Bridge Design Sample Clauses

Bridge Design. 1. BRIDGE LAYOUT The Engineer shall prepare the bridge layout plan sheet. The Engineer shall determine the location of each soil boring needed for foundation design in accordance with the Geotechnical Manual. The Engineer shall submit each bridge layout early in the plan preparation process to obtain approval from the State. The Engineer shall comply with all relevant sections of the latest edition of the State’s Load and Resistance Factor Design (LRFD) Bridge Design Manual, Bridge Project Development Manual, Bridge Detailing Manual, and AASHTO LRFD Bridge Design Specifications and respective checklists. Each bridge layout sheet must include bridge typical sections, structural dimensions, abutment and bent locations, superstructure and substructure types. The existing and proposed headwater (HW) elevations for the 1% AEP and the design frequency shall be included in the profile view. The Engineer shall locate and plot all soil borings and utilities, show proposed retaining walls, and, for staged construction, indicate limits of existing bridge for removal and reconstruction.
AutoNDA by SimpleDocs
Bridge Design. The State will prepare or provide:
Bridge Design. 3.3.2.1.1Bridge Geometrics Bridge geometrics shall be developed in accordance with the roadway design
Bridge Design a) The Engineer shall perform bridge design required for any roadway crossings to the proposed improvements to the existing channels and/or proposed channels of the Project. The design of these bridges shall conform to the Project design criteria required by the Owner (City, County, or State), of the associated -bridge structure and/or roadway, and the requirements set forth by the American Association of State Highway and Transportation Officials (AASHTO), "Standard Specifications for Highway Bridges" and Texas Department of Transportation Design Manual, latest editions. These designs shall in all respects combine the application of sound engineering principles with a high degree of economy, and shall be submitted to the applicable City, County, State, and/or Federal agencies for approval.
Bridge Design. A. Bridge Layout
Bridge Design. This task describes work to complete base bridge contract documents, consisting of plans, specifications, calculations for Level 1 design criteria, and estimates for each bridge. Results/Deliverables The deliverables to be developed under this section are as follows: • Stage 1 o Level One Checklist and Computations o Design Information o Quantity Calculations and Preliminary Opinion of Probable Cost Preliminary Field Check Plans with the following modifications: o Incorporate Preliminary Field Check plans comments o Complete project-information boxes, including right-of-way project number and sheet numbers o Complete sheet-numbers cross references o Review plans against the checklist shown as IDM Figure 85-2F o Stage 3 Review Submission The Stage 3 plans shall be approximately 95% complete and include the following items: o Incorporation of PFC review comments o Final Plans Documentation o Plan Detail Sheets and associated tables o Temporary erosion control o Plan Bridge Sheets and associated tables ▪ Soil Boring Sheet ▪ Layout Sheet ▪ General Plan Sheet ▪ Wingwall and Headwall Detail Sheet o Level One Checklists and Design Computations o Unique and Recurring Special Provisions o Opinion of Probable Construction Cost o Permit drawing development and coordination o QA/QC o Tracings Plan Submission The design shall be progressed to 100% design level for this submission. The following shall be prepared for this submission: o Incorporation of Stage 3 review comments o Incorporation of Pavement Design o Final Tracings Documentation o Level One Checklists and Design Computations o Unique and Recurring Special Provisions o Opinion of Probable Construction Cost o QA/QC
Bridge Design. If necessary, design a bridge structure to cross potential wetlands along the proposed ROW alignment will be designed for HL-93 loading or greater. The design will include all supporting calculations for the structure including geometry, structural design, layout sheets and details. The bridge will be 4 lanes (two lane in each direction). We will also provide two (2) borings 80’ in depth for the bridge design. The fee for this item is included in the base geotechnical fee.
AutoNDA by SimpleDocs
Bridge Design. The Engineer shall perform bridge design at the following locations;  SH 46 ( 2 Bridges: Cross Street and East Side Turnaround)  WBFR at Xxxxxx Creek Tributary (1 Bridge: 710’)  Main St. (2 Bridges)  Balcones Creek ( 2 Bridges: EBFR and WBFR) DocuSign Envelope ID: 00030A7D-3D10-434B-B077-86515E98EAAF Contract No. 15-6SDP5007 PS Contract Xx. 0000  Xxxxxxxx Xxxxx Xx. (0 Xxxxxx)  Fair Oaks Pkwy ( 1 Bridge: West Side Turnaround) Or other locations located within the projects limits, as needed, at the written request of the State’s Project Manager to be considered as supplemental agreement.
Bridge Design. The ENGINEER will prepare a bridge layout and structural details for a three span, four (4) lane divided Bridge 12 ft. widening. The ENGINEER will prepare a 30% submittal to TxDOT consisting of bridge plan, elevations and sections for review and approval before detailing is started. The ENGINEER will perform final design of preferred foundation type for bridge structure in accordance with the TxDOT’s Bridge Division Geotechnical Manual and Geotechnical design report recommendations. The ENGINEER will perform interim review and final, detailed designs in accordance with the current TxDOT Bridge Design Manual and 2020 AASHTO LRFD 9th Edition design requirements utilizing a conventional precast, prestressed concrete U-Beam superstructure and conventional reinforced concrete xxxxx with conventional substructures. The ENGINEER will perform final, detailed bridge design utilizing cast-in-place concrete deck and prestressed concrete U-Beam superstructure and multicolumn reinforced concrete xxxxx and abutments. The ENGINEER will produce summary tables of all bridge structure quantities, provide beam end bearing seat elevations tables and provide bent and abutment control elevations. The ENGINEER will prepare the bridge construction General Notes and Specifications and transmit these documents to the COUNTY. The bridge layouts will include: Plan View
Bridge Design. 160.H.1 1. Bridge Layouts. design Crash Wall detail at Sonterra 1 4 20 25 $3,628.72 160. I I. FREEWAY TRAFFIC MANAGEMENT add camera at sonterra 1 4 16 24 45 $6,542.64 160.J J. Prepare a Utility Management Plan a. Memo for TxDOT signature 8 12 60 8 88 $18,149.20 b. Utility Certification 0 0 0 c. Schedule showing Additional Activities 0 0 0 0 d. Redlines of plans showing contract elements that were in conflict with unclear utility 2 8 24 34 $5,380.32 e. Sheets to be updated through addendum to show a viable construction plan that allows the contractor work to continue. 8 24 8 40 $5,762.32 0 73 288 61 198 741 366 ‐13 0 28 28 1,770 $257,211.34 DocuSign Envelope ID: ED7DF0BF-CED8-459B-BD20-D429F09B7CE5 Contract No. 15-6SDP5001 Supplemental Agreement No. 3 Attachment E-3 Fee Schedule PS Contract No. 5026 Highway: US 281 ‐ From LP 1604 to Stone Oak Prkwy CSJ: 0253‐04‐146 County: Bexar Prime Provider: HNTB Corporation BASIS SERVICES $ 218.27 $ 300.12 $ 245.55 $ 204.63 $ 152.79 $ 117.32 $ 65.48 $ 163.70 Task Descriptions Principal Senior Program Manager Task Manager Senior Engineer Project Engineer Design Engineer Admin / Clerical Senior Environmental Scientest / Planner Total Hours Total Cost 300 FUNCTION CODE 300 – DESIGN VERIFICATION, CHANGES AND ALTERATIONS
Time is Money Join Law Insider Premium to draft better contracts faster.