxxxxx Associates, P.C. 00 Xxxxx Xxxxxx XxxxxxxPLLC. 000 Xxxxxxx Xxxxxx, Xxxxxxx 00000 the ARCHITECT/ENGINEER. It is the intention of the State to utilize architectural and engineering services on a as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth below: The period of performance under this contract shall commence on June 18th, 2018 and end on June 18th, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying, and construction estimating, as required for the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such as labor, material, equipment, etc.Xxx 000 XX Xxx 0000

Appears in 1 contract

Samples: Vermont Contract

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment State and Federal Terms for Products and Services related the 2020 Covid-19 Pandemic. Contractor agrees that “STATE OF VERMONT- FEDERAL TERMS SUPPLEMENT (Non- Construction) for all Contracts and Purchases of Products and Services Connected with 2020 Pandemic,” which is attached as Attachment to this amendment, applies to any products or services provided to the State, at any time, in connection with the 2020 Pandemic. This document consists of 2 1 pages. Except as modified by this Amendment No. 12, all provisions of the Contract remain in full force and effect. Revision Date: 05/30/2019 Contract #39199 The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. STATE OF VERMONT MARBLE VALLEY ENGINEERING, P.C. By: The Hertz Corporation By: Name: Xxxxxxxxxxx Xxxx Title: BGS Commissioner Date: By: Name: Title: Title: Date: MASTER COPY DISTRIBUTED (Contractor, Accounting, Regional Director, Project Manager, DFM) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES (Revised 03/2018) THE XXXXX XX XXXXXXX XXXXXXXX XX. 00000 STANDARD FORM OF AGREEMENT BETWEEN Date: Revision Date: 05/30/2019 ATTACHMENT D STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made VERMONT- FEDERAL TERMS SUPPLEMENT (Non-Construction) for all Contracts and Purchases1 of Products and Services Connected with 2020 Pandemic XXXX ANTI-LOBBYING AMENDMENT Contractors who apply or bid for an award of $100,000 or more certify that each tier certifies to the tier above that it will not and has not used Federal appropriated funds to pay any person or organization for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, officer or employee of Congress, or an employee of a Member of Congress in connection with obtaining any Federal contract, grant, or any other award covered by 31 U.S.C. § 1352. Each tier shall also disclose any lobbying with non-Federal funds that takes place in connection with obtaining any Federal award. Such disclosures are forwarded from tier to tier, up to the recipient who in turn will forward the certification(s) to the awarding agency PROCUREMENT OF RECOVERED MATERIALS In the performance of this 18th day contract, the Contractor shall make maximum use of June in products containing recovered materials that are EPA-designated Items unless the year 2018. BETWEEN Agency of Administration Department of Buildings and General Services Two Governor Aiken Avenue Montpelier, Vermont 05633-5801 the State. Marble Valley Engineering, P.C. 00 Xxxxx Xxxxxx Xxxxxxx, Xxxxxxx 00000 the ARCHITECT/ENGINEER. It is the intention of the State to utilize architectural and engineering services on a as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth below: The period of performance under this contract shall commence on June 18th, 2018 and end on June 18th, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may products cannot be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying, and construction estimating, as required for the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such as labor, material, equipment, etc.acquired-

Appears in 1 contract

Samples: Vermont Contract

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment State and Federal Terms for Products and Services related the 2020 Covid-19 Pandemic. Contractor agrees that “STATE OF VERMONT- FEDERAL TERMS SUPPLEMENT (Non- Construction) for all Contracts and Purchases of Products and Services Connected with 2020 Pandemic,” which is attached as Attachment D to this amendment, applies to any products or services provided to the State, at any time, in connection with the 2020 Pandemic. This document consists of 2 pages. Except as modified by this Amendment No. 1, all provisions of the Contract remain in full force and effect. Revision Date: 05/30/2019 The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. STATE OF VERMONT MARBLE VALLEY ENGINEERING, P.C. Xxxxx Distributing Corp By: Name: Xxxxxxxxxxx Xxxx Title_Xxxxxxxx Xxxxx TitleA: BGS cting Commissioner - Buildings and General Services Date: By: Name: Title: Date: MASTER COPY DISTRIBUTED (Contractor, Accounting, Regional Director, Project Manager, DFM) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES (Revised 03/2018) THE XXXXX XX XXXXXXX XXXXXXXX XX. 00000 STANDARD FORM OF AGREEMENT BETWEEN Revision Date: 05/30/2019 Attachment D STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made VERMONT- FEDERAL TERMS SUPPLEMENT (Non-Construction) for all Contracts and Purchases1 of Products and Services Connected with 2020 Pandemic XXXX ANTI-LOBBYING AMENDMENT Contractors who apply or bid for an award of $100,000 or more certify that each tier certifies to the tier above that it will not and has not used Federal appropriated funds to pay any person or organization for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, officer or employee of Congress, or an employee of a Member of Congress in connection with obtaining any Federal contract, grant, or any other award covered by 31 U.S.C. § 1352. Each tier shall also disclose any lobbying with non-Federal funds that takes place in connection with obtaining any Federal award. Such disclosures are forwarded from tier to tier, up to the recipient who in turn will forward the certification(s) to the awarding agency PROCUREMENT OF RECOVERED MATERIALS In the performance of this 18th day contract, the Contractor shall make maximum use of June in products containing recovered materials that are EPA-designated Items unless the year 2018. BETWEEN Agency of Administration Department of Buildings and General Services Two Governor Aiken Avenue Montpelier, Vermont 05633-5801 the State. Marble Valley Engineering, P.C. 00 Xxxxx Xxxxxx Xxxxxxx, Xxxxxxx 00000 the ARCHITECT/ENGINEER. It is the intention of the State to utilize architectural and engineering services on a as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth below: The period of performance under this contract shall commence on June 18th, 2018 and end on June 18th, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may products cannot be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying, and construction estimating, as required for the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such as labor, material, equipment, etc.acquired-

Appears in 1 contract

Samples: bgs.vermont.gov

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment This document consists of 2 pages. Except as modified by this Amendment No. 1, all provisions of the Contract remain in full force and effect. The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. STATE OF VERMONT MARBLE VALLEY ENGINEERINGTROY OVERHEAD DOORS, P.C. LLC. By: Name: Xxxxxxxxxxx Xxxx Title: BGS Commissioner Date: By: Name: Name: Title: Title: Date: Date: MASTER COPY DISTRIBUTED (DISTRIBUTED: Contractor, Accounting, Regional Director, Project ManagerPM, DFM) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES (Revised 03/2018) THE XXXXX XX XXXXXXX XXXXXXXX XXPC, ETC. 00000 STANDARD FORM OF AGREEMENT BETWEEN STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made this 18th day PROJECT NAME: DEPT ID: FUND SOURCE: PROJECT #: BUILDING #: State of June in the year 2018. BETWEEN Agency of Administration Department of Vermont Buildings and General Services Two Governor Aiken Avenue Montpelier, Vermont 05633Office of Purchasing & Contracting 000 Xxxxx Xx Xxxxxxxxxx XX 00000-5801 the State. Marble Valley Engineering, P.C. 00 0000 CONTRACT USA Contract ID 0000000000000000000037825 Page 1 of 2 Supplier 0000369221 Troy Overhead Doors LLC Contract Dates 03/01/2019 to 09/19/2019 Origin CP 000 Xxxx Xxxx Xxxx Xxxxx Xxxxxx Xxxxxxx, Xxxx XX 00000 Description: Retainer - Overhead Door Svcs Contract Maximum $60,000.00 USA Buyer Name Bu Xxxx Xxxxx Xxxxxxx 00000 the ARCHITECT/ENGINEER. It is the intention of the State to utilize architectural and engineering services on a as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth belowyer Phone Contract Status Approved Phone #: The period of performance under this contract shall commence on June 18th, 2018 and end on June 18th, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying, and construction estimating, as required for the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such as labor, material, equipment, etc.Line # Item ID Item Desc UOM Unit Price Max Qty Max Amt 1 Retainer - Overhead Door Services JOB 0.01000 0.00 60,000.00 STANDARD CONTRACT FOR SERVICES

Appears in 1 contract

Samples: Vermont Contract

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment This document consists of 2 pages. Except as modified by this Amendment No. 1, all provisions of the Contract remain in full force and effect. Revision Date: 12/12/2018 Contract #37186 Amendment #1 The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. STATE OF VERMONT MARBLE VALLEY ENGINEERING, P.C. XXXXXX X. XXXXXX By: Name: Xxxxxxxxxxx Xxxx Title: BGS Commissioner Date: By: Name: Name: Title: Title: Date: MASTER COPY DISTRIBUTED (Contractor, Accounting, Regional Director, Project Manager, DFM) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES (Revised 03/2018) THE XXXXX XX XXXXXXX XXXXXXXX XX. 00000 STANDARD FORM OF AGREEMENT BETWEEN STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made this 18th day Date: Revision Date: 12/12/2018 State of June in the year 2018. BETWEEN Agency of Administration Department of Vermont Buildings and General Services Two Governor Aiken Avenue Montpelier, Vermont 05633Office of Purchasing & Contracting 000 Xxxxx Xx Xxxxxxxxxx XX 00000-5801 the State. Marble Valley Engineering, P.C. 0000 XXXXXXXX Xxxxxx Xxxxxx Supplier 0000339259 Xxxxxx,Xxxxxx S 00 Xxxxx Xxxx Xxxxxxxxx XX 00000 Xxxxxx Xxxxxxx, Xxxxxx Phone #: Line # Item ID Item Desc UOM Unit Price Max Qty Max Amt 1 Retainer - Janitorial Services JOB 0.01000 0.00 250,000.00 Contract ID 0000000000000000000037186 Page 1 of 2 Contract Dates 09/30/2018 to 11/30/2019 Origin CPS Description: Retainer - Janitorial Services Contract Maximum$250,000.00 Buyer Name Buyer Phone Xxxx Xxxxx Xxxxxxx 00000 the ARCHITECT/ENGINEER. It is the intention of the State to utilize architectural and engineering services on a as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth below: The period of performance under this contract shall commence on June 18th, 2018 and end on June 18th, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying, and construction estimating, as required for the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such as labor, material, equipment, etc.Contract Status Approved STANDARD CONTRACT FOR SERVICES

Appears in 1 contract

Samples: Vermont Contract

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date that this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment. Cybersecurity Standard Update 2022-01: Contractor confirms that all products and services provided to or for the use of the State under this Agreement shall be in compliance with State of Vermont Cybersecurity Standard Update 2022-01, which prohibits the use of certain branded products in State information systems or any vendor system that is supporting State information systems, and is available on-line at: xxxxx://xxxxxxxxxxxxxxx.xxxxxxx.xxx/cybersecurity/cybersecurity-standards-and- directives. State and Federal Terms for Products and Services. Contractor agrees that “STATE OF VERMONT- FEDERAL TERMS SUPPLEMENT (Non-Construction) for all Contracts and Purchases of Products and Services Using Federal Funds (Revision date: July 28, 2022)” which is attached as Attachment G to this amendment, applies to any products or services provided to the State, at any time, when using federal funds. This document consists of 2 8 pages. Except as modified by this Amendment No. 1, 1 all provisions of the Contract remain in full force and effect. The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. WE THE UNDERSIGNED PARTIES AGREE TO BE BOUND BY THIS CONTRACT STATE OF VERMONT MARBLE VALLEY ENGINEERINGDepartment of Vermont Health Access CONTRACTOR Vermont Public Transportation Association, P.C. ByInc. 1/4/2023 Xxxxxx De Xx Xxxxxx, Commissioner Date 000 Xxxxx Xxxxx NOB 1 South Waterbury, VT 05671 Phone: Name000-000-0000 Email: Xxxxxxxxxxx Xxxx TitleXxxxxx.XxXxXxxxxx@xxxxxxx.xxx XXXXXX XXXXXX, EXECUTIVE DIRECTOR DATE 1/4/2023 000 Xxxxxxx Xxxxxx, Suite 11 Bennington, VT 05201 Phone: BGS Commissioner Date000-000-0000 Email: By: Name: Title: Date: MASTER COPY DISTRIBUTED (Contractor, Accounting, Regional Director, Project Manager, DFM) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES (Revised 03/2018) THE XXXXX XX XXXXXXX XXXXXXXX XX. 00000 STANDARD FORM OF AGREEMENT BETWEEN xxxxxxx@xxxxxxxx.xxx STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made VERMONT- FEDERAL TERMS SUPPLEMENT (Non-Construction) for all Contracts and Purchases of Products and Services Using Federal Funds (Revision date: July 28, 2022) PROCUREMENT OF RECOVERED MATERIALS In the performance of this 18th day contract, the Contractor shall make maximum use of June in products containing recovered materials that are EPA-designated Items unless the year 2018. BETWEEN Agency of Administration Department of Buildings and General Services Two Governor Aiken Avenue Montpelier, Vermont 05633-5801 the State. Marble Valley Engineering, P.C. 00 Xxxxx Xxxxxx Xxxxxxx, Xxxxxxx 00000 the ARCHITECT/ENGINEER. It is the intention of the State to utilize architectural and engineering services on a as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth below: The period of performance under this contract shall commence on June 18th, 2018 and end on June 18th, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may products cannot be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying, and construction estimating, as required for the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such as labor, material, equipment, etc.acquired-

Appears in 1 contract

Samples: dvha.vermont.gov

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment SOV Cybersecurity Standard 19-01. All products and service provided to or for the use of the State under this Contract shall be in compliance with State of Vermont Cybersecurity Standard 19-01, which Contractor acknowledges has been provided to it, and is available on-line at the following URL:xxxxx://xxxxxxxxxxxxxxx.xxxxxxx.xxx/cybersecurity/cybersecurity-standards-and- directives This document consists of 2 pages. Except as modified by this Amendment No. 1, all provisions of the Contract remain in full force and effect. Revision Date: 05/30/2019 The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. STATE OF VERMONT MARBLE VALLEY ENGINEERING, P.C. JVCKenwood USA Corporation By: Name: Xxxxxxxxxxx Xxxx Title: BGS Commissioner Date: By: Name: Name: Title: Title: Date: MASTER COPY DISTRIBUTED (ContractorDate: Revision Date: 05/30/2019 1. Parties. This is a contract for commodities between the State of Vermont, Accounting, Regional Director, Project Manager, DFM) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES (Revised 03/2018) THE XXXXX XX XXXXXXX XXXXXXXX XX. 00000 STANDARD FORM OF AGREEMENT BETWEEN STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made this 18th day of June in the year 2018. BETWEEN Agency of Administration Department of Buildings and General Services Two Governor Aiken Avenue MontpelierServices, Vermont 05633-5801 the Office of Purchasing and Contracting. (hereinafter called “State”), and JVCKenwood USA Corporation, with a principal place of business in Long Beach, CA, (hereinafter called “Contractor”). Marble Valley Engineering, P.C. 00 Xxxxx Xxxxxx Xxxxxxx, Xxxxxxx 00000 the ARCHITECT/ENGINEERContractor’s form of business organization is Corporation. It is Contractor’s responsibility to contact the intention Vermont Department of the State Taxes to utilize architectural and engineering services on determine if, by law, Contractor is required to have a as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth below: The period Vermont Department of performance under this contract shall commence on June 18th, 2018 and end on June 18th, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying, and construction estimating, as required for the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such as labor, material, equipment, etcTaxes Business Account Number.

Appears in 1 contract

Samples: Vermont Contract

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment This document consists of 2 pages. Except as modified by this Amendment No. 1, all provisions of the Contract remain in full force and effect. The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. STATE OF VERMONT MARBLE VALLEY ENGINEERINGXXXXX, XXXXXXX & XXXXXXXXXXX ARCHITECTS, P.C. By: Name: Xxxxxxxxxxx Xxxx Title: BGS Commissioner Date: By: Name: Name: Title: Title: Date: Date: MASTER COPY DISTRIBUTED (Contractor, Accounting, Regional Director, Project Manager, DFM) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES (Revised 03/2018) THE XXXXX XX XXXXXXX XXXXXXXX XX. 00000 STATE OF VERMONT STANDARD FORM OF AGREEMENT BETWEEN STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made this 18th day of June in the year 2018. BETWEEN Agency of Administration Department of Buildings and General Services Two Governor Aiken Avenue Montpelier, Vermont 05633-5801 the State. Marble Valley EngineeringXxxxx, Xxxxxxx & Xxxxxxxxxxx Architects, P.C. 00 Xxxxx Xxxxxx Xxxxxxx000 Xx. Xxxx Xxxxxx, Xxxxxxx 00000 3rd Floor Burlington, Vermont 05401 the ARCHITECT/ENGINEER. It is the intention of the State to utilize architectural and engineering services on a as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth below: The period of performance under this contract shall commence on June 18th, 2018 and end on June 18th, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying, and construction estimating, as required for the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such as labor, material, equipment, etc.not

Appears in 1 contract

Samples: Vermont Contract

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s 's principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date this contract amendment Unit Xxx Xxx Line # Item ID Item Desc UOM Price Qty Amt is signed, Contractor is not presently debarred, suspended, nor named on the State’s 's debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment Sole Source Contract for Services. This Contract results from a "sole source" procurement under State of Vermont Administrative Bulletin 3.5 process and Contractor hereby certifies that it is and will remain in compliance with the campaign contribution restrictions under 17 V.S.A. § 2950. SOV Cybersecurity Standard 19-01. All products and service provided to or for the use of the State under this Contract shall be in compliance with State of Vermont Cybersecurity Standard 19-01, which Contractor acknowledges has been provided to it, and is available on-line at the following URL:xxxxx://xxxxxxxxxxxxxxx.xxxxxxx.xxx/cybersecurity/cybersecurity-standards-and-directives This document consists of 2 4 pages. Except as modified by this Amendment No. 1, all provisions of the Contract remain in full force and effect. The signatures WE THE UNDERSIGNED PARTIES AGREE TO BE BOUND BY THIS CONTRACT By the STATE of VERMONT By the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. STATE OF VERMONT MARBLE VALLEY ENGINEERING, P.C. ByCONTRACTOR Date: Signature: Date: Signature: Name: Xxxxxxxxxxx Xxxx Title: BGS Commissioner Date: By: Xxxxxxxx Xxxxx Name: Title: Date: MASTER COPY DISTRIBUTED (Contractor, Accounting, Regional Director, Project Manager, DFM) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES (Revised 03/2018) THE XXXXX XX XXXXXXX XXXXXXXX XX. 00000 STANDARD FORM OF AGREEMENT BETWEEN STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made this 18th day of June in the year 2018. BETWEEN Agency of Administration Department of Commissioner - Buildings and General Services Two Governor Aiken Avenue Montpelier, Vermont 05633Title: Email: Title: Email: Line # Item ID Item Desc UOM Unit Price Max Qty Max Amt 1 B-1500 C Z-5801 the State. Marble Valley Engineering, P.C. BAR MOUNT AC POWERED EA 19,375.00000 0.00 0.00 2 B-1500 C CLAMPING MOUNT AC POWERED EA 0.00000 0.00 0.00 3 B-1500 C Z BAR MOUNT SOLAR POWERED EA 19,375.00000 0.00 0.00 4 B -1500 C CLAMPING MOUNT SOLAR POWERED EA 19,995.00000 0.00 0.00 5 B-320 Z BAR MOUNT AC POWERED EA 14,375.00000 0.00 0.00 0 X-000 XXXXXXXX XXXXX XX POWERED EA 14,995.00000 0.00 0.00 7 B-320 Z BAR MOUNT SOLAR POWERED EA 14,375.00000 0.00 0.00 8 B-320 CLAMPING MOUNT SOLAR POWERED EA 14,995.00000 0.00 0.00 9 B-548 Z BAR MOUNT AV POWERED EA 12,875.00000 0.00 0.00 00 Xxxxx Xxxxxx Xxxxxxx, Xxxxxxx 00000 the ARCHITECT/ENGINEER. It is the intention of the State to utilize architectural and engineering services on a as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth below: The period of performance under this contract shall commence on June 18th, 2018 and end on June 18th, 2020 with an option to renew for two additional oneX-000 XXXXXXXX XXXXX XX POWERED EA 13,500.00000 0.00 0.00 11 B-548 Z BAR MOUNT SOLAR POWERED EA 12,875.00000 0.00 0.00 12 B-548 CLAMPING MOUNT SOLAR POWERED EA 13,500.00000 0.00 0.00 Line # Item ID Item Desc UOM Unit Price Max Qty Max Amt 13 CHANGEABLE MESSAGE BOARD HOURLY SERVICE HR 150.00000 0.00 0.00 RATE 24-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying, and construction estimating, as required for the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such as labor, material, equipment, etc.48 HOURS RESPONSE TIME TO DIAGNOSE ISSUE ONCE NOTIFIED 24-48 HOURS RESPONSE TIME ONCE NOTIFIED TO COMPLETE REPLACEMENT OF DISPLAY MODULE 14 COMPONENT LIST AS WELL AS TRAINING INCLUDE BUT ARE NOT LIMITED TO THE FOLOWING EA 0.01000 0.00 0.00

