BIM Manual Sample Clauses

BIM Manual. The “Detailed BIM Strategy” should bring together the output from the above steps and document the results in a structured (possibly online) BIM Manual. Contents of which should include: • Principles and Goals -The principles of the “Detailed BIM Strategy” and the Objectives and Goals that Rail Baltica wish to achieve. • Suppliers Competency Framework • Suppliers Technical Systems Questionnaires • Suppliers CDE Processes • Tabulated Information Delivery Requirements against Disciplines, Projects and Stage by Stage • BIM Execution Plan (BEP) Templates describing the concept and content of the BEP, which explains proposals on how the information requirements will be delivered by the designer and contractor.
AutoNDA by SimpleDocs

Related to BIM Manual

  • Project Manual A bound manual prepared by the Design Professional. It includes the Invitation to Bid, Instructions to Bidders, the Bid Form, the Specifications, the General Conditions and Supplementary General Conditions.

  • Provider Manual The Provider Manual shall be a comprehensive online reference tool for the Provider and staff regarding, but not limited to, administrative, prior authorization, and referral processes, claims and encounter submission processes, continuity of care requirements, and plan benefits. The Provider Manual shall also address topics such as clinical practice guidelines, availability and access standards, care management programs and Enrollee rights.

  • Policy Manual The bargaining agent shall be furnished, upon request, a current copy of any official policy of the employer relating to the terms or conditions of employment of employees in the bargaining unit.

  • Operational Manual (a) The Multiplex Licensee agrees to develop an operational manual in consultation with all Access Seekers to deal with technical and operational matters that arise under or in connection with this Agreement, or the supply of the Multiplex Transmission Service (Operational Manual).

  • Maintenance Manual No later than 60 (sixty) days prior to the Project Completion Date, the Contractor shall, in consultation with the Authority’s Engineer, evolve a maintenance manual (the “Maintenance Manual”) for the regular and preventive maintenance of the Project Highway in conformity with the Specifications and Standards, safety requirements and Good Industry Practice, and shall provide 5 (five) copies thereof to the Authority’s Engineer. The Authority’s Engineer shall review the Maintenance Manual within 15 (fifteen) days of its receipt and communicate its comments to the Contractor for necessary modifications, if any.

  • Operations Manual The Franchisor agrees to loan to the Franchisee one or more manuals, technical bulletins, cookbooks and recipes and other written materials (collectively referred to as “Operations Manual”) covering Factory Candy ordering, Store Candy manufacturing, processing and stocking and other operating and in-store marketing techniques for the ROCKY MOUNTAIN CHOCOLATE FACTORY Store. The Franchisee agrees that it shall comply with the Operations Manual as an essential aspect of its obligations under this Agreement, that the Operations Manual shall be deemed to be incorporated herein by reference and failure by the Franchisee to substantially comply with the Operations Manual may be considered by the Franchisor to be a breach of this Agreement.

  • Project Implementation Manual The Recipient, through the PCU, shall: (i) take all action required to carry out Parts 1.1, 1.3, 1.4, 2, 3.1(b), 3.2, 3.3 and 4 (ii) of the Project in accordance with the provisions and requirements set forth or referred to in the Project Implementation Manual; (ii) submit recommendations to the Association for its consideration for changes and updates of the Project Implementation Manual as they may become necessary or advisable during Project implementation in order to achieve the objective of Parts 1.1, 1.3, 1.4, 2, 3.1(b), 3.2, 3.3 and 4(ii) of the Project; and (iii) not assign, amend, abrogate or waive the Project Implementation Manual or any of its provisions without the Association’s prior agreement. Notwithstanding the foregoing, if any of the provisions of the Project Implementation Manual is inconsistent with the provisions of this Agreement, the provisions of this Agreement shall prevail and govern.

  • Technical Specification As enumerated in Special Conditions of Contract/Scope of Work/attached Drawing/ Details/Schedule of Rates.

  • HIV/AIDS Model Workplace Guidelines Grantee will:

  • Technical Specifications The Technical Specifications furnished on the CD are intended to establish the standards for quality, performance and technical requirements for all labor, workmanship, material, methods and equipment necessary to complete the Work. When specifications and drawings are provided or referenced by the County, these are to be considered part of the Scope of Work, and to be specifically documented in the Detailed Scope of Work. For convenience, the County supplied specifications, if any, and the Technical Specifications furnished on the CD.

Time is Money Join Law Insider Premium to draft better contracts faster.