Care of Soils in Unsurfaced Land Sample Clauses

Care of Soils in Unsurfaced Land. When the carrying out of works will have an adverse effect on the physical condition of agricultural and other unsurfaced land, the works shall be planned to reduce the occupation time to a minimum. Provision shall be made for the use of low ground pressure vehicles or protective trackway to minimise damage to the soil structure. Whether for cable trenches, pole erection or tower foundation work, care shall be taken to ensure that excavated topsoil and subsoil are kept separate from other excavated material and are not brought into contact with, or compressed by, any machinery. All excavated soils shall be reinstated in the correct sequence. When backfilling is completed sufficient top soil shall be heaped over the excavation(s) to allow for settlement. All surplus soil shall be removed from the site.
AutoNDA by SimpleDocs

Related to Care of Soils in Unsurfaced Land

  • No Storing Hazardous Articles Not to keep or store any offensive, combustible, obnoxious, hazardous or dangerous articles in the said Apartment, the Common Areas, and the Building.

  • Operating Environment Subscriber is solely responsible for acquiring, installing, operating and maintaining the hardware, software and Internet Browser environment necessary to access the Site and use the Services. Information on operating environment requirements can be located on the Site.

  • Porcupine Site Highway 11

  • Groundwater The groundwater shall not be degraded as a result of the waste maintained at the facility.

  • Underground Facilities All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including without limitation those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems.

  • ARCHAEOLOGY Lessee shall not destroy, disturb, mar, collect, remove or alter any prehistoric or historic resources of any kind on Weld County lands as provided by law. These resources include, but are not limited to, all artifacts of stone, wood or metal, pictographs, structures, and bones. A discovery of anything of prehistoric or historic nature shall be reported to Lessor or the State of Colorado Archaeologist immediately.

  • Fill, Backfill and Landscaping No soil found on Site, or transported to the Site from remote locations, which contains debris or waste or Hazardous Materials shall be used for fill, backfill or landscaping topsoil.

  • Selection of Subcontractors, Procurement of Materials and Leasing of Equipment The contractor shall not discriminate on the grounds of race, color, religion, sex, national origin, age or disability in the selection and retention of subcontractors, including procurement of materials and leases of equipment. The contractor shall take all necessary and reasonable steps to ensure nondiscrimination in the administration of this contract.

  • Road Surfaces (1) Grade, shape, crown, and/or outslope surface and shoulders.

  • Surface  Grade and shape the road surface, turnouts, and shoulders to the original shape on the TYPICAL SECTION SHEET. Inslope or outslope as directed to provide a smooth, rut-free traveled surface and maintain surface water runoff in an even, unconcentrated manner.  Blading shall not undercut the backslope or cut into geotextile fabric on the road.  If required by the Contract Administrator, water shall be applied as necessary to control dust and retain fine surface rock.  Surface material shall not be bladed off the roadway. Replace surface material when lost or worn away, or as directed by the Contract Administrator.  Remove shoulder berms, created by grading, to facilitate drainage, except as marked or directed by the Contract Administrator.  For roads with geotextile fabric: spread surface aggregate to fill in soft spots and wheel ruts (barrel spread) to prevent damage to the geotextile fabric.

Time is Money Join Law Insider Premium to draft better contracts faster.