Appears in 1 contract

Samples: Vermont Contract

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment This document consists of 2 pages1 page. Except as modified by this Amendment No. 1, all provisions of the Contract remain in full force and effect. The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. STATE OF VERMONT MARBLE VALLEY ENGINEERINGEUROVIA ATLANTIC COAST, P.C. LLC By: Name: Xxxxxxxxxxx Xxxx Title: BGS Commissioner Date: By: Name: Name: Title: Title: Date: MASTER COPY DISTRIBUTED (Contractor, Accounting, Regional Director, Project Manager, DFM) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES (Revised 03/2018) THE XXXXX XX XXXXXXX XXXXXXXX XX. 00000 STANDARD FORM OF AGREEMENT BETWEEN Date: Revision Date: 05/30/2019 Contract #35687 Amendment # 1 STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made this 18th day of June in the year 2018. BETWEEN Agency of Administration Department of Buildings and General Services Two Governor Aiken Avenue Montpelier, Vermont 05633-5801 the State. Marble Valley Engineering, P.C. 00 Xxxxx Xxxxxx Xxxxxxx, Xxxxxxx 00000 the ARCHITECT/ENGINEER. Office of Purchasing and Contracting NOVATION AND AMENDMENT It is hereby agreed by and among the intention State of Vermont, Buildings and General Services (hereinafter called "State"), Eurovia Atlantic Coast LLC, a limited liability company with a principal place of business in Chantilly, VA (hereinafter called “Contractor”) and The Lane Construction Corporation an incorporated company with a principal place of business in Cheshire, CT (hereinafter called " The Lane Construction Corporation”), that the Contractor intends to assume all of the State to utilize architectural rights, benefits, duties and engineering services on a as needed basis. obligations of The Lane Construction Corporation under the Contract between the State and The Lane Construction Corporation dated as of February 2, 2018, Contract # 35687, as amended to date (the ARCHITECT/ENGINEER agree as set forth below: The period of performance under this contract shall commence on June 18th, 2018 and end on June 18th, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying“Contract”), and construction estimating, that the Contract is hereby amended as required for the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such as labor, material, equipment, etc.follows:

Appears in 1 contract

Samples: Vermont Contract

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment SOV Cybersecurity Standard 19-01. All products and service provided to or for the use of the State under this Contract shall be in compliance with State of Vermont Cybersecurity Standard 19-01, which Contractor acknowledges has been provided to it, and is available on-line at the following URL:xxxxx://xxxxxxxxxxxxxxx.xxxxxxx.xxx/cybersecurity/cybersecurity-standards-and- directives This document consists of 2 pages. Except as modified by this Amendment No. 1, 3 all provisions of the Contract remain in full force and effect. Contract #30128 Amendment #3 The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. STATE OF VERMONT MARBLE VALLEY ENGINEERING, P.C. HP Inc By: Name: Xxxxxxxxxxx Xxxx Title: BGS Commissioner Date: By: Name: Name: Title: Title: Date: MASTER COPY DISTRIBUTED (Contractor, Accounting, Regional Director, Project Manager, DFM) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES (Revised 03/2018) THE XXXXX XX XXXXXXX XXXXXXXX XX. 00000 STANDARD FORM OF AGREEMENT BETWEEN Date: Contract #30128 Amendment #2 STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made this 18th day CONTRACT AMENDMENT It is hereby agreed by and between the State of June in the year 2018. BETWEEN Agency of Administration Vermont, Department of Buildings and General Services Two Governor Aiken Avenue MontpelierServices, Vermont 05633-5801 Office of Purchasing and Contracting. (the "State. Marble Valley Engineering") and HP Inc a principal place of business in Palo Alto, P.C. 00 Xxxxx Xxxxxx XxxxxxxCA (the "Contractor") that the contract between them originally dated as of October 01, Xxxxxxx 00000 the ARCHITECT/ENGINEER. It is the intention of the State to utilize architectural and engineering services on a as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth below: The period of performance under this contract shall commence on June 18th2015, 2018 and end on June 18th, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying, and construction estimatingContract #30128, as required for amended to date, (the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such “Contract”) is hereby amended as labor, material, equipment, etc.follows:

Appears in 1 contract

Samples: Valuepoint Master Agreement

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date that this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment. Cybersecurity Standard Update 2023-01. Contractor confirms that all products and services provided to or for the use of the State under this Agreement shall be in compliance with State of Vermont Cybersecurity Standard Update 2023-01, which prohibits the use of certain branded products in State information systems or any vendor system that is supporting State information systems, and is available on-line at: xxxxx://xxxxxxxxxxxxxxx.xxxxxxx.xxx/cybersecurity/cybersecurity-standards-and- directives. State and Federal Terms for Products and Services. Contractor agrees that “STATE OF VERMONT- FEDERAL TERMS SUPPLEMENT (Non-Construction) for all Contracts and Purchases of Products and Services Using Federal Funds (Revision date: July 28, 2022)” which is attached as Attachment G to this amendment, applies to any products or services provided to the State, at any time, when using federal funds. This document consists of 2 6 pages. Except as modified by this Amendment No. 1, 1 all provisions of the Contract remain in full force and effect. The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. WE THE UNDERSIGNED PARTIES AGREE TO BE BOUND BY THIS CONTRACT STATE OF VERMONT MARBLE VALLEY ENGINEERINGDepartment of Vermont Health Access CONTRACTOR Xxxxxxx Associates, P.C. ByInc. 4/1/2023 Xxxxxx De Xx Xxxxxx, Commissioner Date 000 Xxxxx Xxxxx NOB 1 SOUTH WATERBURY, VT 05671 PHONE: Name000-000-0000 Email: Xxxxxxxxxxx Xxxxxx.XxXxXxxxxx@xxxxxxx.xxx Xxxxx Xxxxxx, Senior Director 000 Xxxx Title: BGS Commissioner Date: By: Name: Title: Date: MASTER COPY DISTRIBUTED (ContractorXxxxxx XX 3/31/2023 Olympia, Accounting, Regional Director, Project Manager, DFM) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES (Revised 03/2018) THE XXXXX XX XXXXXXX XXXXXXXX XX. 00000 STANDARD FORM OF AGREEMENT BETWEEN WA 98506 000-000-0000 xxxxxxx@xxxxxxx.xxx ATTACHMENT G STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made VERMONT- FEDERAL TERMS SUPPLEMENT (Non-Construction) for all Contracts and Purchases of Products and Services Using Federal Funds (Revision date: July 28, 2022) PROCUREMENT OF RECOVERED MATERIALS In the performance of this 18th day contract, the Contractor shall make maximum use of June in products containing recovered materials that are EPA-designated Items unless the year 2018. BETWEEN Agency of Administration Department of Buildings and General Services Two Governor Aiken Avenue Montpelier, Vermont 05633-5801 the State. Marble Valley Engineering, P.C. 00 Xxxxx Xxxxxx Xxxxxxx, Xxxxxxx 00000 the ARCHITECT/ENGINEER. It is the intention of the State to utilize architectural and engineering services on a as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth below: The period of performance under this contract shall commence on June 18th, 2018 and end on June 18th, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may products cannot be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying, and construction estimating, as required for the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such as labor, material, equipment, etc.acquired-

Appears in 1 contract

Samples: dvha.vermont.gov

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment SOV Cybersecurity Standard 19-01. All products and service provided to or for the use of the State under this Contract shall be in compliance with State of Vermont Cybersecurity Standard 19-01, which Contractor acknowledges has been provided to it, and is available on-line at the following URL:xxxxx://xxxxxxxxxxxxxxx.xxxxxxx.xxx/cybersecurity/cybersecurity-standards-and- directives This document consists of 2 pages. Except as modified by this Amendment No. 15, all provisions of the Contract remain in full force and effect. Revision Date: 05/30/2019 Contract #30496 The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. STATE OF VERMONT MARBLE VALLEY ENGINEERING, P.C. CDW GOVERNMENT LLC By: Name: Xxxxxxxxxxx Xxxx _Jennifer Fitch Commissioner - Buildings and Title: BGS Commissioner General Services Date: By: Name: Title: Date: MASTER COPY DISTRIBUTED (Contractor, Accounting, Regional Director, Project Manager, DFM) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES (Revised 03/2018) THE XXXXX XX XXXXXXX XXXXXXXX XX. 00000 STANDARD FORM OF AGREEMENT BETWEEN Revision Date: 05/30/2019 Contract #30496 Amendment #4 STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made this 18th day CONTRACT AMENDMENT It is hereby agreed by and between the State of June in the year 2018. BETWEEN Agency of Administration Vermont, Department of Buildings and General Services Two Governor Aiken Avenue MontpelierServices, Vermont 05633-5801 Office of Purchasing and Contracting. (the "State") and CDW Government LLC with a principal place of business in Vernon Hills, IL (the "Contractor") that the contract between them originally dated as of October 01, 2015, Contract #30496, as amended to date, (the “Contract”) is hereby amended as follows: Taxes Due to the State. Marble Valley EngineeringContractor certifies under the pains and penalties of perjury that, P.C. 00 Xxxxx Xxxxxx Xxxxxxx, Xxxxxxx 00000 the ARCHITECT/ENGINEER. It is the intention as of the State to utilize architectural and engineering services on a as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth below: The period of performance under date this contract shall commence on June 18thamendment is signed, 2018 and end on June 18ththe Contractor is in good standing with respect to, 2020 or in full compliance with an option a plan to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may be utilized for design of new construction and renovation projectspay, including any and all phases from feasibility/programming through construction administrationtaxes due the State of Vermont. Child Support (Applicable to natural persons only; including but not limited applicable to code analysiscorporations, studies, permitting, CAD drafting, surveying, partnerships or LLCs). Contractor is under no obligation to pay child support or is in good standing with respect to or in full compliance with a plan to pay any and construction estimating, all child support payable under a support order as required for of the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such as labor, material, equipment, etcdate of this amendment.

Appears in 1 contract

Samples: Vermont Contract

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment SOV Cybersecurity Standard 19-01. All products and service provided to or for the use of the State under this Contract shall be in compliance with State of Vermont Cybersecurity Standard 19-01, which Contractor acknowledges has been provided to it, and is available on-line at the following URL:xxxxx://xxxxxxxxxxxxxxx.xxxxxxx.xxx/cybersecurity/cybersecurity-standards-and- directives This document consists of 2 pages. Except as modified by this Amendment No. 12, all provisions of the Contract remain in full force and effect. The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. STATE OF VERMONT MARBLE VALLEY ENGINEERING, P.C. ADIRONDACK CABLING INC By: Name: Xxxxxxxxxxx Xxxx Title: BGS Commissioner Date: By: Name: Name: Title: Title: Date: MASTER COPY DISTRIBUTED (Contractor, Accounting, Regional Director, Project Manager, DFM) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES (Revised 03/2018) THE XXXXX XX XXXXXXX XXXXXXXX XX. 00000 STANDARD FORM OF AGREEMENT BETWEEN Date: STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made this 18th day CONTRACT AMENDMENT It is hereby agreed by and between the State of June in the year 2018. BETWEEN Agency of Administration Vermont, Department of Buildings and General Services Two Governor Aiken Avenue MontpelierServices, Vermont 05633-5801 Office of Purchasing and Contracting. (the "State. Marble Valley Engineering") and Adirondack Cabling Inc, P.C. 00 Xxxxx Xxxxxx Xxxxxxxwith a principal place of business in Albany, Xxxxxxx 00000 NY (the ARCHITECT/ENGINEER. It is "Contractor") that the intention contract between them originally dated as of the State to utilize architectural and engineering services on a as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth below: The period of performance under this contract shall commence on June 18thNovember 1, 2018 and end on June 18th2017, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying, and construction estimatingContract # 35228, as required for amended to date, (the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such “Contract”) is hereby amended as labor, material, equipment, etc.follows:

Appears in 1 contract

Samples: Vermont Contract

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract Novation and amendment is signed, neither Contractor Party nor ContractorParty’s principals (officers, directors, owners, or partners) Revision Date: 12/12/18 Xxxxxxxx # 00000 are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date that this contract Novation and amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment This document consists of 2 pages. Except as modified by this Amendment No. 13, all provisions of the Contract remain in full force and effect. For State administrative purposes, upon signing of this Novation and amendment, the contract number will be changed to 39718 with an unpaid balance of $7,041.90. The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment Novation and amendment to the Contract. STATE OF VERMONT MARBLE VALLEY ENGINEERING, P.C. FireProTec By: By: Name: Xxxxxxxxxxx Xxxx Name: Title: BGS Commissioner Title: Date: Date: Impact Fire Services, LLC By: Name: Title: Date: MASTER COPY DISTRIBUTED (Contractor, Accounting, Regional Director, Project Manager, DFM) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES (Revised 03/2018) THE XXXXX XX XXXXXXX XXXXXXXX XX. 00000 STANDARD FORM OF AGREEMENT BETWEEN Revision Date: 12/12/18 Contract #33376 Amendment #2 STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made this 18th day CONTRACT AMENDMENT It is hereby agreed by and between the State of June in the year 2018. BETWEEN Agency of Administration Vermont, Department of Buildings and & General Services Two Governor Aiken Avenue Montpelier(the "State") and FireProTec with a principal place of business in Colchester, Vermont 05633-5801 VT (the State. Marble Valley Engineering"Contractor") that the contract between them originally dated as of March 1, P.C. 00 Xxxxx Xxxxxx Xxxxxxx2017, Xxxxxxx 00000 the ARCHITECT/ENGINEER. It is the intention of the State to utilize architectural and engineering services on a as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth below: The period of performance under this contract shall commence on June 18th, 2018 and end on June 18th, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying, and construction estimatingContract #33376, as required for amended to date, (the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such “Contract”) is hereby amended as labor, material, equipment, etc.follows:

Appears in 1 contract

Samples: bgs.vermont.gov

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Revision Date: 05/30/2019 Contractor further certifies under pains and penalties of perjury that, as of the date this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment State and Federal Terms for Products and Services related the 2020 Covid-19 Pandemic. Contractor agrees that “STATE OF VERMONT- FEDERAL TERMS SUPPLEMENT (Non- Construction) for all Contracts and Purchases of Products and Services Connected with 2020 Pandemic,” which is attached as Attachment to this amendment, applies to any products or services provided to the State, at any time, in connection with the 2020 Pandemic. This document consists of 2 5 pages. Except as modified by this Amendment No. 1, all provisions of the Contract remain in full force and effect. The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. STATE OF VERMONT MARBLE VALLEY ENGINEERINGHD SUPPLY CONSTRUCTION SUPPLY, P.C. LTD. By: Name: Xxxxxxxxxxx Xxxx Title: BGS Commissioner Date: By: Name: Name: Title: Title: Date: MASTER COPY DISTRIBUTED (Contractor, Accounting, Regional Director, Project Manager, DFM) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES (Revised 03/2018) THE XXXXX XX XXXXXXX XXXXXXXX XX. 00000 STANDARD FORM OF AGREEMENT BETWEEN Date: Revision Date: 05/30/2019 ATTACHMENT D STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made VERMONT- FEDERAL TERMS SUPPLEMENT (Non-Construction) for all Contracts and Purchases1 of Products and Services Connected with 2020 Pandemic XXXX ANTI-LOBBYING AMENDMENT Contractors who apply or bid for an award of $100,000 or more certify that each tier certifies to the tier above that it will not and has not used Federal appropriated funds to pay any person or organization for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, officer or employee of Congress, or an employee of a Member of Congress in connection with obtaining any Federal contract, grant, or any other award covered by 31 U.S.C. § 1352. Each tier shall also disclose any lobbying with non-Federal funds that takes place in connection with obtaining any Federal award. Such disclosures are forwarded from tier to tier, up to the recipient who in turn will forward the certification(s) to the awarding agency PROCUREMENT OF RECOVERED MATERIALS In the performance of this 18th day contract, the Contractor shall make maximum use of June in products containing recovered materials that are EPA-designated Items unless the year 2018. BETWEEN Agency of Administration Department of Buildings and General Services Two Governor Aiken Avenue Montpelier, Vermont 05633-5801 the State. Marble Valley Engineering, P.C. 00 Xxxxx Xxxxxx Xxxxxxx, Xxxxxxx 00000 the ARCHITECT/ENGINEER. It is the intention of the State to utilize architectural and engineering services on a as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth below: The period of performance under this contract shall commence on June 18th, 2018 and end on June 18th, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may products cannot be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying, and construction estimating, as required for the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such as labor, material, equipment, etc.acquired-

Appears in 1 contract

Samples: Vermont Contract

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment This document consists of 2 pages. Except as modified by this Amendment No. 13, all provisions of the Contract remain in full force and effect. The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. STATE OF VERMONT MARBLE VALLEY ENGINEERINGALLIANCE GROUP, P.C. INC. By: Name: Xxxxxxxxxxx Xxxx _Jennifer Fitch Commissioner - Buildings and Title: BGS Commissioner General Services Date: By: Name: Title: Date: MASTER COPY DISTRIBUTED (DISTRIBUTED: Contractor, Accounting, Regional Director, Project ManagerPM, DFM) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES (Revised 03/2018) THE XXXXX XX XXXXXXX XXXXXXXX XX. PC, PROJECT NAME: RET HVAC & Plumbing DEPT ID: Various FUND SOURCE: Capital PROJECT #: Various BUILDING #: Xxxxxxx Xxxxxxxx #00000 STANDARD FORM OF AGREEMENT BETWEEN Amendment #1 STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made this 18th day CONTRACT AMENDMENT It is hereby agreed by and between the State of June in the year 2018. BETWEEN Agency of Administration Vermont, Department of Buildings and & General Services Two Governor Aiken Avenue Montpelier(the "State") and Alliance Mechanical, Vermont 05633-5801 Inc. with a principal place of business in Essex Junction, VT (the State. Marble Valley Engineering"Contractor") that the contract between them originally dated as of November 1, P.C. 00 Xxxxx Xxxxxx Xxxxxxx2018, Xxxxxxx 00000 the ARCHITECT/ENGINEER. It is the intention of the State to utilize architectural and engineering services on a as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth below: The period of performance under this contract shall commence on June 18th, 2018 and end on June 18th, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying, and construction estimatingContract #37368, as required for amended to date, (the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such “Contract”) is hereby amended as labor, material, equipment, etc.follows:

