Carried to Final Summary Sample Clauses

Carried to Final Summary. Section No. 1 PRELIMINARIES Bill No. 1 Preliminaries TECHVOLUTION ENGINEERS Item R R Item No 2/1/1 2/1/2 2/1/3 2/1/4 2/1/5 SECTION NO. 2 BILL NO. 1 ALTERATIONS TEMPORARY BARRIERS, SCREENS, ETC Temporary barriers, screens, etc including removal Dust screen 2,1mm high between concrete floor and ceiling formed of suitable timber framing with micron polyethylene sheeting stapled on including corners, ends, etc m REMOVAL OF EXISTING WORK Taking down and removing roofs, floors, panelling, ceilings, partitions, etc Clay tiles roof covering and timber purlins (sloping) m2 Fibre cement roof covering and timber purlins (flat) m2 Gypsum plasterboard ceilings including cornices, timber brandering, etc m2 Taking up and removing vinyl floor coverings, carpeting, etc Vinyl tile floor covering including preparing screed for new vinyl floor covering m2 Carried Forward Section No. 2 BUILDERS WORK - ROOF REPAIRS AND REPLACEME Bill No. 1 Alterations TECHVOLUTION ENGINEERS Quantity 10 902 312 1,059 Rate R Amount 2/1/6 2/1/7 2/1/8 2/1/9 2/1/10 Brought Forward Carefully remove and later re-install in same positions Roof air vents including support structures and other accessories No PREPARATORY WORK TO EXISTING SURFACES Scrapping off existing paintwork and making good internal plaster to receive new paint m2 ALLOWANCES Repairing Existing Roof Structure Allow R40,000 (Forty Thousand Rand) for the inspection, documenting and repair of the existing roof structure Removal and re-installation of roof accessories Allow R12,500 (Twelve Thousand Five Hundred Rand)for the careful removal and re-installation of all roof accessories (except the roof air vents 12 in No. elsewhere measured) in line with manufacturer's recommendations Repairing/Upgrading Electrical Installations Allow R300,000 (Three Hundred Thousand Rand) for electrical investigation, checking for compliance of the entire building, upgrades, repairs, re-wiring, insulation of roof electrical components and issuance of an Electrical Certificate of Compliance Carried Forward to Summary of Section No. 2 Section No. 2 BUILDERS WORK - ROOF REPAIRS AND REPLACEME Bill No. 1 Alterations TECHVOLUTION ENGINEERS 12 354 R SUM SUM SUM R
AutoNDA by SimpleDocs
Carried to Final Summary. Section No. 1 Preliminaries Bill No. 1 PRELIMINARIES Prepared by: Xxxxxx Xxxxxxxx Surveyors R Amount Item No SECTION NO. 2 Quantity Rate BILL NO. 1 ALTERATIONS PREAMBLES For preambles see "Model Preambles for Trades (2008 Edition)" and Supplementary preambles as specified in the Trades SUPPLEMENTARY PREAMBLES Nature of the works Tenderers are advised to visit the site and to satisfy themselves as to the nature and extent of the work to be done and provide in their tenders for any items not specifically mentioned which they may deem necessary for the proper completion of the work. Tenderers are advised that the existing buildings will not be in occupation during the progress of the work but that nearby new buildings will be in occupation and due allowance must be made for the work being carried out at such times and in such a manner as will least interfere with the routine of the occupants and as may be directed by the architect.
Carried to Final Summary. Section No. 2 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Item No BILL NO. 01 Quantity Rate ALTERATIONS PREAMBLES For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder SUPPLEMENTARY PREAMBLES The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL This Bill of Quantities must be read in conjunction with the attached specifications and details View site Before submitting his tender the tenderer shall visit the site and satisfy himself as to the nature and extent of the work to be done and the value of the materials salvageable from the alterations. No claim for any variations of the contract sum in respect of the nature and extent of the work or of inferior or damaged materials will be entertained General The contractor shall carry out the whole of the works with as little mess and noise as possible and with a minimum of disturbance to tenants in the building and to adjoining premises and their tenants. He shall provide proper protection and provide, erect and remove when directed, any temporary tarpaulins that may be necessary during the progress of the works, all to the satisfaction of the principal agent Carried Forward R Section No. 3 Bill No. 1 Alterations Bespoke Global Efficacy Ramgoolam (Pty) Ltd Amount Brought Forward R The contractor will be required to take all dimensions affecting the existing buildings on the site and he will be held solely responsible for the accuracy of all such dimensions where used in the manufacture of new items (doors, windows, fittings, etc) (CPAP WORK GROUP NO. 102) unless otherwise stated REMOVAL OF EXISTING WORK Taking out and removing doors, windows, etc, including thresholds, xxxxx, etc (building up openings and making good finishes elsewhere)
Carried to Final Summary. Section No. 1 Preliminaries and General Xxxx No. 1 Preliminaries and General R R Item No 1 2 3 SECTION 2 PRETORIA NATIONAL BOTANICAL GARDEN XXXX NO.1 ALTERATIONS (THATCH) REMOVAL OF EXISTING WORK Taking down and removing thatch roofs, etc Thatch roofs not exceeding 175mm thick including glass fibre ridge cappings (battens to remain) AA: 0 AB: 0 AC: 9 AD: 0 AE: 0 AF: 28 AG: 27 AH: 0 AI: 0 AJ: 0 AK: 9 AL: 20 AM: 0 AN: 0 AO: 0 m2 Glass fibre ridge capping AA: 0 AB: 2 AC: 0 AD: 0 AE: 4 AF: 6 AG: 0 AH: 0 AI: 0 AJ: 3 AK: 0 AL: 0 AM: 0 AN: 1 AO: 0 m PREPARATORY WORK TO EXISTING SURFACES Prepare grass ridges to recieve glass fibre ridges (ridge measured elsewhere) AA: 4 AB: 0 AC: 0 AD: 5 AE: 0 AF: 0 AG: 0 AH: 4 AI: 20 AJ: 0 AK: 0 AL: 0 AM: 3 AN: 0 AO: 10 m Carried Forward to Summary of Xxxxxxx Xx. 0 Xxxxxxx Xx. 0 Xxxxxxxx National Botanical Garden Xxxx No. 1 Thatch- Alterations Quantity 92 16 46 Rate R Amount
Carried to Final Summary. COMMENT It is hoped that a simplified Preliminaries Bill No 1 for nominated or selected subcontract works will lead to a more uniform and practical approach when compiling tender documents for the wide variety and scope of such works in the building industry. Statistics have shown that for each N/S Subcontract Agreement (NSSA) sold four Principal Building Agreements (PBA) are sold – this should be the other way round! To increase the sales of the NSSA JBCC has reduced the price thereof compared to what it sells the PBA for, but unfortunately this has resulted in only a minor increase in the sales of the NSSA
Carried to Final Summary. Section No. 1 PRELIMINARIES AND GENERAL Xxxx No. 1 PRELIMINARIES Item R R

