CEILING PLASTER Sample Clauses

CEILING PLASTER. Ceiling plaster shall be 10 mm.
AutoNDA by SimpleDocs
CEILING PLASTER. Cement plaster 3/8" (10 mm) thick under soffit of R.C.C. roof slabs only, upto 20' height. b) Ratio 1:3 100 .Sft 25000.00 2,153.90 24 10/43 (P.70) TUFF PAVERS : Providing and laying Tuff pavers, having 7000 PSI, crushing strength of approved manufacturer, over 2" to 3" sand cushion i/c grouting with sand in joints i/c finishing to require slope . complete in all respect. (50% Grey / 50% Coloured) b) 60-mm thick Per .Sft 2821.00 109.05
CEILING PLASTER. Cement plaster 3/8" (10 mm) thick under soffit of R.C.C. roof slabs only, upto 20' height. b) Ratio 1:3 100 .Sft 25000.00 2,396.00 46 25/35 (P.157) M.S. RAILING: Providing and fixing terrace railing of 2" (50 mm) i/d conduit pipe 16 SWG, welded with 5/8"x5/8" (16x16 mm) square bar 2.75 ft. (838 mm) high fixed at 5" (125 mm) centre to centre, in reinforced cement concrete slab with suitable arrangement, complete in all respects, as per design and drawing. Rft 859.00 739.50 TOTAL AMOUNT (SCHEDULE ITEMS) = PKR. NON-SCHEDULE ITEMS: B-FIRST FLOOR CIVIL WORKS : 47 NSI KHAPRAIL TILE:Providing and laying of approved quality Khaprail clay roofing Spanish tile size (9" x 6") of approved design and shade laid on sloppy slab & shades with 3/4" thick cement sand mortar ratio (1:3) bed and jointing , complete in all respects as directed by the Engineer-in-charge. Per.Sft 587.00 211.00 48 NSI PRECAST SLABS: Providing and laying pre cast RCC slab of "XXXX XXXXXXX" length 0.914 Meter to 1.371 Meter & width upto 0.475 M including hoisting setting & jointing in Cement mortar 1:3 all as specified, complete in all respects. Per.Sft 1350.00 104.00 TOTAL AMOUNT (NON-SCHEDULE ITEMS) = PKR. X.XXXXX AMOUNT (PKR) Xx.Xx. Item # Description of Items. (Rates of MRS by Annual 2nd July 2019 to 31 Dec 2019, Faisalabad) Unit Quantity Rate (PKR) Rate Quoted by the Contractor Amount (PKR) SCHEDULE ITEMS: C-SECOND FLOOR CIVIL WORKS : 49 Ch.10/3 (P.66) BRICK BALLAST UNDER FLOOR : Providing, laying, watering and ramming brick ballast 1½" to 2"(40 mm to 50 mm) gauge mixed with 25% sand, for floor foundation, complete in all respects. 100 .Cft 286.00 4,368.15 50 Ch.6/5(f)+ 6/6(d)+ 6/6(d) (P.42) PCC 1:4:8 UNDER FLOORING : Providing and laying of cement concrete plain including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate ) :- Ratio 1:4:8 100 .Cft 286.00 22,700.20 51 Ch.7/5 (i) + 7/6 (ii) (P.52) BRICK MASONRY : Pacca brick work in second floor:- i) cement, sand mortar:- Ratio 1:4 100 .Cft 541.00 22,386.65 52 Ch.7/5 (i) + 7/6 (ii) (P.52) BRICK MASONRY : Pacca brick work in second floor:- i) cement, sand mortar:- Ratio 1:5 100 .Cft 3431.00 21,693.05 53 Ch.6/6 (a-3) + 6/6(d)+6/6(d)(P.42) REINFORCED CEMENT CONCRETE WORK IN COLUMNS , SHEAR WALLS & OHWT 3000 PSI:Providing and laying reinforced cement concrete (including prestressed concrete), using coarse sand and screened graded and washed aggregate, in required shape and design, including forms,...
CEILING PLASTER. Cement plaster 3/8" (10 mm) thick under soffit of R.C.C. roof slabs only, upto 20' height. b) Ratio 1:3 100 .Sft 3852.00 2,638.10

Related to CEILING PLASTER

  • Ceiling Company and its subcontractors will not affix, attach, or suspend any lighting fixtures, signs, or other fixtures or devices of any kind or nature from the ceiling above any of the Premises without the prior written approval of Authority.

  • Walls 12 Developer shall provide rustication patterns on all walls, except drainage headwalls, in Aesthetic 13 Area 3 in accordance with Exhibit L2.24 of the LAADCR. The final designs shall resemble these 14 simulations.

  • Work Area The specific work area and/or crew an employee reports to on a daily schedule. Work areas are generally smaller divisions of a larger Bid Area.

  • Built-up Area The built-up area for the Designated Apartment or any other Unit shall mean the Carpet Area of such Unit and Balcony area and 50% (fifty percent) of the area covered by those external walls which are common between such Unit/Balcony and any other Unit/Balcony and the area covered by all other external walls of the such Unit/Balcony.

  • FINISHES Buyer(s) understands that the location of telephone, electric, cable TV and other utility outlets, doors, windows, air conditioning components, lighting fixtures, equipment and fixtures are subject to change and Buyer(s) understands that materials such as brick, wood, wood grain, carpeting, paint, cabinets, cultured marble, tile, Formica, granite and the like are subject to shading and gradation and may vary from samples, models or color charts, and from piece to piece, and Contractor shall not be liable for such variations.

  • FLOORING All Bed Rooms, Dinning-cum-Living, and would be finished with Ivory Vitrified tiles (24'' X 24'') flooring and 4'' skirting. Bath-room, Kitchen & Balcony would be finished with Ivory Ceramic tiles (12'' X 12'') flooring. The walls of the Toilets/Bathrooms would finish with white glazed tiles in 60'' height. Roof would be finished with roof tiles.

  • Carpet Cleaning Shampooing carpets with the deep dirt extraction (steam cleaning) method per manufactures recommendations.

  • Interior (a) Ceilings, sidewalls and bulkhead panels shall be clean and free of cracks and stains;

  • Provisioning Line Splitting and Splitter Space 3.8.1 The Data LEC, Voice CLEC or BellSouth may provide the splitter. When EZ Phone or its authorized agent owns the splitter, Line Splitting requires the following: a non-designed analog Loop from the serving wire center to the NID at the End User’s location; a collocation cross connection connecting the Loop to the collocation space; a second collocation cross connection from the collocation space connected to a voice port; the high frequency spectrum line activation, and a splitter. The Loop and port cannot be a Loop and port combination (i.e. UNE-P), but must be individual stand-alone Network Elements. When BellSouth owns the splitter, Line Splitting requires the following: a non designed analog Loop from the serving wire center to the NID at the End User’s location with CFA and splitter port assignments, and a collocation cross connection from the collocation space connected to a voice port.

  • Basement Any leaks or evidence of moisture? Yes No Unknown Does Not Apply Comments:

Time is Money Join Law Insider Premium to draft better contracts faster.