Appears in 1 contract

Samples: Vermont Contract

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment State and Federal Terms for Products and Services related the 2020 Covid-19 Pandemic. Contractor agrees that “STATE OF VERMONT- FEDERAL TERMS SUPPLEMENT (Non-Construction) for all Contracts and Purchases of Products and Services Connected with 2020 Pandemic,” which is attached as Attachment D to this amendment, applies to any products or services provided to the State, at any time, in connection with the 2020 Pandemic. This document consists of 2 4 pages. Except as modified by this Amendment No. 1, all provisions of the Contract remain in full force and effect. The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. STATE OF VERMONT MARBLE VALLEY ENGINEERING, P.C. XXXXXXXX & SON INC. By: Name: Xxxxxxxxxxx Xxxx Title: BGS Commissioner Date: By: Name: Name: Title: Title: Date: MASTER COPY DISTRIBUTED (Contractor, Accounting, Regional Director, Project Manager, DFM) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES (Revised 03/2018) THE XXXXX XX XXXXXXX XXXXXXXX XX. 00000 STANDARD FORM OF AGREEMENT BETWEEN Date: Attachment D STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made VERMONT- FEDERAL TERMS SUPPLEMENT (Non-Construction) for all Contracts and Purchases1 of Products and Services Connected with 2020 Pandemic XXXX ANTI-LOBBYING AMENDMENT Contractors who apply or bid for an award of $100,000 or more certify that each tier certifies to the tier above that it will not and has not used Federal appropriated funds to pay any person or organization for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, officer or employee of Congress, or an employee of a Member of Congress in connection with obtaining any Federal contract, grant, or any other award covered by 31 U.S.C. § 1352. Each tier shall also disclose any lobbying with non-Federal funds that takes place in connection with obtaining any Federal award. Such disclosures are forwarded from tier to tier, up to the recipient who in turn will forward the certification(s) to the awarding agency PROCUREMENT OF RECOVERED MATERIALS In the performance of this 18th day contract, the Contractor shall make maximum use of June in products containing recovered materials that are EPA-designated Items unless the year 2018. BETWEEN Agency of Administration Department of Buildings and General Services Two Governor Aiken Avenue Montpelier, Vermont 05633-5801 the State. Marble Valley Engineering, P.C. 00 Xxxxx Xxxxxx Xxxxxxx, Xxxxxxx 00000 the ARCHITECT/ENGINEER. It is the intention of the State to utilize architectural and engineering services on a as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth below: The period of performance under this contract shall commence on June 18th, 2018 and end on June 18th, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may products cannot be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying, and construction estimating, as required for the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such as labor, material, equipment, etc.acquired-

Appears in 1 contract

Samples: Vermont Contract

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment This document consists of 2 pages. Except as modified by this Amendment No. 1, all provisions of the Contract remain in full force and effect. The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. STATE OF VERMONT MARBLE VALLEY ENGINEERINGBLACK RIVER DESIGN ARCHITECTS, P.C. PLC. By: Name: Xxxxxxxxxxx Xxxx Title: BGS Commissioner Date: By: Name: Name: Title: Title: Date: Date: MASTER COPY DISTRIBUTED (Contractor, Accounting, Regional Director, Project Manager, DFM) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES (Revised 03/2018) THE XXXXX XX XXXXXXX XXXXXXXX XX. 00000 STATE OF VERMONT STANDARD FORM OF AGREEMENT BETWEEN STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made this 18th day of June in the year 2018. BETWEEN Agency of Administration Department of Buildings and General Services Two Governor Aiken Avenue Montpelier, Vermont 05633-5801 the State. Marble Valley EngineeringBlack River Design Architects, P.C. PLC 00 Xxxxx Xxxxxx XxxxxxxXxxx Xxxxxx, Xxxx 0 Xxxxxxxxxx, Xxxxxxx 00000 the ARCHITECT/ENGINEER. It is the intention of the State to utilize architectural and engineering services on a as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth below: The period of performance under this contract shall commence on June 18th18th , 2018 and end on June 18th, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying, and construction estimating, as required for the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such as labor, material, equipment, etc.not

Appears in 1 contract

Samples: Vermont Contract

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment SOV Cybersecurity Standard 19-01. All products and service provided to or for the use of the State under this Contract shall be in compliance with State of Vermont Cybersecurity Standard 19-01, which Contractor acknowledges has been provided to it, and is available on-line at the following URL:xxxxx://xxxxxxxxxxxxxxx.xxxxxxx.xxx/cybersecurity/cybersecurity-standards-and- directives This document consists of 2 pages. Except as modified by this Amendment No. 14, all provisions of the Contract remain in full force and effect. The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. STATE OF VERMONT MARBLE VALLEY ENGINEERING, P.C. HEWLETT PACKARD ENTERPRISE By: Name: Xxxxxxxxxxx Xxxx Title: BGS Commissioner Date: By: Name: Name: Title: Title: Date: MASTER COPY DISTRIBUTED (Contractor, Accounting, Regional Director, Project Manager, DFM) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES (Revised 03/2018) THE XXXXX XX XXXXXXX XXXXXXXX XX. 00000 STANDARD FORM OF AGREEMENT BETWEEN Date: Contract #30149 Amendment #3 STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made this 18th day CONTRACT AMENDMENT It is hereby agreed by and between the State of June in the year 2018. BETWEEN Agency of Administration Vermont, Department of Buildings and General Services Two Governor Aiken Avenue MontpelierServices, Vermont 05633-5801 Office of Purchasing and Contracting. (the "State. Marble Valley Engineering") and Hewlett Packard Enterprise with a principal place of business in Palo Alto CA, P.C. 00 Xxxxx Xxxxxx Xxxxxxx(the "Contractor") that the contract between them originally dated as of October 1, Xxxxxxx 00000 the ARCHITECT/ENGINEER. It is the intention of the State to utilize architectural and engineering services on a as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth below: The period of performance under this contract shall commence on June 18th2015, 2018 and end on June 18th, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying, and construction estimatingContract #30149, as required for amended to date, (the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such “Contract”) is hereby amended as labor, material, equipment, etc.follows:

Appears in 1 contract

Samples: Vermont Contract

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment This document consists of 2 pages. Except as modified by this Amendment No. 1, all provisions of the Contract remain in full force and effect. The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. STATE OF VERMONT MARBLE VALLEY ENGINEERING, P.C. XXXXXX XXXXXXXXXX ARCHITECTURE By: Name: Xxxxxxxxxxx Xxxx Title: BGS Commissioner Date: By: Name: Name: Title: Title: Date: Date: MASTER COPY DISTRIBUTED (Contractor, Accounting, Regional Director, Project Manager, DFM) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES (Revised 03/2018) THE XXXXX XX XXXXXXX XXXXXXXX XX. 00000 STATE OF VERMONT STANDARD FORM OF AGREEMENT BETWEEN STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made this 18th day of June in the year 2018. BETWEEN Agency of Administration Department of Buildings and General Services Two Governor Aiken Avenue Montpelier, Vermont 05633-5801 the State. Marble Valley EngineeringXxxxxx Xxxxxxxxxx Architecture, P.C. 00 A Professional Corporation 000 Xxxxx Xxxxxxxxx Xxxxxx XxxxxxxXxxxxxxxxx, Xxxxxxx 00000 the ARCHITECT/ENGINEER. It is the intention of the State to utilize architectural and engineering services on a as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth below: The period of performance under this contract shall commence on June 18th, 2018 and end on June 18th, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying, and construction estimating, as required for the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such as labor, material, equipment, etc.not

Appears in 1 contract

Samples: Vermont Contract

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment State and Federal Terms for Products and Services related the 2020 Covid-19 Pandemic. Contractor agrees that “STATE OF VERMONT- FEDERAL TERMS SUPPLEMENT (Non- Construction) for all Contracts and Purchases of Products and Services Connected with 2020 Pandemic,” which is attached as Attachment D to this amendment, applies to any products or services provided to the State, at any time, in connection with the 2020 Pandemic. This document consists of 2 pages. Except as modified by this Amendment No. 13, all provisions of the Contract remain in full force and effect. Contract #37709 Change Order# 3 The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. STATE OF VERMONT MARBLE VALLEY ENGINEERINGP & P Septic Services, P.C. Inc By: Name: Xxxxxxxxxxx Xxxx Title: BGS Commissioner Date: By: Name: Name: Title: Title: Date: MASTER COPY DISTRIBUTED (Contractor, Accounting, Regional Director, Project Manager, DFM) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES (Revised 03/2018) THE XXXXX XX XXXXXXX XXXXXXXX XX. 00000 STANDARD FORM OF AGREEMENT BETWEEN Date: STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made VERMONT- FEDERAL TERMS SUPPLEMENT (Non-Construction) for all Contracts and Purchases1‌ of Products and Services Connected with 2020 Pandemic XXXX ANTI-LOBBYING AMENDMENT Contractors who apply or bid for an award of $100,000 or more certify that each tier certifies to the tier above that it will not and has not used Federal appropriated funds to pay any person or organization for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, officer or employee of Congress, or an employee of a Member of Congress in connection with obtaining any Federal contract, grant, or any other award covered by 31 U.S.C. § 1352. Each tier shall also disclose any lobbying with non-Federal funds that takes place in connection with obtaining any Federal award. Such disclosures are forwarded from tier to tier, up to the recipient who in turn will forward the certification(s) to the awarding agency PROCUREMENT OF RECOVERED MATERIALS In the performance of this 18th day contract, the Contractor shall make maximum use of June in products containing recovered materials that are EPA-designated Items unless the year 2018. BETWEEN Agency of Administration Department of Buildings and General Services Two Governor Aiken Avenue Montpelier, Vermont 05633-5801 the State. Marble Valley Engineering, P.C. 00 Xxxxx Xxxxxx Xxxxxxx, Xxxxxxx 00000 the ARCHITECT/ENGINEER. It is the intention of the State to utilize architectural and engineering services on a as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth below: The period of performance under this contract shall commence on June 18th, 2018 and end on June 18th, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may products cannot be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying, and construction estimating, as required for the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such as labor, material, equipment, etc.acquired-

Appears in 1 contract

Samples: Em Oorsec

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment SOV Cybersecurity Standard 19-01. All products and service provided to or for the use of the State under this Contract shall be in compliance with State of Vermont Cybersecurity Standard 19-01, which Contractor acknowledges has been provided to it, and is available on-line at the following URL:xxxxx://xxxxxxxxxxxxxxx.xxxxxxx.xxx/cybersecurity/cybersecurity-standards-and- directives This document consists of 2 pages. Except as modified by this Amendment No. 1No 2, all provisions of the Contract remain in full force and effect. The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. STATE OF VERMONT MARBLE VALLEY ENGINEERING, P.C. TOVEY SERVICES INC DBA NEW ENGLAND CALL CENTER By: Name: Xxxxxxxxxxx Xxxx Title: BGS Commissioner Date: By: Name: Name: Title: Title: Date: MASTER COPY DISTRIBUTED (Contractor, Accounting, Regional Director, Project Manager, DFM) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES (Revised 03/2018) THE XXXXX XX XXXXXXX XXXXXXXX XX. 00000 STANDARD FORM OF AGREEMENT BETWEEN Date: STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made this 18th day CONTRACT AMENDMENT It is hereby agreed by and between the State of June in the year 2018. BETWEEN Agency of Administration Vermont, Department of Buildings and General Services, Office of Purchasing and Contracting (the "State") and Tovey Services Two Governor Aiken Avenue MontpelierInc, Vermont 05633-5801 dba New England Call Center, with a principal place of business in Concord, NH (the State. Marble Valley Engineering"Contractor") that the contract between them originally dated as of August 27, P.C. 00 Xxxxx Xxxxxx Xxxxxxx2018, Xxxxxxx 00000 the ARCHITECT/ENGINEER. It is the intention of the State to utilize architectural and engineering services on a as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth below: The period of performance under this contract shall commence on June 18th, 2018 and end on June 18th, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying, and construction estimatingContract #36900, as required for amended to date, (the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such “Contract”) is hereby amended as labor, material, equipment, etc.follows:

Appears in 1 contract

Samples: Vermont Contract

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment This document consists of 2 pages. Except as modified by this Amendment No. 1, all provisions of the Contract remain in full force and effect. The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. STATE OF VERMONT MARBLE VALLEY GREEN MOUNTAIN ENGINEERING, P.C. INC. By: Name: Xxxxxxxxxxx Xxxx Title: BGS Commissioner Date: By: Name: Name: Title: Title: Date: Date: MASTER COPY DISTRIBUTED (Contractor, Accounting, Regional Director, Project Manager, DFM) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES (Revised 03/2018) THE XXXXX XX XXXXXXX XXXXXXXX XX. 00000 STATE OF VERMONT STANDARD FORM OF AGREEMENT BETWEEN STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made this 18th day of June in the year 2018. BETWEEN Agency of Administration Department of Buildings and General Services Two Governor Aiken Avenue Montpelier, Vermont 05633-5801 the State. Marble Valley Green Mountain Engineering, P.C. 00 Inc. 0000 Xxxxx Xxxxxx XxxxxxxXxxxxxxx Xxxx XX Xxx 000 Xxxxxxxxx, Xxxxxxx 00000 the ARCHITECT/ENGINEER. It is the intention of the State to utilize architectural and engineering services on a as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth below: The period of performance under this contract shall commence on June 18th, 2018 and end on June 18th, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying, and construction estimating, as required for the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such as labor, material, equipment, etc.not

Appears in 1 contract

Samples: Vermont Contract

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment xxxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment Cybersecurity Standard Update 2022-01. Contractor confirms that all products and services provided to or for the use of the State under this Agreement shall be in compliance with State of Vermont Cybersecurity Standard Update 2022-01, which prohibits the use of certain branded products in State information systems or any vendor system that is supporting State information systems, and is available on-line at: xxxxx://xxxxxxxxxxxxxxx.xxxxxxx.xxx/cybersecurity/cybersecurity-standards-and-directives . State and Federal Terms for Products and Services. Contractor agrees that “STATE OF VERMONT- FEDERAL TERMS SUPPLEMENT (Non-Construction) for all Contracts and Purchases of Products and Services Using Federal Funds (Revision date: July 28, 2022)” which is attached as Attachment G to this amendment, applies to any products or services provided to the State, at any time, when using federal funds. This document consists of 2 13 pages. Except as modified by this Amendment No. 1, all provisions of the Contract remain in full force and effect. The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. WE THE UNDERSIGNED PARTIES AGREE TO BE BOUND BY THIS CONTRACT. BY THE STATE OF VERMONT MARBLE VALLEY ENGINEERINGVERMONT: BY THE CONTRACTOR: 11/23/2022 Xxxxxx De Xx Xxxxxx, P.C. By: Name: Xxxxxxxxxxx Commissioner 000 Xxxxx Xxxxx, XXX 0 Xxxxx WATERBURY, VT 05671-1010 000-000-0000 Xxxxxx.XxXxXxxxxx@xxxxxxx.xxx 11/22/2022 Xxxx Title: BGS Commissioner Date: By: Name: Title: Date: MASTER COPY DISTRIBUTED X. Xxxxx, CPA, CHFP- Member 00000 Xxxxx xxxxxxx xxxxxx, Xxxxx 000 Xxxxxx Xxxxx, XX 00000 000-000-0000 XXxxxx@xxxx.xxx ATTACHMENT D INFORMATION TECHNOLOGY PROFESSIONAL SERVICES TERMS AND CONDITIONS (Contractor, Accounting, Regional Director, Project Manager, DFM) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES (Revised 03/2018) THE XXXXX XX XXXXXXX XXXXXXXX XXrev. 00000 STANDARD FORM OF AGREEMENT BETWEEN STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made this 18th day of June in the year 2018. BETWEEN Agency of Administration Department of Buildings and General Services Two Governor Aiken Avenue Montpelier, Vermont 05633-5801 the State. Marble Valley Engineering, P.C. 00 Xxxxx Xxxxxx Xxxxxxx, Xxxxxxx 00000 the ARCHITECT/ENGINEER. It is the intention of the State to utilize architectural and engineering services on a as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth below: The period of performance under this contract shall commence on June 18th, 2018 and end on June 18th, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying, and construction estimating, as required for the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such as labor, material, equipment, etc.07/14/2022)

Appears in 1 contract

Samples: State of Vermont Contract

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment This document consists of 2 pages. Except as modified by this Amendment No. 1, all provisions of the Contract remain in full force and effect. The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. STATE OF VERMONT MARBLE VALLEY XXXX-XXXXX-XXXXXXX ENGINEERING, P.C. By: Name: Xxxxxxxxxxx Xxxx Title: BGS Commissioner Date: By: Name: Name: Title: Title: Date: Date: MASTER COPY DISTRIBUTED (Contractor, Accounting, Regional Director, Project Manager, DFM) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES (Revised 03/2018) THE XXXXX XX XXXXXXX XXXXXXXX XX. 00000 STATE OF VERMONT STANDARD FORM OF AGREEMENT BETWEEN STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made this 18th day of June in the year 2018. BETWEEN Agency of Administration Department of Buildings and General Services Two Governor Aiken Avenue Montpelier, Vermont 05633-5801 the State. Marble Valley Xxxx-Xxxxx-Xxxxxxx Engineering, P.C. 00 Xxxxx Xxxxxx Xxxxxxx, Xxxxxxx Xxx Xxxxxxxxx 00000 the ARCHITECT/ENGINEER. It is the intention of the State to utilize architectural and engineering services on a as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth below: The period of performance under this contract shall commence on June 18th, 2018 and end on June 18th, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying, and construction estimating, as required for the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such as labor, material, equipment, etc.

Appears in 1 contract

Samples: Vermont Contract

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment State and Federal Terms for Products and Services related the 2020 Covid-19 Pandemic. Contractor agrees that “STATE OF VERMONT- FEDERAL TERMS SUPPLEMENT (Non- Construction) for all Contracts and Purchases of Products and Services Connected with 2020 Pandemic,” which is attached as Attachment D to this amendment, applies to any products or services provided to the State, at any time, in connection with the 2020 Pandemic. This document consists of 2 4 pages. Except as modified by this Amendment No. 1, all provisions of the Contract remain in full force and effect. The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. STATE OF VERMONT MARBLE VALLEY ENGINEERING, P.C. MSC INDUSTRIAL SUPPLY CO. By: Name: Xxxxxxxxxxx Xxxx Title: BGS Commissioner Date: By: Name: Name: Title: Title: Date: MASTER COPY DISTRIBUTED (Contractor, Accounting, Regional Director, Project Manager, DFM) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES (Revised 03/2018) THE XXXXX XX XXXXXXX XXXXXXXX XX. 00000 STANDARD FORM OF AGREEMENT BETWEEN Date: Attachment D STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made VERMONT- FEDERAL TERMS SUPPLEMENT (Non-Construction) for all Contracts and Purchases1 of Products and Services Connected with 2020 Pandemic XXXX ANTI-LOBBYING AMENDMENT Contractors who apply or bid for an award of $100,000 or more certify that each tier certifies to the tier above that it will not and has not used Federal appropriated funds to pay any person or organization for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, officer or employee of Congress, or an employee of a Member of Congress in connection with obtaining any Federal contract, grant, or any other award covered by 31 U.S.C. § 1352. Each tier shall also disclose any lobbying with non-Federal funds that takes place in connection with obtaining any Federal award. Such disclosures are forwarded from tier to tier, up to the recipient who in turn will forward the certification(s) to the awarding agency PROCUREMENT OF RECOVERED MATERIALS In the performance of this 18th day contract, the Contractor shall make maximum use of June in products containing recovered materials that are EPA-designated Items unless the year 2018. BETWEEN Agency of Administration Department of Buildings and General Services Two Governor Aiken Avenue Montpelier, Vermont 05633-5801 the State. Marble Valley Engineering, P.C. 00 Xxxxx Xxxxxx Xxxxxxx, Xxxxxxx 00000 the ARCHITECT/ENGINEER. It is the intention of the State to utilize architectural and engineering services on a as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth below: The period of performance under this contract shall commence on June 18th, 2018 and end on June 18th, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may products cannot be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying, and construction estimating, as required for the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such as labor, material, equipment, etc.acquired-