Related to Carried to Final Summary

  • Amount of Funds Available to Grantee The maximum amount of funding being made available to Grantee under this Agreement is: $20,000. This amount may be amended, subject to funds availability, by mutual consent of the parties. Grant funds under this Agreement may be considered taxable income.

  • SIMPLE IRA-to-Xxxx XXX Conversions You are eligible to convert all or any portion of your existing SIMPLE IRA into your Xxxx XXX, provided two years have passed since you first participated in a SIMPLE IRA plan sponsored by your employer. The amount of the conversion from your SIMPLE IRA to your Xxxx XXX will be treated as a distribution for income tax purposes and is includible in your gross income. Although the conversion amount generally is included in income, the 10 percent early distribution penalty tax will not apply to conversions from a SIMPLE IRA to a Xxxx XXX, regardless of whether you qualify for any exceptions to the 10 percent early distribution penalty tax. If you are required to take a required minimum distribution for the year, you must remove your required minimum distribution before converting your SIMPLE IRA.

  • Payment of Supplementary Xxxx 10.7.1 SPD may raise a ("Supplementary Xxxx") for payment on account of:

  • DESCRIPTION OF CONTRACT MODIFICATION This contract modification is made in accordance with Exhibit E-Revised-1, Contractual Terms and Conditions, Section 22. CHANGES, to be made part hereof for all pertinent purposes. The changes are as follows:

  • Traditional IRA-to-Xxxx XXX Conversions If you convert to a Xxxx XXX, the amount of the conversion from your Traditional IRA to your Xxxx XXX will be treated as a distribution for income tax purposes, and is includible in your gross income (except for any nondeductible contributions). Although the conversion amount generally is included in income, the 10 percent early distribution penalty tax will not apply to conversions from a Traditional IRA to a Xxxx XXX, regardless of whether you qualify for any exceptions to the 10 percent penalty tax. If you are required to take a required minimum distribution for the year, you must remove your required minimum distribution before converting your Traditional IRA.

  • Contents of Suspension Notice A Suspension Notice shall specify:

  • Quarterly and Annual Reconciliation 10.6.1 The Parties acknowledge that all payments made against Monthly Bills and Supplementary Bills shall be subject to quarterly reconciliation within 30 days of the end of the quarter at the beginning of the following quarter of each Contract Year and annual reconciliation at the end of each Contract Year within 30 days to take into account the Energy Accounts, Tariff adjustment payments, Tariff Rebate, Late Payment Surcharge, or any other reasonable circumstance provided under this Agreement.

  • NOTICE OF SUPPLEMENTAL ALLOCATION OF FUNDS By the signature below, the City Controller certifies that, upon the request of the Director, the supplemental sum set out below has been allocated for the purposes of the Agreement out of funds appropriated for this purpose by the City Council of the City of Houston. This Supplemental Allocation has been charged to such appropriation. $

  • Interest Calculation Interest on the outstanding principal balance of the Loan shall be calculated by multiplying (a) the actual number of days elapsed in the period for which the calculation is being made by (b) a daily rate based on a three hundred sixty (360) day year by (c) the outstanding principal balance.

  • Distributions; Xxxxxx Xxx Guaranty On or before each Determination Date (or as soon thereafter as is reasonably practicable), Xxxxxx Mae shall calculate the Lower Tier Distribution Amount for the current calendar month. On each Distribution Date, Xxxxxx Xxx shall withdraw from the Certificate Account the portion of the Lower Tier Distribution Amount distributable thereon and shall make the distributions to the Holders of the related Lower Tier Regular Classes in the respective amounts and in the applicable manner determined pursuant to Section 2.02. In the event that the amount on deposit in the Certificate Account on any Distribution Date shall be less than the applicable portion of the Lower Tier Distribution Amount distributable thereon, Xxxxxx Mae shall provide from its own funds the amount of any such insufficiency. In addition, in the event that (i) the applicable portion of the Lower Tier Distribution Amount shall be insufficient to pay all interest due and payable on the related Lower Tier Regular Classes on such Distribution Date or (ii) such Distribution Date is a Final Distribution Date for any Class and the distribution on such Distribution Date of the applicable portion of the Lower Tier Distribution Amount will not be sufficient to reduce the Class Balance of such Class to zero on such Final Distribution Date, then Xxxxxx Xxx shall (a) withdraw from the Certificate Account, such amount as shall be necessary to remedy such insufficiency and (b) to the extent that funds in the Certificate Account shall be insufficient therefor, apply its own funds towards remedying the same.

Time is Money Join Law Insider Premium to draft better contracts faster.