Boundary Markers Sample Clauses

Boundary Markers. The boundaries of the Tract shall be marked with permanent surveyor monuments. The monuments shall be placed at each corner of the Tract and in such additional xxxxxxxxx.xx the shape of the Tract requires for clear designation of all boundary lines. In addition, the corners of all lots within the subdivision shall be "pinned" in a manner deemed sufficiently permanent by the Township Engineer. All such monuments and pins shall be placed by a registered surveyor and shall be visible when final grading has been completed and before any occupancy permit is issued. Developer shall provide the Township with a plan showing the accurate placement of said monuments and pins, which shall be certified by Developer's registered surveyor.
AutoNDA by SimpleDocs
Boundary Markers. Where line of sight does not afford seeing a boundary line marking in either direction due to the absence of trees or existing man made markers, and in areas adjacent to developed property, wooden 4”x4” posts with the appropriate decal will be placed at intervals adequate to see markers in either direction of the line. If posts are used they will be painted in accordance with Appendix Q.

Related to Boundary Markers

  • Boundary Line Fires Both Parties shall have responsibility for Initial Attack in the case of a Boundary Line Fire. Neither Party will assume the other is aware of the fire, or is taking action. The officer-in-charge who arrives first at the boundary line fire will act as Incident Commander. When both Parties have arrived, they will mutually agree to the designation of the Incident Commander or the initiation of a Unified Command Structure.

  • Basement Any leaks or evidence of moisture? Yes No Unknown Does Not Apply Comments:

  • ROAD DIMENSIONS Purchaser shall perform road work in accordance with the dimensions shown on the TYPICAL SECTION SHEET and the specifications within this road plan.

  • Road Surfaces (1) Grade, shape, crown, and/or outslope surface and shoulders.

  • Pavement Design If applicable, the Engineer shall incorporate the pavement design developed by the State for this project. If the pavement design is not available, the State may request the Engineer to perform pavement design and submit to State for review and approval.

  • Crossing Picket Lines The Company will not expect an employee to cross a picket line, including a picket line at a customer site, if to do so would place the employee's life, limb or personal property in jeopardy.

  • Terminals Hartford Terminal. Hartford Terminal is located at or near Hartford, Illinois. The facility consists of a two-bay truck rack with 17,000 barrels of active terminaling capacity, 13 above-ground storage tanks with approximately 1.1 million barrels of total storage capacity. The Hartford barge dock consists of a single-berth barge loading facility, approximately 0.8 miles of 8-inch pipeline and approximately 0.8 miles of 14-inch pipeline from the Hartford terminal to the Hartford barge dock for delivery.

  • Porcupine Site Highway 11

  • Pavement The combined surface course, base course, and subbase course, if any, considered as a single unit.

  • Exterior Drainage Does water stand on the property for more than 24 hours after a heavy rain? Yes No Unknown Comments Are gutters and downspouts in good repair? Yes No Unknown Comments:

Time is Money Join Law Insider Premium to draft better contracts faster.