Appears in 1 contract

Samples: Vermont Contract

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment State and Federal Terms for Products and Services related the 2020 Covid-19 Pandemic. Contractor agrees that “STATE OF VERMONT- FEDERAL TERMS SUPPLEMENT (Non- Construction) for all Contracts and Purchases of Products and Services Connected with 2020 Pandemic,” which is attached as Attachment D to this amendment, applies to any products or services provided to the State, at any time, in connection with the 2020 Pandemic. This document consists of 2 pages. Except as modified by this Amendment No. 1, all provisions of the Contract remain in full force and effect. Revision Date: 05/30/2019 Contract #38057 The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. STATE OF VERMONT MARBLE VALLEY ENGINEERING, P.C. Grainger By: Name: Xxxxxxxxxxx Xxxx Title: BGS Commissioner Date: By: Name: Name: Title: Title: Date: MASTER COPY DISTRIBUTED (Contractor, Accounting, Regional Director, Project Manager, DFM) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES (Revised 03/2018) THE XXXXX XX XXXXXXX XXXXXXXX XX. 00000 STANDARD FORM OF AGREEMENT BETWEEN Date: Revision Date: 05/30/2019 Attachment D STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made VERMONT- FEDERAL TERMS SUPPLEMENT (Non-Construction) for all Contracts and Purchases1 of Products and Services Connected with 2020 Pandemic XXXX ANTI-LOBBYING AMENDMENT Contractors who apply or bid for an award of $100,000 or more certify that each tier certifies to the tier above that it will not and has not used Federal appropriated funds to pay any person or organization for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, officer or employee of Congress, or an employee of a Member of Congress in connection with obtaining any Federal contract, grant, or any other award covered by 31 U.S.C. § 1352. Each tier shall also disclose any lobbying with non-Federal funds that takes place in connection with obtaining any Federal award. Such disclosures are forwarded from tier to tier, up to the recipient who in turn will forward the certification(s) to the awarding agency PROCUREMENT OF RECOVERED MATERIALS In the performance of this 18th day contract, the Contractor shall make maximum use of June in products containing recovered materials that are EPA-designated Items unless the year 2018. BETWEEN Agency of Administration Department of Buildings and General Services Two Governor Aiken Avenue Montpelier, Vermont 05633-5801 the State. Marble Valley Engineering, P.C. 00 Xxxxx Xxxxxx Xxxxxxx, Xxxxxxx 00000 the ARCHITECT/ENGINEER. It is the intention of the State to utilize architectural and engineering services on a as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth below: The period of performance under this contract shall commence on June 18th, 2018 and end on June 18th, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may products cannot be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying, and construction estimating, as required for the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such as labor, material, equipment, etc.acquired-

Appears in 1 contract

Samples: Vermont Contract

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment State and Federal Terms for Products and Services related the 2020 Covid-19 Pandemic. Contractor agrees that “STATE OF VERMONT- FEDERAL TERMS SUPPLEMENT (Non- Construction) for all Contracts and Purchases of Products and Services Connected with 2020 Pandemic,” which is attached as Attachment 4 to this amendment, applies to any products or services provided to the State, at any time, in connection with the 2020 Pandemic. This document consists of 2 pages1 page. Except as modified by this Amendment No. 14, all provisions of the Contract remain in full force and effect. Revision Date: 05/30/2019 The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. STATE OF VERMONT MARBLE VALLEY ENGINEERING, P.C. Vermont Correctional Industries Vermont By: Name: Xxxxxxxxxxx Xxxx Title: BGS Commissioner Date: By: Name: Name: Title: Title: Date: MASTER COPY DISTRIBUTED (Contractor, Accounting, Regional Director, Project Manager, DFM) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES (Revised 03/2018) THE XXXXX XX XXXXXXX XXXXXXXX XX. 00000 STANDARD FORM OF AGREEMENT BETWEEN Date: Revision Date: 05/30/2019 Attachment E STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made VERMONT- FEDERAL TERMS SUPPLEMENT (Non-Construction) for all Contracts and Purchases1 of Products and Services Connected with 2020 Pandemic XXXX ANTI-LOBBYING AMENDMENT Contractors who apply or bid for an award of $100,000 or more certify that each tier certifies to the tier above that it will not and has not used Federal appropriated funds to pay any person or organization for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, officer or employee of Congress, or an employee of a Member of Congress in connection with obtaining any Federal contract, grant, or any other award covered by 31 U.S.C. § 1352. Each tier shall also disclose any lobbying with non-Federal funds that takes place in connection with obtaining any Federal award. Such disclosures are forwarded from tier to tier, up to the recipient who in turn will forward the certification(s) to the awarding agency PROCUREMENT OF RECOVERED MATERIALS In the performance of this 18th day contract, the Contractor shall make maximum use of June in products containing recovered materials that are EPA-designated Items unless the year 2018. BETWEEN Agency of Administration Department of Buildings and General Services Two Governor Aiken Avenue Montpelier, Vermont 05633-5801 the State. Marble Valley Engineering, P.C. 00 Xxxxx Xxxxxx Xxxxxxx, Xxxxxxx 00000 the ARCHITECT/ENGINEER. It is the intention of the State to utilize architectural and engineering services on a as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth below: The period of performance under this contract shall commence on June 18th, 2018 and end on June 18th, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may products cannot be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying, and construction estimating, as required for the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such as labor, material, equipment, etc.acquired-

Appears in 1 contract

Samples: Vermont Contract

AutoNDA by SimpleDocs

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment Cybersecurity Standard Update 2023-01: Contractor confirms that all products and services provided to or for the use of the State under this Agreement shall be in compliance with State of Vermont Cybersecurity Standard Update 2023-01, which prohibits the use of certain branded products in State information systems or any vendor system that is supporting State information systems, and is available on-line at: xxxxx://xxxxxxxxxxxxxxx.xxxxxxx.xxx/sites/digitalservices/files/doc_library/Cybersecurity_Standard_Update_2023- 01.pdf. State and Federal Terms for Products and Services. Contractor agrees that “STATE OF VERMONT- FEDERAL TERMS SUPPLEMENT (Non-Construction) for all Contracts and Purchases of Products and Services Using Federal Funds (Revision date: July 28, 2022)” which is attached as Attachment G to this amendment, applies to any products or services provided to the State, at any time, when using federal funds. This document consists of 2 five (5) pages. Except as modified by this Amendment No. 13, all provisions of the Contract remain in full force and effect. The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. STATE DEPARTMENT OF VERMONT MARBLE VALLEY ENGINEERINGHEALTH ACCESS CHANGE HEALTHCARE PHARMACY SOLUTIONS, P.C. ByINC. 3/13/2023 3/6/2023 Xxxxxx De Xx Xxxxxx Commissioner XXX 0 Xxxxx, 000 Xxxxx Xxxxx Waterbury, VT 00000-0000 Phone: Name000-000-0000 Email: Xxxxxxxxxxx Xxxx TitleXxxxxx.XxXxXxxxxx@xxxxxxx.xxx Xxx Xxxxxx Senior Vice President & General Manager 00 Xxxxxxxx Xxxxx, Xxxxx 0 Augusta, ME 04330 Phone: BGS Commissioner Date(000) 000-0000 X 00000 Email: By: Name: Title: Date: MASTER COPY DISTRIBUTED (Contractor, Accounting, Regional Director, Project Manager, DFM) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES (Revised 03/2018) THE XXXXX XX XXXXXXX XXXXXXXX XX. 00000 STANDARD FORM OF AGREEMENT BETWEEN STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made this 18th day of June in the year 2018. BETWEEN Agency of Administration Department of Buildings and General Services Two Governor Aiken Avenue Montpelier, Vermont 05633-5801 the State. Marble Valley Engineering, P.C. 00 Xxxxx Xxxxxx Xxxxxxx, Xxxxxxx 00000 the ARCHITECT/ENGINEER. It is the intention of the State to utilize architectural and engineering services on a as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth below: The period of performance under this contract shall commence on June 18th, 2018 and end on June 18th, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying, and construction estimating, as required for the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such as labor, material, equipment, etc.xxxxxxx@xxxxxxxxxxxxxxxx.xxx ATTACHMENT G

Appears in 1 contract

Samples: Vermont Contract

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s 's principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s 's debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment This document consists of 2 3 pages. Except as modified by this Amendment No. 1, all provisions of the Contract remain in full force and effect. The signatures [Remainder of the undersigned indicate that each has read Page Intentionally Left Blank] State of Vermont Buildings and agrees General Services Office of Purchasing & Contracting 000 Xxxxx Xx Xxxxxxxxxx XX 00000-0000 XXXXXXXX Xxxxxx Xxxxxx Contract ID 0000000000000000000031184 Page 3 of 3 Vendor ID 0000352392 Telelanguage Inc. Contract Dates 05/01/2016 to be bound by this Amendment to the Contract. 04/30/2020 Origin CPS 000 XX 0xx Xxx 0xx Xx Xxxxxxxx XX 00000 Description: CPS Translation and Interp Contract Maximum$300,000.00 United States Buyer Name Bu Xxxxxxx X Xxxxxxx yer Phone Contract Status Approved Phone #: Line # Item ID Item Desc UOM Unit Price Max Qty Max Amt STATE OF VERMONT MARBLE VALLEY ENGINEERINGCONTRACT #31184 AMENDMENT#2 It is hereby agreed by and between the State of Vermont, P.C. By: Name: Xxxxxxxxxxx Xxxx Title: BGS Commissioner Date: By: Name: Title: Date: MASTER COPY DISTRIBUTED (Contractor, Accounting, Regional Director, Project Manager, DFM) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES (Revised 03/2018) THE XXXXX XX XXXXXXX XXXXXXXX XX. 00000 STANDARD FORM OF AGREEMENT BETWEEN STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made this 18th day of June in the year 2018. BETWEEN Agency of Administration The Department of Buildings and General Services Two Governor Aiken Avenue MontpelierServices, Vermont 05633-5801 Office of Purchasing and Contracting (the "State. Marble Valley Engineering") and Telelanguage Inc., P.C. 00 Xxxxx Xxxxxx Xxxxxxxwith a principal place of business in Portland, Xxxxxxx 00000 OR (the ARCHITECT/ENGINEER. It is "Contractor") that the intention contract between them originally dated as of the State to utilize architectural and engineering services on a as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth below: The period of performance under this contract shall commence on June 18thMay 01, 2018 and end on June 18th2016, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying, and construction estimatingContract # 31184, as required for amended to date, (the specific project. Projects are not to exceed $50,000.00"Contract") is hereby amended as follows: REMOVE/EXPAND/REVISE THE BELOW AMENDMENT ITEMS, including all costs associated with the individual project, such as labor, material, equipment, etc.AS APPLICABLE

Appears in 1 contract

Samples: Vermont Contract

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment SOV Cybersecurity Standard 19-01. All products and service provided to or for the use of the State under this Contract shall be in compliance with State of Vermont Cybersecurity Standard 19-01, which Contractor acknowledges has been provided to it, and is available on-line at the following URL:xxxxx://xxxxxxxxxxxxxxx.xxxxxxx.xxx/cybersecurity/cybersecurity-standards-and-directives This document consists of 2 ten (10) pages. Except as modified by this Amendment No. 12, all provisions of the Contract remain in full force and effect. The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. STATE OF VERMONT MARBLE VALLEY ENGINEERING, P.C. By: Name: Xxxxxxxxxxx Xxxx Title: BGS Commissioner Date: By: Name: Title: Date: MASTER COPY DISTRIBUTED (Contractor, Accounting, Regional Director, Project Manager, DFM) CONTRACTOR DEPARTMENT OF BUILDINGS VERMONT HEALTH ACCESS XXXXXX CONSULTING SERVICES, LLC XXXXX XXXXXXX DATE NOB 1 South, 000 Xxxxx Xxxxx Xxxxxxxxx, XX 00000-0000 Phone: 000-000-0000 Email: Xxxxx.Xxxxxxx@xxxxxxx.xxx XXXXX XXXXX, PRINCIPAL ACTUARY DATE 0000 Xxxxx Xxxxxx, Xxxxx 000 Xxxxxx, XX 00000 Phone: 000-000-0000 Email: XxxxxX@xxxxxx.xxx ATTACHMENT E BUSINESS ASSOCIATE AGREEMENT SOV CONTRACT BUSINESS ASSOCIATE: Xxxxxx Consulting Group LLC. SOV CONTRACT No. 36167 CONTRACT Effective DATE: June 15, 2018 THIS BUSINESS ASSOCIATE AGREEMENT (“AGREEMENT”) IS ENTERED INTO BY AND GENERAL SERVICES (Revised 03/2018) BETWEEN THE XXXXX XX XXXXXXX XXXXXXXX XX. 00000 STANDARD FORM OF AGREEMENT BETWEEN STATE OF VERMONT AGENCY OF HUMAN SERVICES, OPERATING BY AND THROUGH ITS DEPARTMENT OF VERMONT HEALTH ACCESS (“COVERED ENTITY”) AND PARTY IDENTIFIED IN THIS AGREEMENT AS CONTRACTOR OR ANY AGENCY THEREOF GRANTEE ABOVE (“BUSINESS ASSOCIATE”). THIS AGREEMENT SUPPLEMENTS AND ARCHITECT/ENGINEER AGREEMENT made IS MADE A PART OF THE CONTRACT OR GRANT (“CONTRACT OR GRANT”) TO WHICH IT IS ATTACHED. Covered Entity and Business Associate enter into this 18th day Agreement to comply with the standards promulgated under the Health Insurance Portability and Accountability Act of June in 1996 (“HIPAA”), including the year 2018. BETWEEN Agency Standards for the Privacy of Administration Department of Buildings Individually Identifiable Health Information, at 45 CFR Parts 160 and General Services Two Governor Aiken Avenue Montpelier164 (“Privacy Rule”), Vermont 05633-5801 and the State. Marble Valley EngineeringSecurity Standards, P.C. 00 Xxxxx Xxxxxx Xxxxxxxat 45 CFR Parts 160 and 164 (“Security Rule”), Xxxxxxx 00000 the ARCHITECT/ENGINEER. It is the intention as amended by Subtitle D of the State to utilize architectural Health Information Technology for Economic and engineering services on a as needed basisClinical Health Act (HITECH), and any associated federal rules and regulations. The State and the ARCHITECT/ENGINEER parties agree as set forth below: The period of performance under this contract shall commence on June 18th, 2018 and end on June 18th, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying, and construction estimating, as required for the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such as labor, material, equipment, etc.follows:

Appears in 1 contract

Samples: Vermont Contract

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment This document consists of 2 pages. Except as modified by this Amendment No. 12, all provisions of the Contract remain in full force and effect. The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. STATE OF VERMONT MARBLE VALLEY ENGINEERINGOVERHEAD DOOR COMPANY OF RUTLAND, P.C. INC. By: Name: Xxxxxxxxxxx Xxxx Title: BGS Commissioner Date: By: Name: Name: Title: Title: Date: Date: MASTER COPY DISTRIBUTED (DISTRIBUTED: Contractor, Accounting, Regional Director, Project ManagerPM, DFM) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES (Revised 03/2018) THE XXXXX XX XXXXXXX XXXXXXXX XXPC, ETC. 00000 STANDARD FORM OF AGREEMENT BETWEEN PROJECT NAME: DEPT ID: FUND SOURCE: PROJECT #: BUILDING #: Contract #37051 Amendment #1 STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made this 18th day CONTRACT AMENDMENT It is hereby agreed by and between the State of June in the year 2018. BETWEEN Agency of Administration Vermont, Department of Buildings and & General Services Two Governor Aiken Avenue Montpelier(the "State") and Overhead Door Company of Rutland, Vermont 05633-5801 Inc. with a principal place of business in Rutland VT (the State. Marble Valley Engineering"Contractor") that the contract between them originally dated as of September 15, P.C. 00 Xxxxx Xxxxxx Xxxxxxx2018, Xxxxxxx 00000 the ARCHITECT/ENGINEER. It is the intention of the State to utilize architectural and engineering services on a as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth below: The period of performance under this contract shall commence on June 18th, 2018 and end on June 18th, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying, and construction estimatingContract # 37051, as required for amended to date, (the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such “Contract”) is hereby amended as labor, material, equipment, etc.follows:

Appears in 1 contract

Samples: Vermont Contract

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment Cybersecurity Standard Update 2022-01: Contractor confirms that all products and services provided to or for the use of the State under this Agreement shall be in compliance with State of Vermont Cybersecurity Standard Update 2022-01, which prohibits the use of certain branded products in State information systems or any vendor system that is supporting State information systems, and is available on-line at: xxxxx://xxxxxxxxxxxxxxx.xxxxxxx.xxx/cybersecurity/cybersecurity-standards-and-directives. This document consists of 2 pages. Except as modified by this Amendment No. 13, all provisions of the Contract remain in full force and effect. The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. STATE OF VERMONT MARBLE VALLEY ENGINEERINGShred This, P.C. Inc., d/b/a SecurShred By: Name: Xxxxxxxxxxx Xxxx Xxxxxxxx X.X. Xxxxx Title: BGS Commissioner Date: By: Name: Title: Date: MASTER COPY DISTRIBUTED (Contractor, Accounting, Regional Director, Project Manager, DFM) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES (Revised 03/2018) THE XXXXX XX XXXXXXX XXXXXXXX XX. 00000 STANDARD FORM OF AGREEMENT BETWEEN Date: STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made this 18th day CONTRACT AMENDMENT It is hereby agreed by and between the State of June in the year 2018. BETWEEN Agency of Administration Vermont, Department of Buildings and General Services Two Governor Aiken Avenue MontpelierOffice of Purchasing & Contracting(the "State") and Shred This, Vermont 05633-5801 Inc., d/b/a SecurShred, with a principal place of business in South Burlington, VT (the State. Marble Valley Engineering"Contractor") that the contract between them originally dated as of October 21, P.C. 00 Xxxxx Xxxxxx Xxxxxxx2019, Xxxxxxx 00000 the ARCHITECT/ENGINEER. It is the intention of the State to utilize architectural and engineering services on a as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth below: The period of performance under this contract shall commence on June 18th, 2018 and end on June 18th, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying, and construction estimatingContract # 38951, as required for amended to date, (the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such “Contract”) is hereby amended as labor, material, equipment, etc.follows:

Appears in 1 contract

Samples: Vermont Contract

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment This document consists of 2 pages. Except as modified by this Amendment No. 1, all provisions of the Contract remain in full force and effect. The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. STATE OF VERMONT MARBLE VALLEY ENGINEERINGXXXXXXXXX-XXXXXXX, P.C. INC. By: Name: Xxxxxxxxxxx Xxxx Title: BGS Commissioner Date: By: Name: Name: Title: Title: Date: Date: MASTER COPY DISTRIBUTED (Contractor, Accounting, Regional Director, Project Manager, DFM) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES (Revised 03/2018) THE XXXXX XX XXXXXXX XXXXXXXX XX. 00000 STATE OF VERMONT STANDARD FORM OF AGREEMENT BETWEEN STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made this 18th day of June in the year 2018. BETWEEN Agency of Administration Department of Buildings and General Services Two Governor Aiken Avenue Montpelier, Vermont 05633-5801 the State. Marble Valley Engineering, P.C. 00 Xxxxx Xxxxxx XxXxxxxxx-Xxxxxxx, Inc. 00 Xxxxxxx 00000 Xxxxxx South Burlington, Vermont 05403-6112 the ARCHITECT/ENGINEER. It is the intention of the State to utilize architectural and engineering services on a as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth below: The period of performance under this contract shall commence on June 18th, 2018 and end on June 18th, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying, and construction estimating, as required for the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such as labor, material, equipment, etc.

Appears in 1 contract

Samples: Vermont Contract

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment This document consists of 2 pages. Except as modified by this Amendment No. 1, all provisions of the Contract remain in full force and effect. The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. STATE OF VERMONT MARBLE VALLEY ENGINEERINGXXXXXXX & ASSOCIATES, P.C. By: Name: Xxxxxxxxxxx Xxxx Title: BGS Commissioner Date: By: Name: Name: Title: Title: Date: Date: MASTER COPY DISTRIBUTED (Contractor, Accounting, Regional Director, Project Manager, DFM) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES (Revised 03/2018) THE XXXXX XX XXXXXXX XXXXXXXX XX. 00000 STATE OF VERMONT STANDARD FORM OF AGREEMENT BETWEEN STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made this 18th day of June in the year 2018. BETWEEN Agency of Administration Department of Buildings and General Services Two Governor Aiken Avenue Montpelier, Vermont 05633-5801 the State. Marble Valley EngineeringXxxxxxx & Associates, P.C. 00 Xxxxx Xxxx Xxxxxx XxxxxxxXX Xxx 0000 Xxxxxxxxxxx, Xxxxxxx 00000 the ARCHITECT/ENGINEER. It is the intention of the State to utilize architectural and engineering services on a as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth below: The period of performance under this contract shall commence on June 18th, 2018 and end on June 18th, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying, and construction estimating, as required for the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such as labor, material, equipment, etc.

