Central Plant Sample Clauses

Central Plant. The primary heating source shall be a scheduled hot water system, generated by fire-tube dual fuel boilers without side air reset, the plant is located at the Penthouse Mechanical Equipment Room.
AutoNDA by SimpleDocs
Central Plant. The term "Central Plant" shall mean the equipment, fixtures, piping, wiring, machinery, and all other items of personal property comprising the plant for chilled and hot water production and circulation, and electricity generation and transmission, currently being constructed in the basement of the Center in the Central Plant Space and on the Cooling Tower Parcel.
Central Plant. All CHW and HHW services will be provided by existing chillers, cooling towers, boilers and associated pumps through new piping utilities.
Central Plant. (a) The Central Plant is not a “utility facility” regulated by an Governmental Authority and the provision of services by the Central Plant is not subject to any regulatory permit or license. The documents listed on Schedule N constitute all agreements with respect to the provision of services related to the Central Plant (the “Central Plant Agreements”).
Central Plant. A. Administrative area
Central Plant. The existing chilled water plant may be utilized to serve general office HVAC loads. The plant will consist of water-cooled chillers and associated cooling towers with a combined maximum capacity of up to 1150 tons (170 sf/ton) to serve the Complex. HVAC The existing parking garage exhaust system will remain. Shell Ventilation – Ducted ventilation of service areas. The existing electrical, elevator machine and other utility room will be served by their existing ventilation systems as required to meet code and necessary for equipment or environmental conditions.
Central Plant. Laboratory Areas Air Handlers serving lab areas shall be manufactured by Energy Labs, or approved equal. Unit quality level shall be consistent with a 15-year useful life expectancy and rated at high-efficiency. Coils exposed to outdoor air shall be copper finned or factory coated aluminum fins for marine environment. Air Handlers shall be sized such that the units are capable of providing 100% outside air to the space at minimum of 12 air changes per hour. All supporting mechanical equipment (including, but not limited to) piping, ductwork, coil size, chilled water capacity, heating water capacity, and controls shall be sized and installed accordingly. All units shall be controlled via Direct Digital Controls. Air Handler, Piping, and Duct Sizing shall all be calculated and designed to satisfy typical laboratory heating and cooling demands plus a margin of 15%. Central Plant Equipment The chilled water system shall consist of a water-cooled chiller/chiller plant having the following items:
AutoNDA by SimpleDocs
Central Plant. Air cooled chillers using R134a refrigerant are positioned at roof level below an open screen. The associated pump sets are located at basement level. Gas fired boilers are positioned at basement level.
Central Plant. (a) The Central Plant is not a “utility facility” regulated by an Governmental Authority and the provision of services by the Central Plant is not subject to any regulatory permit or license. The documents listed on Schedule N constitute all agreements with respect to the provision of services related to the Central Plant (the “Central Plant Agreements”). (b) Each Borrower hereby acknowledges the collateral assignment to Lender of the Central Plant Agreements and their respective rights thereunder pursuant to the Mortgage and, notwithstanding any provision of the Central Plant Agreements to the contrary, no further action or instrument is required with respect to such assignment. Each Borrower has received written notice of the collateral assignment to Lender of the Central Plant Agreements and shall deliver to Lender any notice of default delivered by or to any party with respect to the Central Plant Agreements in accordance with Section 8.4. Section 4.
Central Plant. From and after the Resort Hotel and Casino Opening Date, General Manager shall assume the operation and maintenance of the Central Plant in accordance with the central plant agreement for the CityCenter Project and the Excess Capacity Agreement.
Time is Money Join Law Insider Premium to draft better contracts faster.