Appears in 1 contract

Samples: Vermont Contract

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment SOV Cybersecurity Standard 19-01. All products and service provided to or for the use of the State under this Contract shall be in compliance with State of Vermont Cybersecurity Standard 19-01, which Contractor acknowledges has been provided to it, and is available on-line at the following URL:xxxxx://xxxxxxxxxxxxxxx.xxxxxxx.xxx/cybersecurity/cybersecurity-standards-and- directives This document consists of 2 pages. Except as modified by this Amendment No. 15, all provisions of the Contract remain in full force and effect. Revision Date: 05/30/2019 Contract #30496 The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. STATE OF VERMONT MARBLE VALLEY ENGINEERING, P.C. CDW GOVERNMENT LLC By: Name: Xxxxxxxxxxx Xxxx _Xxxxxxxx Xxxxx Commissioner - Buildings and Title: BGS Commissioner General Services Date: By: Name: Title: Date: MASTER COPY DISTRIBUTED (Contractor, Accounting, Regional Director, Project Manager, DFM) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES (Revised 03/2018) THE XXXXX XX XXXXXXX XXXXXXXX XX. 00000 STANDARD FORM OF AGREEMENT BETWEEN Revision Date: 05/30/2019 Contract #30496 Amendment #4 STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made this 18th day CONTRACT AMENDMENT It is hereby agreed by and between the State of June in the year 2018. BETWEEN Agency of Administration Vermont, Department of Buildings and General Services Two Governor Aiken Avenue MontpelierServices, Vermont 05633-5801 Office of Purchasing and Contracting. (the "State") and CDW Government LLC with a principal place of business in Vernon Hills, IL (the "Contractor") that the contract between them originally dated as of October 01, 2015, Contract #30496, as amended to date, (the “Contract”) is hereby amended as follows: Taxes Due to the State. Marble Valley EngineeringContractor certifies under the pains and penalties of perjury that, P.C. 00 Xxxxx Xxxxxx Xxxxxxx, Xxxxxxx 00000 the ARCHITECT/ENGINEER. It is the intention as of the State to utilize architectural and engineering services on a as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth below: The period of performance under date this contract shall commence on June 18thamendment is signed, 2018 and end on June 18ththe Contractor is in good standing with respect to, 2020 or in full compliance with an option a plan to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may be utilized for design of new construction and renovation projectspay, including any and all phases from feasibility/programming through construction administrationtaxes due the State of Vermont. Child Support (Applicable to natural persons only; including but not limited applicable to code analysiscorporations, studies, permitting, CAD drafting, surveying, partnerships or LLCs). Contractor is under no obligation to pay child support or is in good standing with respect to or in full compliance with a plan to pay any and construction estimating, all child support payable under a support order as required for of the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such as labor, material, equipment, etcdate of this amendment.

Appears in 1 contract

Samples: Vermont Contract

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment This document consists of 2 pages. Except as modified by this Amendment No. 1, all provisions of the Contract remain in full force and effect. The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. STATE OF VERMONT MARBLE VALLEY ENGINEERINGVT ARCHITECTS COLLABORATIVE, P.C. INC. By: Name: Xxxxxxxxxxx Xxxx Title: BGS Commissioner Date: By: Name: Name: Title: Title: Date: Date: MASTER COPY DISTRIBUTED (Contractor, Accounting, Regional Director, Project Manager, DFM) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES (Revised 03/2018) THE XXXXX XX XXXXXXX XXXXXXXX XX. 00000 STATE OF VERMONT STANDARD FORM OF AGREEMENT BETWEEN STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made this 18th day of June in the year 2018. BETWEEN Agency of Administration Department of Buildings and General Services Two Governor Aiken Avenue Montpelier, Vermont 05633-5801 the State. Marble Valley EngineeringVermont Architects Collaborative, P.C. Inc. 00 Xxxxx Xxxxxx XxxxxxxXxxxxxxxx Xxx, Xxxxxxx 00000 Xxx X Xxxxxxxx, Vermont 05060 the ARCHITECT/ENGINEER. It is the intention of the State to utilize architectural and engineering services on a as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth below: The period of performance under this contract shall commence on June 18th, 2018 and end on June 18th, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying, and construction estimating, as required for the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such as labor, material, equipment, etc.

Appears in 1 contract

Samples: Vermont Contract

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment Contractor further certifies under pains and penalties of perjury that, as of the date that this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment. Cybersecurity Standard Update 2022-01: Contractor confirms that all products and services provided to or for the use of the State under this Agreement shall be in compliance with State of Vermont Cybersecurity Standard Update 2022-01, which prohibits the use of certain branded products in State information systems or any vendor system that is supporting State information systems, and is available on-line at: xxxxx://xxxxxxxxxxxxxxx.xxxxxxx.xxx/cybersecurity/cybersecurity-standards-and-directives. State and Federal Terms for Products and Services. Contractor agrees that “STATE OF VERMONT- FEDERAL TERMS SUPPLEMENT (Non-Construction) for all Contracts and Purchases of Products and Services Using Federal Funds (Revision date: July 28, 2022)” which is attached as Attachment G to this amendment, applies to any products or services provided to the State, at any time, when using federal funds. This document consists of 2 22 pages. Except as modified by this Amendment No. 1, 2 all provisions of the Contract remain in full force and effect. The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. WE THE UNDERSIGNED PARTIES AGREE TO BE BOUND BY THIS CONTRACT STATE OF VERMONT MARBLE VALLEY ENGINEERINGDepartment of Vermont Health Access CONTRACTOR Vermont Information Technology Leaders, P.C. ByInc. Xxxxxx De Xx Xxxxxx, Commissioner Date 000 Xxxxx Xxxxx NOB 1 South Waterbury, VT 05671 Phone: Name000-000-0000 Email: Xxxxxxxxxxx Xxxxxx.XxXxXxxxxx@xxxxxxx.xxx 12/28/2022 Xxxx TitleXxxxxxxx, President & CEO Date 0 Xxxx Xxxxxx, Xxxxx 000 BURLINGTON, VT 05401 PHONE: BGS Commissioner Date000-000-0000 Email: By: Name: Title: Date: MASTER COPY DISTRIBUTED (Contractor, Accounting, Regional Director, Project Manager, DFM) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES (Revised 03/2018) THE XXXXX XX XXXXXXX XXXXXXXX XX. 00000 STANDARD FORM OF AGREEMENT BETWEEN XXxxxxxxx@xxxx.xxx STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made VERMONT- FEDERAL TERMS SUPPLEMENT (Non-Construction) for all Contracts and Purchases of Products and Services Using Federal Funds (Revision date: July 28, 2022) PROCUREMENT OF RECOVERED MATERIALS In the performance of this 18th day contract, the Contractor shall make maximum use of June in products containing recovered materials that are EPA-designated Items unless the year 2018. BETWEEN Agency of Administration Department of Buildings and General Services Two Governor Aiken Avenue Montpelier, Vermont 05633-5801 the State. Marble Valley Engineering, P.C. 00 Xxxxx Xxxxxx Xxxxxxx, Xxxxxxx 00000 the ARCHITECT/ENGINEER. It is the intention of the State to utilize architectural and engineering services on a as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth below: The period of performance under this contract shall commence on June 18th, 2018 and end on June 18th, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may products cannot be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying, and construction estimating, as required for the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such as labor, material, equipment, etc.acquired-

Appears in 1 contract

Samples: State of Vermont Contract

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment This document consists of 2 pages. Except as modified by this Amendment No. 1, all provisions of the Contract remain in full force and effect. The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. STATE OF VERMONT MARBLE VALLEY ENGINEERINGCX ASSOCIATES, P.C. LLC. By: Name: Xxxxxxxxxxx Xxxx Title: BGS Commissioner Date: By: Name: Name: Title: Title: Date: Date: MASTER COPY DISTRIBUTED (Contractor, Accounting, Regional Director, Project Manager, DFM) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES (Revised 03/2018) THE XXXXX XX XXXXXXX XXXXXXXX XX. 00000 STATE OF VERMONT STANDARD FORM OF AGREEMENT BETWEEN STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made this 18th day of June in the year 2018. BETWEEN Agency of Administration Department of Buildings and General Services Two Governor Aiken Avenue Montpelier, Vermont 05633-5801 the State. Marble Valley EngineeringCX Associates, P.C. 00 Xxxxx LLC. 000 Xxxx Xxxxxx, Xxxxxx Xxxxxxx0X Xxxxxxxxxx, Xxxxxxx 00000 the ARCHITECT/ENGINEER. It is the intention of the State to utilize architectural and engineering services on a as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth below: The period of performance under this contract shall commence on June 18th18th , 2018 and end on June 18th, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying, and construction estimating, as required for the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such as labor, material, equipment, etc.

Appears in 1 contract

Samples: Vermont Contract

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment Cybersecurity Standard Update 2023-01: Contractor confirms that all products and services provided to or for the use of the State under this Agreement shall be in compliance with State of Vermont Cybersecurity Standard Update 2023-01, which prohibits the use of certain branded products in State information systems or any vendor system that is supporting State information systems, and is available on-line at: xxxxx://xxxxxxxxxxxxxxx.xxxxxxx.xxx/cybersecurity/cybersecurity- standards-and-directives . This document consists of 2 pages. Except as modified by this Amendment No. 12, all provisions of the Contract remain in full force and effect. The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. STATE OF VERMONT MARBLE VALLEY ENGINEERING, P.C. Versatile Communications Inc. By: Name: Xxxxxxxxxxx Xxxx Title: BGS Commissioner Date: By: Name: Name: Title: Title: Date: MASTER COPY DISTRIBUTED (Contractor, Accounting, Regional Director, Project Manager, DFM) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES (Revised 03/2018) THE XXXXX XX XXXXXXX XXXXXXXX XX. 00000 STANDARD FORM OF AGREEMENT BETWEEN Date: STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made this 18th day CONTRACT AMENDMENT It is hereby agreed by and between the State of June in the year 2018. BETWEEN Agency of Administration Vermont, Department of Buildings and General Services Two Governor Aiken Avenue MontpelierServices, Vermont 05633-5801 Office of Purchasing & Contracting (the "State. Marble Valley Engineering") and Versatile Inc with a principal place of business in Hudson, P.C. 00 Xxxxx Xxxxxx XxxxxxxMA (the "Contractor") that the contract between them originally dated as of June 1, Xxxxxxx 00000 the ARCHITECT/ENGINEER. It is the intention of the State to utilize architectural and engineering services on a as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth below: The period of performance under this contract shall commence on June 18th2020, 2018 and end on June 18th, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying, and construction estimatingContract # 39552, as required for amended to date, (the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such “Contract”) is hereby amended as labor, material, equipment, etc.follows:

Appears in 1 contract

Samples: Vermont Contract

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date that this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment. Cybersecurity Standard Update 2023-01. Contractor confirms that all products and services provided to or for the use of the State under this Agreement shall be in compliance with State of Vermont Cybersecurity Standard Update 2023-01, which prohibits the use of certain branded products in State information systems or any vendor system that is supporting State information systems, and is available on-line at: xxxxx://xxxxxxxxxxxxxxx.xxxxxxx.xxx/cybersecurity/cybersecurity-standards-and-directives. State and Federal Terms for Products and Services. Contractor agrees that “STATE OF VERMONT- FEDERAL TERMS SUPPLEMENT (Non-Construction) for all Contracts and Purchases of Products and Services Using Federal Funds (Revision date: July 28, 2022)” which is attached as Attachment G to this amendment, applies to any products or services provided to the State, at any time, when using federal funds. This document consists of 2 9 pages. Except as modified by this Amendment No. 1, 1 all provisions of the Contract remain in full force and effect. The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. WE THE UNDERSIGNED PARTIES AGREE TO BE BOUND BY THIS CONTRACT STATE OF VERMONT MARBLE VALLEY ENGINEERINGDepartment of Vermont Health Access CONTRACTOR NTT Data State Health Consulting, P.C. ByLLC Xxxxxx De Xx Xxxxxx, Commissioner Date 000 Xxxxx Xxxxx NOB 1 SOUTH WATERBURY, VT 05671 PHONE: Name000-000-0000 Email: Xxxxxxxxxxx Xxxx TitleXxxxxx.XxXxXxxxxx@xxxxxxx.xxx Xxxxx Xxxxxxxx, Senior Vice President Date 0000 Xxxxxx xxxxx, xxxxx 0000 PLANO, TX 75024 PHONE: BGS Commissioner Date000-000-0000 Email: By: Name: Title: Date: MASTER COPY DISTRIBUTED (Contractor, Accounting, Regional Director, Project Manager, DFM) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES (Revised 03/2018) THE XXXXX XX XXXXXXX XXXXXXXX XX. 00000 STANDARD FORM OF AGREEMENT BETWEEN Xxxxx.Xxxxxxxx@xxxxxxx.xxx ATTACHMENT G STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made VERMONT- FEDERAL TERMS SUPPLEMENT (Non-Construction) for all Contracts and Purchases of Products and Services Using Federal Funds (Revision date: July 28, 2022) PROCUREMENT OF RECOVERED MATERIALS In the performance of this 18th day contract, the Contractor shall make maximum use of June in products containing recovered materials that are EPA-designated Items unless the year 2018. BETWEEN Agency of Administration Department of Buildings and General Services Two Governor Aiken Avenue Montpelier, Vermont 05633-5801 the State. Marble Valley Engineering, P.C. 00 Xxxxx Xxxxxx Xxxxxxx, Xxxxxxx 00000 the ARCHITECT/ENGINEER. It is the intention of the State to utilize architectural and engineering services on a as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth below: The period of performance under this contract shall commence on June 18th, 2018 and end on June 18th, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may products cannot be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying, and construction estimating, as required for the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such as labor, material, equipment, etc.acquired-

Appears in 1 contract

Samples: dvha.vermont.gov

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment This document consists of 2 pages. Except as modified by this Amendment No. 1, all provisions of the Contract remain in full force and effect. The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. STATE OF VERMONT MARBLE VALLEY ENGINEERINGFREEMAN, P.C. FRENCH, XXXXXXX, INC. By: Name: Xxxxxxxxxxx Xxxx Title: BGS Commissioner Date: By: Name: Name: Title: Title: Date: Date: MASTER COPY DISTRIBUTED (Contractor, Accounting, Regional Director, Project Manager, DFM) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES (Revised 03/2018) THE XXXXX XX XXXXXXX XXXXXXXX XX. 00000 STATE OF VERMONT STANDARD FORM OF AGREEMENT BETWEEN STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made this 18th day of June in the year 2018. BETWEEN Agency of Administration Department of Buildings and General Services Two Governor Aiken Avenue Montpelier, Vermont 05633-5801 the State. Marble Valley EngineeringFreeman, P.C. French, Xxxxxxx, Inc. 00 Xxxxx Xxxxxx XxxxxxxXxxxxxxxxx, Xxxxxxx 00000 the ARCHITECT/ENGINEER. It is the intention of the State to utilize architectural and engineering services on a as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth below: The period of performance under this contract shall commence on June 18th, 2018 and end on June 18th, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying, and construction estimating, as required for the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such as labor, material, equipment, etc.not

Appears in 1 contract

Samples: Vermont Contract

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment Contract # 34359 This document consists of 2 pages. Except as modified by this Amendment No. 1, 1 all provisions of the Contract remain in full force and effect. The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. STATE OF VERMONT MARBLE VALLEY ENGINEERING, P.C. Dataman USA By: Name: Xxxxxxxxxxx Xxxx Title: BGS Commissioner Date: _Jennifer X.X. Xxxxx By: Name: Title: Commissioner - Buildings and General Services Title: Date: MASTER COPY DISTRIBUTED Date: Attachment F TEMPORARY WORK REQUEST (ContractorAdd sheets if needed, Accountinga detailed Statement of Work is required for technology procurements) Requestor: Phone #: Email: Department: Agency: # Staff Requested: TYPE OF SERVICE NEEDED (indicate with an "X" in the corrersponding box) a. Administrative Support (including Office and Clerical), Regional Directorwhich includes occupations in which workers are responsible for day to day operations such as internal and external communication, Project Managerrecording and retrieval of data and/or information and other paperwork required in an office. May include but is not limited to: bookkeepers, DFMmessengers, clerk‐typists, stenographers, court transcribers, hearing reporters, statistical clerks, dispatchers, license distributors, payroll clerks, office machine and computer operators, legalassistants, cashiers, and toll collectors. b. Commercial/Industrial Workers, which includes occupations in which workers perform jobs which require special manual skill and a thorough and comprehensive knowledge of the processes involved in the work which is acquired through on‐the‐job training and experience or through apprenticeship or other formal training programs. May include but is not limited to: mechanics and repairers, electricians, heavy equipment operators, stationary engineers, skilled machining occupations, carpenters, power plant operators, water and sewage treatment plant operators, service/maintenance. Workers in the following group may operate machinery: Chauffeurs, laundry and dry cleaning operatives, truck drivers, bus drivers, garage Laborers, custodial, gardeners and groundskeepers, refuse collectors, Construction laborers, park rangers (maintenance), farm workers (except managers), craft apprentices/ trainees/ c. Healthcare Staffing/Services, which includes Medical and Healthcare related service jobs including, but is not limited to, all classes of positions, the duties of which are to advise, administer, supervise, research or other professional and scientific work, technical work, or related clerical work in several branches of medicine, surgery, and dentistry or in related patient care services such as dietetics, nursing, occupational therapy, physical therapy, pharmacy, dietitians, doctors, psychologists, and registered nurses d. Information Technology Professional Services, which includes facilities management, database planning/design, systems analysis/ design, network services, programming, conversion & implementation support, network services, project management, data/records management. e. Professional, which includes occupations which require specialized and theoretical knowledge, usually acquired through college training or through work experience and be licensed or certified which provides comparable knowledge to college degree. May Include but is not limited to: personnel and labor relations workers, social workers, economists, lawyers, systems analysts, accountants, engineers, employment and vocational rehabilitation counselors, teachers, trainers or instructors, librarians, management analysts, surveyors and mapping scientists. Position Title: Hours Per Week: Work Shift Time Begin / End: Expected Start Date: Expected End Date: Physical Location of Work (include Room #): Min. Education LevelNeeded : Experience/Certification/Licensure/Required: Min. Yrs. of RelevantExperience: Duties: (Provide a general overview/summary of the essential functions/ responsibilities the position will perform) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES Critical Qualifications/ Skills: (Revised 03/2018Please consider and provide a description of the daily activities and indicate the critical qualifications for a successfulcandidate (i.e. customer service skills, multi‐‐tasking abilities, proficient with Excel etc.) THE XXXXX XX XXXXXXX XXXXXXXX XXYES / NO OTHER PERTINANT INFORMATION Computer hardware to be used: This position will have access to sensitive/confidential information or info. 00000 STANDARD FORM OF AGREEMENT BETWEEN systems. This position will directly work with children, vulnerable adults or in healthcare setting. This position will handle cash, checks, process payments or be involved in procurement. Computer software to be used: This position will require a current background check and/or drug testing. This position will require professional attire to be worn at the workplace. Primary Approver (Print): Sign: Date: Additional Approver (Print): Sign: Date: Additional Approver (Print): Sign: Date: AGO Certification required per 3 VSA Sec 342 for Work Requests ≥ $25,000: Sign: Date: Primary Contact Person (with knowledge of the position) : Phone #: Email: Agency: Dpartment: Dept. ID: Business Unit: Notes: Contract #34359 Amendment #7 STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made this 18th day CONTRACT AMENDMENT It is hereby agreed by and between the State of June in the year 2018. BETWEEN Agency of Administration Vermont, Department of Buildings and General Services Two Governor Aiken Avenue MontpelierServices, Vermont 05633-5801 Office of Purchasing & Contracting (the "State. Marble Valley Engineering") and Dataman, P.C. 00 Xxxxx Xxxxxx XxxxxxxUSA, Xxxxxxx 00000 with a principal place of business in Centennial, CO (the ARCHITECT/ENGINEER. It is "Contractor") that the intention contract between them originally dated as of the State to utilize architectural and engineering services on a as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth below: The period of performance under this contract shall commence on June 18thSeptember 1, 2018 and end on June 18th2017, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying, and construction estimatingContract # 34359, as required for amended to date, (the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such “Contract”) is hereby amended as labor, material, equipment, etc.follows:

Appears in 1 contract

Samples: Vermont Contract

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment State and Federal Terms for Products and Services related the 2020 Covid-19 Pandemic. Contractor agrees that “STATE OF VERMONT- FEDERAL TERMS SUPPLEMENT (Non- Construction) for all Contracts and Purchases of Products and Services Connected with 2020 Pandemic,” which is attached as Attachment to this amendment, applies to any products or services provided to the State, at any time, in connection with the 2020 Pandemic. This document consists of 2 pages. Except as modified by this Amendment No. 15, all provisions of the Contract remain in full force and effect. Revision Date: 05/30/2019 The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. STATE OF VERMONT MARBLE VALLEY ENGINEERING, P.C. ATD American Co By: Name: Xxxxxxxxxxx Xxxx Title: BGS Commissioner Date: By: Name: Name: Title: Title: Date: MASTER COPY DISTRIBUTED (Contractor, Accounting, Regional Director, Project Manager, DFM) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES (Revised 03/2018) THE XXXXX XX XXXXXXX XXXXXXXX XX. 00000 STANDARD FORM OF AGREEMENT BETWEEN Date: Revision Date: 05/30/2019 Attachment D STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made VERMONT- FEDERAL TERMS SUPPLEMENT (Non-Construction) for all Contracts and Purchases1 of Products and Services Connected with 2020 Pandemic XXXX ANTI-LOBBYING AMENDMENT Contractors who apply or bid for an award of $100,000 or more certify that each tier certifies to the tier above that it will not and has not used Federal appropriated funds to pay any person or organization for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, officer or employee of Congress, or an employee of a Member of Congress in connection with obtaining any Federal contract, grant, or any other award covered by 31 U.S.C. § 1352. Each tier shall also disclose any lobbying with non-Federal funds that takes place in connection with obtaining any Federal award. Such disclosures are forwarded from tier to tier, up to the recipient who in turn will forward the certification(s) to the awarding agency PROCUREMENT OF RECOVERED MATERIALS In the performance of this 18th day contract, the Contractor shall make maximum use of June in products containing recovered materials that are EPA-designated Items unless the year 2018. BETWEEN Agency of Administration Department of Buildings and General Services Two Governor Aiken Avenue Montpelier, Vermont 05633-5801 the State. Marble Valley Engineering, P.C. 00 Xxxxx Xxxxxx Xxxxxxx, Xxxxxxx 00000 the ARCHITECT/ENGINEER. It is the intention of the State to utilize architectural and engineering services on a as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth below: The period of performance under this contract shall commence on June 18th, 2018 and end on June 18th, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may products cannot be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying, and construction estimating, as required for the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such as labor, material, equipment, etc.acquired-

Appears in 1 contract

Samples: Vermont Contract

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date that this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment. State and Federal Terms for Products and Services. Contractor agrees that “STATE OF VERMONT- FEDERAL TERMS SUPPLEMENT (Non-Construction) for all Contracts and Purchases of Products and Services Using Federal Funds (Revision date: July 28, 2022)” which is attached as Attachment G to this amendment, applies to any products or services provided to the State, at any time, when using federal funds. Cybersecurity Standard Update 2023-01: Contractor confirms that all products and services provided to or for the use of the State under this Agreement shall be in compliance with State of Vermont Cybersecurity Standard Update 2023-01, which prohibits the use of certain branded products in State information systems or any vendor system that is supporting State information systems, and is available on-line at: xxxxx://xxxxxxxxxxxxxxx.xxxxxxx.xxx/cybersecurity/cybersecurity-standards-and-directives. This document consists of 2 6 pages. Except as modified by this Amendment No. 1, 2 all provisions of the Contract remain in full force and effect. The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. WE THE UNDERSIGNED PARTIES AGREE TO BE BOUND BY THIS CONTRACT STATE OF VERMONT MARBLE VALLEY ENGINEERINGDepartment of Vermont Health Access 11/28/2023 CONTRACTOR Public Consulting Group, P.C. ByLLC 11/13/2023 Xxxxxx De Xx Xxxxxx, Commissioner Date Xxxx Xxxxxxxx Date 000 Xxxxx Xxxxx Practice Area Director XXX 0 Xxxxx 000 Xxxxxxxx Xxxxxx, Xxxxx 0000 XXXXXXXXX, XX 00000 XXXXXX, XXXXX 00000 XXXXX: Name000-000-0000 PHONE: Xxxxxxxxxxx Xxxx Title000-000-0000 Email: BGS Commissioner DateXxxxxx.XxXxXxxxxx@xxxxxxx.xxx Email: By: Name: Title: Date: MASTER COPY DISTRIBUTED (Contractor, Accounting, Regional Director, Project Manager, DFM) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES (Revised 03/2018) THE XXXXX XX XXXXXXX XXXXXXXX XX. 00000 STANDARD FORM OF AGREEMENT BETWEEN xxxxxxxxx@xxxxx.xxx ATTACHMENT G STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made VERMONT- FEDERAL TERMS SUPPLEMENT (Non-Construction) (Revision date: July 19, 2023) PROCUREMENT OF RECOVERED MATERIALS In the performance of this 18th day contract, the Contractor shall make maximum use of June in products containing recovered materials that are EPA-designated Items unless the year 2018. BETWEEN Agency of Administration Department of Buildings and General Services Two Governor Aiken Avenue Montpelier, Vermont 05633-5801 the State. Marble Valley Engineering, P.C. 00 Xxxxx Xxxxxx Xxxxxxx, Xxxxxxx 00000 the ARCHITECT/ENGINEER. It is the intention of the State to utilize architectural and engineering services on a as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth below: The period of performance under this contract shall commence on June 18th, 2018 and end on June 18th, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may products cannot be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying, and construction estimating, as required for the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such as labor, material, equipment, etc.acquired-

Appears in 1 contract

Samples: State of Vermont Contract

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment State and Federal Terms for Products and Services related the 2020 Covid-19 Pandemic. Contractor agrees that “STATE OF VERMONT- FEDERAL TERMS SUPPLEMENT (Non- Construction) for all Contracts and Purchases of Products and Services Connected with 2020 Pandemic,” which is attached as Attachment H to this amendment, applies to any products or services provided to the State, at any time, in connection with the 2020 Pandemic. This document consists of 2 5 pages. Except as modified by this Amendment No. 12, all provisions of the Contract remain in full force and effect. The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. STATE OF VERMONT MARBLE VALLEY ENGINEERING, P.C. XXXXXXX CONSTRUCTION CO By: Name: Xxxxxxxxxxx Xxxx Title: BGS Commissioner Date: By: Name: Xxxxxxxx Xxxxx Name: Title:Acting Commissioner - Buildings and General Services Date: Title: Date: MASTER COPY DISTRIBUTED (Contractor, Accounting, Regional Director, Project Manager, DFM) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES (Revised 03/2018) THE XXXXX XX XXXXXXX XXXXXXXX XX. 00000 STANDARD FORM OF AGREEMENT BETWEEN STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made VERMONT- FEDERAL TERMS SUPPLEMENT (Non-Construction) for all Contracts and Purchases1‌ of Products and Services Connected with 2020 Pandemic XXXX ANTI-LOBBYING AMENDMENT Contractors who apply or bid for an award of $100,000 or more certify that each tier certifies to the tier above that it will not and has not used Federal appropriated funds to pay any person or organization for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, officer or employee of Congress, or an employee of a Member of Congress in connection with obtaining any Federal contract, grant, or any other award covered by 31 U.S.C. § 1352. Each tier shall also disclose any lobbying with non-Federal funds that takes place in connection with obtaining any Federal award. Such disclosures are forwarded from tier to tier, up to the recipient who in turn will forward the certification(s) to the awarding agency PROCUREMENT OF RECOVERED MATERIALS In the performance of this 18th day contract, the Contractor shall make maximum use of June in products containing recovered materials that are EPA-designated Items unless the year 2018. BETWEEN Agency of Administration Department of Buildings and General Services Two Governor Aiken Avenue Montpelier, Vermont 05633-5801 the State. Marble Valley Engineering, P.C. 00 Xxxxx Xxxxxx Xxxxxxx, Xxxxxxx 00000 the ARCHITECT/ENGINEER. It is the intention of the State to utilize architectural and engineering services on a as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth below: The period of performance under this contract shall commence on June 18th, 2018 and end on June 18th, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may products cannot be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying, and construction estimating, as required for the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such as labor, material, equipment, etc.acquired-

Appears in 1 contract

Samples: Vermont Contract

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment SOV Cybersecurity Standard 19-01. All products and service provided to or for the use of the State under this Contract shall be in compliance with State of Vermont Cybersecurity Standard 19-01, which Contractor acknowledges has been provided to it, and is available on-line at the following URL:xxxxx://xxxxxxxxxxxxxxx.xxxxxxx.xxx/cybersecurity/cybersecurity-standards-and- directives This document consists of 2 pages. Except as modified by this Amendment No. 14, all provisions of the Contract remain in full force and effect. Revision Date: 05/30/2019 Contract #30123 The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. STATE OF VERMONT MARBLE VALLEY ENGINEERING, P.C. PANASONIC SYSTEM COMMUNICATIONS COMPANY NORTH AMERICA By: Name: Xxxxxxxxxxx Xxxx Title: BGS Commissioner Date: By: Name: Xxxxxxxx Xxxxx Name: Commissioner - Buildings and Title: General Services Date: Title: Date: MASTER COPY DISTRIBUTED (Contractor, Accounting, Regional Director, Project Manager, DFM) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES (Revised 03/2018) THE XXXXX XX XXXXXXX XXXXXXXX XX. 00000 STANDARD FORM OF AGREEMENT BETWEEN Revision Date: 05/30/2019 Contract #30123 Amendment #3 STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made this 18th day CONTRACT AMENDMENT It is hereby agreed by and between the State of June in the year 2018. BETWEEN Agency of Administration Vermont, Department of Buildings and General Services Two Governor Aiken Avenue MontpelierServices, Vermont 05633-5801 Office of Purchasing and Contracting. (the "State. Marble Valley Engineering") and Panasonic System Communications Company of North America a principal place of business in Newark, P.C. 00 Xxxxx Xxxxxx XxxxxxxNJ, Xxxxxxx 00000 (the ARCHITECT/ENGINEER. It is "Contractor") that the intention contract between them originally dated as of the State to utilize architectural and engineering services on a as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth below: The period of performance under this contract shall commence on June 18thOctober 1, 2018 and end on June 18th2015, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying, and construction estimatingContract #30123, as required for amended to date, (the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such “Contract”) is hereby amended as labor, material, equipment, etc.follows:

Appears in 1 contract

Samples: Vermont Contract

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment Contractor further certifies under pains and penalties of perjury that, as of the date that this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment. Cybersecurity Standard Update 2023-01: Contractor confirms that all products and services provided to or for the use of the State under this Agreement shall be in compliance with State of Vermont Cybersecurity Standard Update 2023-01, which prohibits the use of certain branded products in State information systems or any vendor system that is supporting State information systems, and is available on-line at: xxxxx://xxxxxxxxxxxxxxx.xxxxxxx.xxx/cybersecurity/cybersecurity-standards-and-directives. State and Federal Terms for Products and Services. Contractor agrees that “STATE OF VERMONT- FEDERAL TERMS SUPPLEMENT (Non-Construction) for all Contracts and Purchases of Products and Services Using Federal Funds (Revision date: July 28, 2022)” which is attached as Attachment G to this Contract, applies to any products or services provided to the State, at any time, when using federal funds. This document consists of 2 7 pages. Except as modified by this Amendment No. 1, 3 all provisions of the Contract remain in full force and effect. The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. WE THE UNDERSIGNED PARTIES AGREE TO BE BOUND BY THIS CONTRACT STATE OF VERMONT MARBLE VALLEY ENGINEERING, P.C. By: Name: Xxxxxxxxxxx Xxxx Title: BGS Commissioner Date: By: Name: Title: Date: MASTER COPY DISTRIBUTED (Contractor, Accounting, Regional Director, Project Manager, DFM) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES (Revised 03/2018) THE XXXXX XX XXXXXXX XXXXXXXX XX. 00000 STANDARD FORM OF AGREEMENT BETWEEN STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made this 18th day of June in the year 2018. BETWEEN Agency of Administration Department of Buildings and General Services Two Governor Aiken Avenue MontpelierVermont Health Access CONTRACTOR Vermont Information Technology Leaders, Vermont 05633Inc. Xxxxxx De Xx Xxxxxx, Commissioner Date 000 Xxxxx Xxxxx NOB 1 SOUTH WATERBURY, VT 05671 PHONE: 000-5801 the State. Marble Valley Engineering000-0000 Email: Xxxxxx.XxXxXxxxxx@xxxxxxx.xxx 4/26/2023 Xxxx Xxxxxxxx, P.C. 00 President & CEO Date 0 Xxxx Xxxxxx, Xxxxx Xxxxxx Xxxxxxx000 BURLINGTON, Xxxxxxx 00000 the ARCHITECT/ENGINEER. It is the intention of the State to utilize architectural and engineering services on a as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth belowVT 05401 PHONE: The period of performance under this contract shall commence on June 18th, 2018 and end on June 18th, 2020 with an option to renew for two additional one000-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying, and construction estimating, as required for the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such as labor, material, equipment, etc.000-0000

Appears in 1 contract

Samples: State of Vermont Contract

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment This document consists of 2 3 pages. Except as modified by this Amendment No. 13, all provisions of the Contract remain in full force and effect. The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. STATE OF VERMONT MARBLE VALLEY ENGINEERING, P.C. T-S ENVELOPE LLC d/b/a TRI-STATE ENVELOPE By: Name: Xxxxxxxxxxx Xxxx Title: BGS Commissioner Date: By: Name: Name: Title: Title: Date: MASTER COPY DISTRIBUTED Date: ATTACHMENT C: STANDARD STATE PROVISIONS FOR CONTRACTS AND GRANTS Revised December 7, 2023 “Attachment C: Standard State Provisions for Contracts and Grants” (Contractorrevision version dated December 7, Accounting, Regional Director, Project Manager, DFM2023) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES (Revised 03/2018) THE XXXXX XX XXXXXXX XXXXXXXX XXconstitutes part of this Agreement and is hereby incorporated by reference as if fully set forth herein and shall apply to the purchase of all goods and/or services by the State under this Agreement. 00000 STANDARD FORM OF AGREEMENT BETWEEN A copy of this document is available online at: xxxxx://xxx.xxxxxxx.xxx/purchasing- contracting/forms. STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made this 18th day CONTRACT AMENDMENT It is hereby agreed by and between the State of June in the year 2018. BETWEEN Agency of Administration Vermont, Department of Buildings and General Services Two Governor Aiken Avenue Montpelier(the "State") and T-S Envelope LLC d/b/a Tri-State Envelope, Vermont 05633-5801 with a principal place of business in Ashland, PA (the State. Marble Valley Engineering"Contractor") that the contract between them originally dated as of April 1, P.C. 00 Xxxxx Xxxxxx Xxxxxxx, Xxxxxxx 00000 the ARCHITECT/ENGINEER. It is the intention of the State to utilize architectural and engineering services on a as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth below: The period of performance under this contract shall commence on June 18th, 2018 and end on June 18th, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying, and construction estimating2021 Contract # 43937, as required for amended to date, (the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such “Contract”) is hereby amended as labor, material, equipment, etc.follows:

Appears in 1 contract

Samples: Vermont Contract

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment This document consists of 2 pages. Except as modified by this Amendment No. 1, all provisions of the Contract remain in full force and effect. The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. STATE OF VERMONT MARBLE VALLEY ENGINEERINGVT ARCHITECTS COLLABORATIVE, P.C. INC. By: Name: Xxxxxxxxxxx Xxxx Title: BGS Commissioner Date: By: Name: Name: Title: Title: Date: Date: MASTER COPY DISTRIBUTED (Contractor, Accounting, Regional Director, Project Manager, DFM) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES (Revised 03/2018) THE XXXXX XX XXXXXXX XXXXXXXX XX. 00000 STATE OF VERMONT STANDARD FORM OF AGREEMENT BETWEEN STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made this 18th day of June in the year 2018. BETWEEN Agency of Administration Department of Buildings and General Services Two Governor Aiken Avenue Montpelier, Vermont 05633-5801 the State. Marble Valley EngineeringVermont Architects Collaborative, P.C. Inc. 00 Xxxxx Xxxxxx XxxxxxxXxxxxxxxx Xxx, Xxx X Xxxxxxxx, Xxxxxxx 00000 the ARCHITECT/ENGINEER. It is the intention of the State to utilize architectural and engineering services on a as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth below: The period of performance under this contract shall commence on June 18th, 2018 and end on June 18th, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying, and construction estimating, as required for the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such as labor, material, equipment, etc.

Appears in 1 contract

Samples: Vermont Contract

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment This document consists of 2 pages. Except as modified by this Amendment No. 1, all provisions of the Contract remain in full force and effect. Revision Date: 12/12/2018 Contract #39383 Amendment #1 The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. STATE OF VERMONT MARBLE VALLEY ENGINEERINGRENTOKIL N.A., P.C. INC. dba XXXXXXX By: Name: Xxxxxxxxxxx Xxxx Title: BGS Commissioner Date: By: Name: Name: Title: Title: Date: MASTER COPY DISTRIBUTED (Contractor, Accounting, Regional Director, Project Manager, DFM) Date: Revision Date: 12/12/2018 Contract # 33937 Amendment # 2 STATE OF VERMONT DEPARTMENT OF BUILDINGS AND & GENERAL SERVICES (Revised 03/2018) THE XXXXX XX XXXXXXX XXXXXXXX XX. 00000 STANDARD FORM OF AGREEMENT BETWEEN STATE OF VERMONT OR ANY AGENCY THEREOF NOVATION AND ARCHITECT/ENGINEER AGREEMENT made this 18th day AMENDMENT It is hereby agreed by and among the State of June in the year 2018. BETWEEN Agency of Administration Vermont, Department of Buildings and & General Services Two Governor Aiken Avenue Montpelier(hereinafter called "State"), Vermont 05633-5801 the State. Marble Valley EngineeringL/R Pest Elimination Services, P.C. 00 Xxxxx Xxxxxx Inc., a corporation with a principal place of business in Essex Junction, VT (hereinafter called “L/R Pest”) and Rentokil North American, Inc. dba Xxxxxxx, Xxxxxxx 00000 a corporation with a principal place of business in Reading, PA (hereinafter called "Contractor”), that the ARCHITECT/ENGINEER. It is the intention Contractor intends to assume all of the State to utilize architectural rights, benefits, duties and engineering services on a as needed basis. The obligations of L/R Pest under the Contract between the State and L/R Pest dated as of June 1, 2017, Contract # 33937, as amended to date (the ARCHITECT/ENGINEER agree as set forth below: The period of performance under this contract shall commence on June 18th, 2018 and end on June 18th, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying“Contract”), and construction estimating, that the Contract is hereby amended as required for the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such as labor, material, equipment, etc.follows:

Appears in 1 contract

Samples: Vermont Contract

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment This document consists of 2 pages. Except as modified by this Amendment No. 1, all provisions of the Contract remain in full force and effect. The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. STATE OF VERMONT MARBLE VALLEY ENGINEERING, P.C. GOLDSTONE ARCHITECTURE PLLC By: Name: Xxxxxxxxxxx Xxxx Title: BGS Commissioner Date: By: Name: Name: Title: Title: Date: Date: MASTER COPY DISTRIBUTED (Contractor, Accounting, Regional Director, Project Manager, DFM) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES (Revised 03/2018) THE XXXXX XX XXXXXXX XXXXXXXX XX. 00000 STATE OF VERMONT STANDARD FORM OF AGREEMENT BETWEEN STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made this 18th day of June in the year 2018. BETWEEN Agency of Administration Department of Buildings and General Services Two Governor Aiken Avenue Montpelier, Vermont 05633-5801 the State. Marble Valley EngineeringGoldstone Architecture PLLC 000 Xxxxx Xxxxxx, P.C. 00 Xxxxx Xxxxxx XxxxxxxXX Xxx 000 Xxxxxxxxxx, Xxxxxxx 00000 the ARCHITECT/ENGINEER. It is the intention of the State to utilize architectural and engineering services on a as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth below: The period of performance under this contract shall commence on June 18th, 2018 and end on June 18th, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying, and construction estimating, as required for the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such as labor, material, equipment, etc.not

Appears in 1 contract

Samples: Vermont Contract

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date that this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment. Cybersecurity Standard Update 2022-01: Contractor confirms that all products and services provided to or for the use of the State under this Agreement shall be in compliance with State of Vermont Cybersecurity Standard Update 2022-01, which prohibits the use of certain branded products in State information systems or any vendor system that is supporting State information systems, and is available on-line at: xxxxx://xxxxxxxxxxxxxxx.xxxxxxx.xxx/cybersecurity/cybersecurity-standards-and-directives. State and Federal Terms for Products and Services. Contractor agrees that “STATE OF VERMONT- FEDERAL TERMS SUPPLEMENT (Non-Construction) for all Contracts and Purchases of Products and Services Using Federal Funds (Revision date: July 28, 2022)” which is attached as Attachment G to this amendment, applies to any products or services provided to the State, at any time, when using federal funds. This document consists of 2 10 pages. Except as modified by this Amendment No. 1, 1 all provisions of the Contract remain in full force and effect. The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. WE THE UNDERSIGNED PARTIES AGREE TO BE BOUND BY THIS CONTRACT STATE OF VERMONT MARBLE VALLEY ENGINEERINGDepartment of Vermont Health Access CONTRACTOR Briljent, P.C. ByLLC 12/1/2022 Xxxxxx De Xx Xxxxxx, Commissioner Date 000 Xxxxx Xxxxx XXX 0 XXXXX XXXXXXXXX, XX 00000 PHONE: Name000-000-0000 Email: Xxxxxxxxxxx Xxxx TitleXxxxxx.XxXxXxxxxx@xxxxxxx.xxx 12/1/2022 Xxxxxxx X. Xxxx, President Date 0000 X. Xxxxxxxxx Xxxx. FORT XXXXX, IN 46804 PHONE: BGS Commissioner Date000-000-0000 Email: By: Name: Title: Date: MASTER COPY DISTRIBUTED (Contractor, Accounting, Regional Director, Project Manager, DFM) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES (Revised 03/2018) THE XXXXX XX XXXXXXX XXXXXXXX XX. 00000 STANDARD FORM OF AGREEMENT BETWEEN Xxxxx@Xxxxxxxx.xxx STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made VERMONT- FEDERAL TERMS SUPPLEMENT (Non-Construction) for all Contracts and Purchases of Products and Services Using Federal Funds (Revision date: July 28, 2022) PROCUREMENT OF RECOVERED MATERIALS In the performance of this 18th day contract, the Contractor shall make maximum use of June in products containing recovered materials that are EPA-designated Items unless the year 2018. BETWEEN Agency of Administration Department of Buildings and General Services Two Governor Aiken Avenue Montpelier, Vermont 05633-5801 the State. Marble Valley Engineering, P.C. 00 Xxxxx Xxxxxx Xxxxxxx, Xxxxxxx 00000 the ARCHITECT/ENGINEER. It is the intention of the State to utilize architectural and engineering services on a as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth below: The period of performance under this contract shall commence on June 18th, 2018 and end on June 18th, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may products cannot be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying, and construction estimating, as required for the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such as labor, material, equipment, etc.acquired-

Appears in 1 contract

Samples: State of Vermont Contract

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment This document consists of 2 pages. Except as modified by this Amendment No. 1, all provisions of the Contract remain in full force and effect. The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. STATE OF VERMONT MARBLE VALLEY ENGINEERING, P.C. XXXXXXX ENGINEERING ASSOCIATES By: Name: Xxxxxxxxxxx Xxxx Title: BGS Commissioner Date: By: Name: Name: Title: Title: Date: Date: MASTER COPY DISTRIBUTED (Contractor, Accounting, Regional Director, Project Manager, DFM) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES (Revised 03/2018) THE XXXXX XX XXXXXXX XXXXXXXX XX. 00000 STATE OF VERMONT STANDARD FORM OF AGREEMENT BETWEEN STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made this 18th day of June in the year 2018. BETWEEN Agency of Administration Department of Buildings and General Services Two Governor Aiken Avenue Montpelier, Vermont 05633-5801 the State. Marble Valley EngineeringXxXxxxx Engineering Associates, P.C. 00 000 Xxxxx Xxxxxx XxxxxxxXxxxxxxxxx, Xxxxxxx 00000 00000-0000 the ARCHITECT/ENGINEER. It is the intention of the State to utilize architectural and engineering services on a as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth below: The period of performance under this contract shall commence on June 18th, 2018 and end on June 18th, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying, and construction estimating, as required for the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such as labor, material, equipment, etc.not

Appears in 1 contract

Samples: Vermont Contract

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment SOV Cybersecurity Standard 19-01. All products and service provided to or for the use of the State under this Contract shall be in compliance with State of Vermont Cybersecurity Standard 19-01, which Contractor acknowledges has been provided to it, and is available on-line at the following URL:xxxxx://xxxxxxxxxxxxxxx.xxxxxxx.xxx/cybersecurity/cybersecurity-standards-and- directives This document consists of 2 pages. Except as modified by this Amendment No. 13, all provisions of the Contract remain in full force and effect. The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. STATE OF VERMONT MARBLE VALLEY ENGINEERING, P.C. ATRION NETWORKING CORP By: Name: Xxxxxxxxxxx Xxxx Title: BGS Commissioner Date: By: Name: Name: Title: Title: Date: MASTER COPY DISTRIBUTED (Contractor, Accounting, Regional Director, Project Manager, DFM) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES (Revised 03/2018) THE XXXXX XX XXXXXXX XXXXXXXX XX. 00000 STANDARD FORM OF AGREEMENT BETWEEN Date: STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made this 18th day CONTRACT AMENDMENT It is hereby agreed by and between the State of June in the year 2018. BETWEEN Agency of Administration Vermont, Department of Buildings and General Services Two Governor Aiken Avenue MontpelierServices, Vermont 05633-5801 Office of Purchasing & Contracting the "State. Marble Valley Engineering") and Atrion Networking Corp, P.C. 00 Xxxxx Xxxxxx Xxxxxxxwith a principal place of business in Warwick, Xxxxxxx 00000 RI (the ARCHITECT/ENGINEER. It is "Contractor") that the intention contract between them originally dated as of the State to utilize architectural and engineering services on a as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth below: The period of performance under this contract shall commence on June 18thSeptember 15, 2018 and end on June 18th2019, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying, and construction estimatingContract # 30069, as required for amended to date, (the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such “Contract”) is hereby amended as labor, material, equipment, etc.follows:

Appears in 1 contract

Samples: Vermont Contract

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment This document consists of 2 4 pages. Except as modified by this Amendment No. 1, all provisions of the Contract remain in full force and effect. The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. STATE OF VERMONT MARBLE VALLEY ENGINEERINGCOMPLETE SEPTIC SERVICE, P.C. LLC. By: Name: Xxxxxxxxxxx Xxxx Title: BGS Commissioner Date: By: Name: Name: Title: Title: Date: MASTER COPY DISTRIBUTED (Contractor, Accounting, Regional Director, Project Manager, DFM) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES (Revised 03/2018) THE XXXXX XX XXXXXXX XXXXXXXX XX. 00000 STANDARD FORM OF AGREEMENT BETWEEN Date: STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made VERMONT- FEDERAL TERMS SUPPLEMENT (Non-Construction) for all Contracts and Purchases1‌ of Products and Services Connected with 2020 Pandemic XXXX ANTI-LOBBYING AMENDMENT Contractors who apply or bid for an award of $100,000 or more certify that each tier certifies to the tier above that it will not and has not used Federal appropriated funds to pay any person or organization for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, officer or employee of Congress, or an employee of a Member of Congress in connection with obtaining any Federal contract, grant, or any other award covered by 31 U.S.C. § 1352. Each tier shall also disclose any lobbying with non-Federal funds that takes place in connection with obtaining any Federal award. Such disclosures are forwarded from tier to tier, up to the recipient who in turn will forward the certification(s) to the awarding agency PROCUREMENT OF RECOVERED MATERIALS In the performance of this 18th day contract, the Contractor shall make maximum use of June in products containing recovered materials that are EPA-designated Items unless the year 2018. BETWEEN Agency of Administration Department of Buildings and General Services Two Governor Aiken Avenue Montpelier, Vermont 05633-5801 the State. Marble Valley Engineering, P.C. 00 Xxxxx Xxxxxx Xxxxxxx, Xxxxxxx 00000 the ARCHITECT/ENGINEER. It is the intention of the State to utilize architectural and engineering services on a as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth below: The period of performance under this contract shall commence on June 18th, 2018 and end on June 18th, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may products cannot be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying, and construction estimating, as required for the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such as labor, material, equipment, etc.acquired-

Appears in 1 contract

Samples: Vermont Contract

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s 's principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s 's debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment This document consists of 2 pages. Except as modified by this Amendment Change Order No. 1, all provisions of the Contract remain in full force and effect. State of Vermont Buildings and General Services Office of Purchasing & Contracting 000 Xxxxx Xx Xxxxxxxxxx XX 00000-0000 XXXXXXXX Xxxxxx Xxxxxx Contract ID 0000000000000000000039199 Page 2 of 2 Supplier 0000051429 The signatures Hertz Corporation Contract Dates 10/17/2019 to 10/18/2021 Origin CPS XX Xxx 00000 Xxxxxxxx Xxxx XX 00000 Description: CPS - Rental Vehicles Contract Maximum $1,000.00 United States Buyer Name Xxxxxxx X Xxxxxx Xx. Buyer Phone828-4681 Contract Status Approved Phone #: (000) 000-0000 Line # Item ID Item Desc UOM Unit Price Max Qty Max Amt WE THE UNDERSIGNED PARTIES AGREE TO BE BOUND BY THIS CONTRACT By the STATE of VERMONT By the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. STATE OF VERMONT MARBLE VALLEY ENGINEERING, P.C. ByCONTRACTOR Date: Signature: Name: Xxxxxxxxxxx Xxxx Title: BGS Commissioner Date: BySignature: Name: Title: DateEmail: MASTER COPY DISTRIBUTED (Contractor, Accounting, Regional Director, Project Manager, DFM) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES (Revised 03/2018) THE XXXXX XX XXXXXXX XXXXXXXX XX. 00000 STANDARD FORM OF AGREEMENT BETWEEN Title: Email: STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made this 18th day of June in the year 2018. BETWEEN Agency of Administration Department of Buildings and General Services Two Governor Aiken Avenue Montpelier, Vermont 05633-5801 the State. Marble Valley Engineering, P.C. 00 Xxxxx Xxxxxx Xxxxxxx, Xxxxxxx 00000 the ARCHITECT/ENGINEER. It is the intention of PARTICIPATING ADDENDUM # 39199 FOR NASPO VALUEPOINT PURCHASING PROGRAM: Nationwide Vehicle Rentals Led by the State to utilize architectural and engineering services on a as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth belowof Oregon Master Agreement #9409 Contractor: The period of performance under this contract shall commence on June 18th, 2018 and end on June 18th, 2020 with an option to renew for two additional oneHertz Corporation Contractor’s NASPO ValuePoint Webpage: xxxxx://xxx.xxxxxxxxxxxxxxx.xxx/portfolio/travel-nationwide- vehicle-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may be utilized for design of new construction and renovation projects, including any and all phases from feasibilityrentals-2019-2025/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying, and construction estimating, as required for the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such as labor, material, equipment, etc.hertz/

Appears in 1 contract

Samples: Vermont Contract

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s 's principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s 's debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment This document consists of 2 pages. Except as modified by this Amendment No. 13 , all provisions of the Contract remain in full force and effect. The signatures WE THE UNDERSIGNED PARTIES AGREE TO BE BOUND BY THIS CONTRACT By the STATE of VERMONT By the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. STATE OF VERMONT MARBLE VALLEY ENGINEERING, P.C. By: Name: Xxxxxxxxxxx Xxxx Title: BGS Commissioner CONTRACTOR Date: BySignature: Date: Signature: Name: Title: Date: MASTER COPY DISTRIBUTED (Contractor, Accounting, Regional Director, Project Manager, DFM) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES (Revised 03/2018) THE XXXXX XX XXXXXXX XXXXXXXX XX. 00000 STANDARD FORM OF AGREEMENT BETWEEN STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made this 18th day of June in the year 2018. BETWEEN Agency of Administration Department of Xxxxxxxx Xxxxx Commissioner - Buildings and General Services Two Governor Aiken Avenue MontpelierName: Title: Email: Email: STATE OF VERMONT CONTRACT AMENDMENT It is hereby agreed by and between the State of Vermont, Vermont 05633Office of Purchasing and Contracting (the "State") and The Hertz Corporation, with a principal place of business in Estero FL (the "Contractor") that the contract between them originally dated as of October 19, 2019, Contract # 39199, as amended to date, (the “Contract”) is hereby amended as follows: I. Attachment D: STATE OF VERMONT- FEDERAL TERMS SUPPLEMENT (Non- Construction). Attachment D: STATE OF VERMONT- FEDERAL TERMS SUPPLEMENT (Non-5801 Construction) is herby incorporated in its entirety into contract # 36199. Taxes Due to the State. Marble Valley EngineeringContractor certifies under the pains and penalties of perjury that, P.C. 00 Xxxxx Xxxxxx Xxxxxxx, Xxxxxxx 00000 the ARCHITECT/ENGINEER. It is the intention as of the State to utilize architectural and engineering services on a as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth below: The period of performance under date this contract shall commence on June 18thamendment is signed, 2018 and end on June 18ththe Contractor is in good standing with respect to, 2020 or in full compliance with an option a plan to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may be utilized for design of new construction and renovation projectspay, including any and all phases from feasibility/programming through construction administrationtaxes due the State of Vermont. Child Support (Applicable to natural persons only; including but not limited applicable to code analysiscorporations, studies, permitting, CAD drafting, surveying, partnerships or LLCs). Contractor is under no obligation to pay child support or is in good standing with respect to or in full compliance with a plan to pay any and construction estimating, all child support payable under a support order as required for of the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such as labor, material, equipment, etcdate of this amendment.

Appears in 1 contract

Samples: Rental Agreement Terms and Conditions

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment This document consists of 2 pages. Except as modified by this Amendment No. 1, all provisions of the Contract remain in full force and effect. The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. STATE OF VERMONT MARBLE VALLEY ENGINEERINGXXXXXXX XXXXXXXX ARCHITECTS, P.C. INC. By: Name: Xxxxxxxxxxx Xxxx Title: BGS Commissioner Date: By: Name: Name: Title: Title: Date: Date: MASTER COPY DISTRIBUTED (Contractor, Accounting, Regional Director, Project Manager, DFM) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES (Revised 03/2018) THE XXXXX XX XXXXXXX XXXXXXXX XX. 00000 STANDARD FORM OF AGREEMENT BETWEEN STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made this 18th day of June in the year 2018. BETWEEN Agency of Administration Department of Buildings and General Services Two Governor Aiken Avenue Montpelier, Vermont 05633-5801 the State. Marble Valley EngineeringXxxxxxx Xxxxxxxx Architects, P.C. Inc. 00 Xxxxx Xxxxxx XxxxxxxXxxxxxxx Xxxxx, Xxxxxxx 00000 the ARCHITECT/ENGINEERXxx. It is the intention of the State to utilize architectural and engineering services on a as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth below: The period of performance under this contract shall commence on June 18th, 2018 and end on June 18th, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying, and construction estimating, as required for the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such as labor, material, equipment, etc.0

Appears in 1 contract

Samples: Vermont Contract

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment Cybersecurity Standard Update 2022-01: Contractor confirms that all products and services provided to or for the use of the State under this Agreement shall be in compliance with State of Vermont Cybersecurity Standard Update 2022 -01, which prohibits the use of certain branded products in State information systems or any vendor system that is supporting State information systems, and is available on-line at: xxxxx://xxxxxxxxxxxxxxx.xxxxxxx.xxx/cybersecurity/cybersecurity- standards-and-directives . State and Federal Terms for Products and Services. Contractor agrees that “STATE OF VERMONT- FEDERAL TERMS SUPPLEMENT (Non-Construction) for all Contracts and Purchases of Products and Services Using Federal Funds (Revision date: July 28, 2022)” which is attached as Attachment G to this amendment, applies to any products or services provided to the State, at any time, when using federal funds. This document consists of 2 5 pages. Except as modified by this Amendment No. 1, all provisions of the Contract remain in full force and effect. The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. STATE OF VERMONT MARBLE VALLEY ENGINEERING, P.C. ZONES LLC By: By: Name: Xxxxxxxxxxx Xxxx Xxxxxxxx X.X. Xxxxx Title: BGS Commissioner Date: By: Name: Title: Date: MASTER COPY DISTRIBUTED (Contractor, Accounting, Regional Director, Project Manager, DFM) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES (Revised 03/2018) THE XXXXX XX XXXXXXX XXXXXXXX XX. 00000 STANDARD FORM OF AGREEMENT BETWEEN Date: STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made this 18th day VERMONT- FEDERAL TERMS SUPPLEMENT (Non-Construction) for all Contracts and Purchases of June in the year 2018. BETWEEN Agency of Administration Department of Buildings Products and General Services Two Governor Aiken Avenue MontpelierUsing Federal Funds (Revision date: July 28, Vermont 05633-5801 the State. Marble Valley Engineering, P.C. 00 Xxxxx Xxxxxx Xxxxxxx, Xxxxxxx 00000 the ARCHITECT/ENGINEER. It is the intention of the State to utilize architectural and engineering services on a as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth below: The period of performance under this contract shall commence on June 18th, 2018 and end on June 18th, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying, and construction estimating, as required for the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such as labor, material, equipment, etc.2022)

Appears in 1 contract

Samples: Vermont Contract

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Cybersecurity Standard Update 2022-01: Contractor confirms that all products and services provided to or for the use of the State under this Agreement shall be in compliance with State of Vermont Cybersecurity Standard Update 2022-01, which prohibits the use of certain branded products in State information systems or any vendor system that is supporting State information systems, and is available on-line at: xxxxx://xxxxxxxxxxxxxxx.xxxxxxx.xxx/cybersecurity/cybersecurity-standards-and-directives . State and Federal Terms for Products and Services. Contractor agrees that “STATE OF VERMONT- FEDERAL TERMS SUPPLEMENT (Non-Construction) for all Contracts and Purchases of Products and Services Using Federal Funds (Revision date: July 28, 2022)” which is attached as Attachment G to this amendment, applies to any products or services provided to the State, at any time, when using federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment xxxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment This document consists of 2 6 pages. Except as modified by this Amendment No. 12, all provisions of the Contract remain in full force and effect. The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. BY THE STATE OF VERMONT MARBLE VALLEY ENGINEERINGVERMONT: BY THE CONTRACTOR: 3/20/2023 Xxxxxx De Xx Xxxxxx Date DVHA Commissioner XXX 0 Xxxxx, P.C. By000 Xxxxx Xxxxx Waterbury, VT 00000-0000 Phone: Name000-000-0000 Email: Xxxxxxxxxxx Xxxxxx.Xxxxxxxxxx@xxxxxxx.xxx 3/15/2023 Xxxx TitleXxxxxxxx Date Member 00000 Xxxxx Xxxxxxx Xxxxxx, Xxxxx 000 Xxxxxx Xxxxx, XX 00000 Phone: BGS Commissioner Date(000) 000-0000 Email: By: Name: Title: Date: MASTER COPY DISTRIBUTED (Contractor, Accounting, Regional Director, Project Manager, DFM) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES (Revised 03/2018) THE XXXXX XX XXXXXXX XXXXXXXX XX. 00000 STANDARD FORM OF AGREEMENT BETWEEN XXxxxxxxx@xxxx.xxx ATTACHMENT G STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made VERMONT- FEDERAL TERMS SUPPLEMENT (Non-Construction) for all Contracts and Purchases of Products and Services Using Federal Funds (Revision date: July 28, 2022) PROCUREMENT OF RECOVERED MATERIALS In the performance of this 18th day contract, the Contractor shall make maximum use of June in products containing recovered materials that are EPA-designated Items unless the year 2018. BETWEEN Agency of Administration Department of Buildings and General Services Two Governor Aiken Avenue Montpelier, Vermont 05633-5801 the State. Marble Valley Engineering, P.C. 00 Xxxxx Xxxxxx Xxxxxxx, Xxxxxxx 00000 the ARCHITECT/ENGINEER. It is the intention of the State to utilize architectural and engineering services on a as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth below: The period of performance under this contract shall commence on June 18th, 2018 and end on June 18th, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may products cannot be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying, and construction estimating, as required for the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such as labor, material, equipment, etc.acquired-

Appears in 1 contract

Samples: State of Vermont Contract

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment This document consists of 2 pages. Except as modified by this Amendment No. 1, all provisions of the Contract remain in full force and effect. The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. STATE OF VERMONT MARBLE VALLEY ENGINEERINGXXXXXX X. XXXXXX CONSULTING ENGINEERS, P.C. INC. By: Name: Xxxxxxxxxxx Xxxx Title: BGS Commissioner Date: By: Name: Name: Title: Title: Date: Date: MASTER COPY DISTRIBUTED (Contractor, Accounting, Regional Director, Project Manager, DFM) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES (Revised 03/2018) THE XXXXX XX XXXXXXX XXXXXXXX XX. 00000 STATE OF VERMONT STANDARD FORM OF AGREEMENT BETWEEN STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made this 18th day of June in the year 2018. BETWEEN Agency of Administration Department of Buildings and General Services Two Governor Aiken Avenue Montpelier, Vermont 05633-5801 the State. Marble Valley EngineeringXxxxxx X. Xxxxxx Consulting Engineers, P.C. 00 Inc. 000 Xxxxx Xxxxxx XxxxxxxXxxxx Xxxxxxxx, Xxxxxxx 00000 the ARCHITECT/ENGINEER. It is the intention of the State to utilize architectural and engineering services on a as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth below: The period of performance under this contract shall commence on June 18th, 2018 and end on June 18th, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying, and construction estimating, as required for the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such as labor, material, equipment, etc.not

Appears in 1 contract

Samples: Vermont Contract

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment This document consists of 2 7 pages. Except as modified by this Amendment No. 1, all provisions of the Contract remain in full force and effect. Revision Date: 05/30/2019 Contract #37050 Amendment #1 The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. STATE OF VERMONT MARBLE VALLEY ENGINEERING, P.C. VISUAL EDGE INC DBA OFFICE SYSTEMS OF VERMONT By: Name: Xxxxxxxxxxx Xxxx Title: BGS Commissioner Date: By: Name: Name: Title: Title: Date: MASTER COPY DISTRIBUTED (Contractor, Accounting, Regional Director, Project Manager, DFM) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES (Revised 03/2018) THE XXXXX XX XXXXXXX XXXXXXXX XX. 00000 STANDARD FORM OF AGREEMENT BETWEEN Date: Revision Date: 05/30/2019 Contract # 31311 Amendment #1 STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made this 18th day of June in the year 2018. BETWEEN Agency of Administration Department of Buildings and General Services Two Governor Aiken Avenue Montpelier, Vermont 05633-5801 the State. Marble Valley Engineering, P.C. 00 Xxxxx Xxxxxx Xxxxxxx, Xxxxxxx 00000 the ARCHITECT/ENGINEER. Office of Purchasing and Contracting NOVATION AND AMENDMENT It is hereby agreed by and among the intention State of Vermont, Department of Buildings and General Services (hereinafter called "State"), Office Systems of Vermont, a for-profit corporation with a principal place of business in Barre, VT (hereinafter called “Contractor”) and Visual Edge Inc. DBA Office Systems of Vermont, a corporation with a principal place of business in Barre, VT (hereinafter called "Contractor”), that the Contractor intends to assume all of the State to utilize architectural rights, benefits, duties and engineering services on a as needed basis. The obligations of Office Systems of Vermont under the Contract between the State and Office Systems of Vermont dated as of April 1, 2016, Contract # 31311, as amended to date (the ARCHITECT/ENGINEER agree as set forth below: The period of performance under this contract shall commence on June 18th, 2018 and end on June 18th, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying“Contract”), and construction estimating, that the Contract is hereby amended as required for the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such as labor, material, equipment, etc.follows:

Appears in 1 contract

Samples: Vermont Contract

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment State and Federal Terms for Products and Services related the 2020 Covid-19 Pandemic. Contractor agrees that “STATE OF VERMONT- FEDERAL TERMS SUPPLEMENT (Non- Construction) for all Contracts and Purchases of Products and Services Connected with 2020 Pandemic,” which is attached as Attachment D to this amendment, applies to any products or services provided to the State, at any time, in connection with the 2020 Pandemic. This document consists of 2 4 pages. Except as modified by this Amendment No. 1, all provisions of the Contract remain in full force and effect. Revision Date: 05/30/2019 Contract #38352 The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. STATE OF VERMONT MARBLE VALLEY ENGINEERING, P.C. By: FASTENAL COMPANY By: Name: Xxxxxxxxxxx Xxxx Title: BGS Commissioner Date: By: Name: Title: Title: Date: MASTER COPY DISTRIBUTED (Contractor, Accounting, Regional Director, Project Manager, DFM) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES (Revised 03/2018) THE XXXXX XX XXXXXXX XXXXXXXX XX. 00000 STANDARD FORM OF AGREEMENT BETWEEN Date: Revision Date: 05/30/2019 Attachment D STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made VERMONT- FEDERAL TERMS SUPPLEMENT (Non-Construction) for all Contracts and Purchases1 of Products and Services Connected with 2020 Pandemic XXXX ANTI-LOBBYING AMENDMENT Contractors who apply or bid for an award of $100,000 or more certify that each tier certifies to the tier above that it will not and has not used Federal appropriated funds to pay any person or organization for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, officer or employee of Congress, or an employee of a Member of Congress in connection with obtaining any Federal contract, grant, or any other award covered by 31 U.S.C. § 1352. Each tier shall also disclose any lobbying with non-Federal funds that takes place in connection with obtaining any Federal award. Such disclosures are forwarded from tier to tier, up to the recipient who in turn will forward the certification(s) to the awarding agency PROCUREMENT OF RECOVERED MATERIALS In the performance of this 18th day contract, the Contractor shall make maximum use of June in products containing recovered materials that are EPA-designated Items unless the year 2018. BETWEEN Agency of Administration Department of Buildings and General Services Two Governor Aiken Avenue Montpelier, Vermont 05633-5801 the State. Marble Valley Engineering, P.C. 00 Xxxxx Xxxxxx Xxxxxxx, Xxxxxxx 00000 the ARCHITECT/ENGINEER. It is the intention of the State to utilize architectural and engineering services on a as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth below: The period of performance under this contract shall commence on June 18th, 2018 and end on June 18th, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may products cannot be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying, and construction estimating, as required for the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such as labor, material, equipment, etc.acquired-

Appears in 1 contract

Samples: Vermont Contract

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment This document consists of 2 pages. Except as modified by this Amendment No. 12, all provisions of the Contract remain in full force and effect. The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. STATE OF VERMONT MARBLE VALLEY ENGINEERING, P.C. Genuine Parts Company doing business as NAPA Auto Parts By: Name: Xxxxxxxxxxx Xxxx _Xxxxxxxx Xxxxx Title: BGS Commissioner - Buildings and General Services Date: By: Name: Title: Date: MASTER COPY DISTRIBUTED State of Vermont Office of Purchasing and Contracting 000 Xxxxx Xxxxxx Xxxxxxxxxx, Xx. 00000-0000 NOTE TO FILE TO: FILE FROM: Xxxxxx X. Xxxxx DATE: July 20, 2021 SUBJECT: Reflecting and Implementing Auto-Extensions of Participating Addenda: Auto Parts Contracts, Specifically: 40083 X’Xxxxxx Auto Parts 39961 Genuine Parts Company d/b/a NAPA Auto Parts 39976 Automotive Supply Assoc., Inc d/b/a SanelNAPA1 To new end dates of 10/19/2021 Each of these contracts is the product of Vermont’s participation, via Participating Addenda, in collaborative multistate NASPO ValuePoint contracts for auto parts. X’Xxxxxx Auto Parts (Contractorhereinafter, AccountingO’Reilly) operates as a vertically integrated company in which the one company is the holder of the national contract, Regional Directorand also operates all retail stores in Vermont. It therefore holds the master contract with the lead State of Oklahoma, Project Managerand is the signatory on Vermont’s Participating Addendum in the form of VT Contract 40083. The NAPA arrangement is multi-layered. Genuine Parts Company d/b/a NAPA Auto Parts (hereinafter, DFM“GPC”) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES is the national-level company holding the master contract with the State of Oklahoma, but GPC does not usually sell at retail to end-use customers. Rather, GPC has authorized independent NAPA distributors who perform sales to customers. Automotive Supply Assoc., Inc. d/b/a SanelNAPA (Revised 03/2018hereinafter, “Sanel”) THE XXXXX XX XXXXXXX XXXXXXXX XXis one of those distributors, and is the distributor with the single largest number and most geographically diverse locations of retail stores within Vermont. 00000 STANDARD FORM OF AGREEMENT BETWEEN As a result, in this scenario, there is the master GPC contract with the State of Oklahoma, a Vermont Participating Addendum with GPC, in the form of VT Contract 39961 with GPC, and an additional Vermont Participating Addendum with Sanel in the form of VT Contract 39976 with Sanel. Based upon advice from the Attorney General’s Office to the Office of Purchasing & Contracting, all three of the relevant Participating Addenda (40083, O’Reilly; 39961, GPC, and 39976, Sanel) do not include specific end dates, but, rather, intentionally base their end dates upon the end date of the relevant Oklahoma master contracts, with the intention that the VT Participating Addenda therefore self-extend, without need for amendment by Vermont, if, whenever, and to the extent that the relevant master(s) are extended. i The original end dates of the relevant Oklahoma master contracts were July 21, 2021. A new set of multistate collaborative contracts, intended as replacements, are being 1 In the case of Xxxxx, Xxxxxxxx 00000, additional funds are also needed, therefore an actual amendment that both adds funds and that makes note of the new end date will be routed. However, as Xxxxx, Xxxxxxxx 00000, is integrally related to the GPC Contract 39961, this memo covers the totality of the overall situation. headed up by the State of California. However, that is taking more time than anticipated, and, as a result, Oklahoma has extended the end dates of the existing Oklahoma master contracts from July 21, 2021 to October 19, 2021. Because of the auto-extending end dates of the Vermont Participating Addenda(40083, O’Reilly; 39961, GPC, and 39976, Sanel), thus, from a purely transactional and legal standpoint, there is not a need for what ordinarily would be a contract amendment, to extend the end date. As noted above in footnote 1, the Sanel contract 39976 also needs funds, so an actual amendment is needed and will be routed for that. However, for purposes of reliable, transparent, and consistent records and procedures with regard to contracts and contract-related systems and information, there is a need for specific actions. The end dates in the VISION financial system and Contract Tracking (CTS) currently reflect the 7/21/21 end dates as were in effect when the Vermont Participating Addenda (40083, O’Reilly; 39961, GPC, and 39976, Sanel) were put into effect. These contracts (40083, O’Reilly; 39961, GPC, and 39976, Sanel) are highly relied-upon by the Agency of Transportation, BGS, Forests and Parks, Military, and others; it is important to keep them in effect until California completes its new process and Vermont/ OPC can put in place the new participating addenda that will “connect up with” the new CA-based contracts. This memo and the accompanying RFRs, one, separately, for each contract, are intended to accomplish and memorialize the extension of the end dates of (40083, O’Reilly; 39961, GPC, and 39976, Sanel) from 7/21/21 to 10/19/21, and, accordingly, upon approval of each such RFR, the dates within VISION and Contract Tracking will then be changed to 10/19/2021. Contract 39976 with Xxxxx has used $246,115.93 out of its original $250,000.00, and so does need additional funds – so, n actual amendment 1 to that Contract 39976 with Sanel, to add $100,000.00 is being routed. The date extension, as described in this memo, is also identified and explained in that amendment. These may each be reflected as a Change Order within the system(s) but do not need contractor signature or Commissioner signature on actual amendment(s). I recommend approval of this action/update that notes and implements the extended end dates of 10/19/21 for (40083, O’Reilly; 39961, GPC, and 39976, Sanel) , and, in the case of Contract 39976 with Xxxxx, the Amendment to add $100,000.00, in relation to each of these contracts. Please contact Xxxxxx X. Xxxxx at 828-2217 or email at Xxxxxx.X.Xxxxx@xxxxxxx.xxx with any questions. i Contract 40083, O’Reilly: Contract 39961, GPC: Contract 39976, Sanel: N.B.- the reason that the relevant clause in 39976, Xxxxx refers to the Participating Addendum rather than the Master is that 39961 (GPC) keys off the end date of the Master, and then 39976 (Sanel) keys off the end date of 39961 (Sanel) STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made this 18th day of June in the year 2018. BETWEEN Agency of Administration Department of Buildings and General Services Two Governor Aiken Avenue Montpelier, Vermont 05633-5801 the State. Marble Valley Engineering, P.C. 00 Xxxxx Xxxxxx Xxxxxxx, Xxxxxxx 00000 the ARCHITECT/ENGINEER. It is the intention of PARTICIPATING ADDENDUM # 39961 FOR NASPO VALUEPOINT PURCHASING PROGRAM: Led by the State to utilize architectural and engineering services on a of Oklahoma Master Agreement #0900006747 Contractor: Genuine Parts Company doing business as needed basis. The State and the ARCHITECTNAPA Auto Parts Contractor’s NASPO ValuePoint Webpage: xxxxx://xxx.xxxxxxxxxxxxxxx.xxx/portfolio/auto-parts-immediate- need-aftermarket-2016-2021/ENGINEER agree as set forth below: The period of performance under this contract shall commence on June 18th, 2018 and end on June 18th, 2020 with an option to renew for two additional onenapa-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying, and construction estimating, as required for the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such as labor, material, equipment, etc.auto-parts/

Appears in 1 contract

Samples: Vermont Contract

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment State and Federal Terms for Products and Services related the 2020 Covid-19 Pandemic. Contractor agrees that “STATE OF VERMONT- FEDERAL TERMS SUPPLEMENT (Non- Construction) for all Contracts and Purchases of Products and Services Connected with 2020 Pandemic,” which is attached as Attachment D to this amendment, applies to any products or services provided to the State, at any time, in connection with the 2020 Pandemic. This document consists of 2 4 pages. Except as modified by this Amendment No. 1, 1 all provisions of the Contract remain in full force and effect. Revision Date: 05/30/2019 The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. STATE OF VERMONT MARBLE VALLEY ENGINEERING, P.C. Colorlab Cosmetics Inc By: Name: Xxxxxxxxxxx Xxxx Title: BGS Commissioner Date: By: Name: Name: Title: Title: Date: MASTER COPY DISTRIBUTED (Contractor, Accounting, Regional Director, Project Manager, DFM) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES (Revised 03/2018) THE XXXXX XX XXXXXXX XXXXXXXX XX. 00000 STANDARD FORM OF AGREEMENT BETWEEN Date: Revision Date: 05/30/2019 Attachment D STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made VERMONT- FEDERAL TERMS SUPPLEMENT (Non-Construction) for all Contracts and Purchases1 of Products and Services Connected with 2020 Pandemic XXXX ANTI-LOBBYING AMENDMENT Contractors who apply or bid for an award of $100,000 or more certify that each tier certifies to the tier above that it will not and has not used Federal appropriated funds to pay any person or organization for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, officer or employee of Congress, or an employee of a Member of Congress in connection with obtaining any Federal contract, grant, or any other award covered by 31 U.S.C. § 1352. Each tier shall also disclose any lobbying with non-Federal funds that takes place in connection with obtaining any Federal award. Such disclosures are forwarded from tier to tier, up to the recipient who in turn will forward the certification(s) to the awarding agency PROCUREMENT OF RECOVERED MATERIALS In the performance of this 18th day contract, the Contractor shall make maximum use of June in products containing recovered materials that are EPA-designated Items unless the year 2018. BETWEEN Agency of Administration Department of Buildings and General Services Two Governor Aiken Avenue Montpelier, Vermont 05633-5801 the State. Marble Valley Engineering, P.C. 00 Xxxxx Xxxxxx Xxxxxxx, Xxxxxxx 00000 the ARCHITECT/ENGINEER. It is the intention of the State to utilize architectural and engineering services on a as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth below: The period of performance under this contract shall commence on June 18th, 2018 and end on June 18th, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may products cannot be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying, and construction estimating, as required for the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such as labor, material, equipment, etc.acquired-

Appears in 1 contract

Samples: bgs.vermont.gov

Certification Regarding Suspension or Debarment. Contractor certifies under the pains and penalties of perjury that, as of the date this contract amendment is signed, neither Contractor nor Contractor’s principals (officers, directors, owners, or partners) are presently debarred, suspended, proposed for debarment, declared ineligible or excluded from participation in federal programs, or programs supported in whole or in part by federal funds. Contractor further certifies under pains and penalties of perjury that, as of the date this contract amendment is signed, Contractor is not presently debarred, suspended, nor named on the State’s debarment list at: xxxx://xxx.xxxxxxx.xxx/purchasing-contracting/debarment This document consists of 2 pages. Except as modified by this Amendment No. 1, all provisions of the Contract remain in full force and effect. The signatures of the undersigned indicate that each has read and agrees to be bound by this Amendment to the Contract. STATE OF VERMONT MARBLE VALLEY ENGINEERINGENGINEERING VENTURES, P.C. By: Name: Xxxxxxxxxxx Xxxx Title: BGS Commissioner Date: By: Name: Name: Title: Title: Date: Date: MASTER COPY DISTRIBUTED (Contractor, Accounting, Regional Director, Project Manager, DFM) DEPARTMENT OF BUILDINGS AND GENERAL SERVICES (Revised 03/2018) THE XXXXX XX XXXXXXX XXXXXXXX XX. 00000 STATE OF VERMONT STANDARD FORM OF AGREEMENT BETWEEN STATE OF VERMONT OR ANY AGENCY THEREOF AND ARCHITECT/ENGINEER AGREEMENT made this 18th day of June in the year 2018. BETWEEN Agency of Administration Department of Buildings and General Services Two Governor Aiken Avenue Montpelier, Vermont 05633-5801 the State. Marble Valley EngineeringEngineering Ventures, P.C. 00 000 Xxxxx Xxxxxx XxxxxxxXxxxxx, Xxxxxxx 00000 the ARCHITECT/ENGINEER. It is the intention of the State to utilize architectural and engineering services on a as needed basis. The State and the ARCHITECT/ENGINEER agree as set forth below: The period of performance under this contract shall commence on June 18th, 2018 and end on June 18th, 2020 with an option to renew for two additional one-year terms. MAXIMUM LIMITING AMOUNT $ 400,000.00 PROJECT DESCRIPTION: This contract may be utilized for design of new construction and renovation projects, including any and all phases from feasibility/programming through construction administration; including but not limited to code analysis, studies, permitting, CAD drafting, surveying, and construction estimating, as required for the specific project. Projects are not to exceed $50,000.00, including all costs associated with the individual project, such as labor, material, equipment, etc.Suite 2A

Appears in 1 contract

Samples: Vermont Contract

Time is Money Join Law Insider Premium to draft better contracts faster.