BID SUBMITTALS Sample Clauses

BID SUBMITTALS. 2.1 Vendor must submit their bid and all attachments via the City/County e-bid system.
AutoNDA by SimpleDocs
BID SUBMITTALS. 1. Bidders are solely responsible for ensuring that their submittals are complete, uploaded and submitted in the VendorLink system by the bid due date and time. The City shall not be responsible for any submission delays or failures caused by any occurrence. Bidders are expected to examine this solicitation, specifications, associated drawings, if any, and all instructions. Failure to do so will be at the Bidder's risk. Each Bidder shall furnish the information required on each bid submittal form and each accompanying sheet thereof on which an entry is made. The following items must be completed and uploaded as part of your electronic bid submittal. Failure to complete and return required forms may result in your bid being deemed non-responsive and not considered for award.
BID SUBMITTALS. An ORIGINAL and Two (2) copies of each bid must be submitted. No other distribution of the bids will be made by the Contractor. Bids must be signed by an official authorized to bind the Contractor to its provisions. FAILURE TO SUBMIT PRICING ON THE BID FORM PROVIDED BY THE CITY OF NOVI MAY CAUSE THE BID TO BE CONSIDERED NON-RESPONSIVE AND INELIGIBLE FOR AWARD.

Related to BID SUBMITTALS

  • BID SUBMISSION All Bids are to be packaged, sealed and submitted to the location stated in the Bid Specifications. Bidders are solely responsible for timely delivery of their Bids to the location set forth in the Bid Specifications prior to the stated Bid opening date/time. A Bid return envelope, if provided with the Bid Specifications, should be used with the Bid sealed inside. If the Bid response does not fit into the envelope, the Bid envelope should be attached to the outside of the sealed box or package with the Bid inside. If using a commercial delivery company that requires use of their shipping package or envelope, Bidder’s sealed Bid, labeled as detailed below, should be placed within the shipper’s sealed envelope to ensure that the Bid is not prematurely opened. All Bids must have a label on the outside of the package or shipping container outlining the following information: “BID ENCLOSED (bold print, all capitals) • Group Number • IFB or RFP Number • Bid Submission date and time” In the event that a Bidder fails to provide such information on the return Bid envelope or shipping material, the receiving entity reserves the right to open the shipping package or envelope to determine the proper Bid number or Product group, and the date and time of Bid opening. Bidder shall have no claim against the receiving entity arising from such opening and such opening shall not affect the validity of the Bid or the procurement. Notwithstanding the receiving agency’s right to open a Bid to ascertain the foregoing information, Bidder assumes all risk of late delivery associated with the Bid not being identified, packaged or labeled in accordance with the foregoing requirements. All Bids must be signed by a person authorized to commit the Bidder to the terms of the Bid Documents and the content of the Bid (offer).

  • Submittals Submittals required by the Contract Documents shall be prepared specifically for the Work by the Contractor to illustrate some portion of the Work. Submittals are not Contract Documents.

  • Required Submittals Complete shop drawings and manufacturer’s catalog data shall be submitted to the State and approved by the State prior to start of any construction work. Power and lighting panel configuration shall be complete with schedule of branch panels, separate disconnects, and circuit breakers, based on calculated and estimated motor, resistive and lighting loads. All circuits shall be labeled at the panel and at the outlet/power pole for future reference. Location of all electrical receptacles and telephone outlets (including power drops for the systems furnishings) shall be designated on a block floor plan showing the systems furnishings layout provided by the State. Said block floor plan shall be furnished by the State to the Owner/Lessor no later than 4 weeks after approved construction plans are received by the State.

  • Invoice Submittal DEO shall reimburse Subrecipient in accordance with Section 6, above. In accordance with the Funding Requirements of s. 215.971(1), F.S. and Section 21 of this Agreement, Subrecipient and its subcontractors may only expend funding under this Agreement for allowable costs resulting from obligations incurred during this Agreement. To be eligible for reimbursement, costs must be in compliance with laws, rules and regulations applicable to expenditures of State funds, including, but not limited to, the Reference Guide for State Expenditures (xxxxx://xxx.xxxxxxxxxxxx.xxx/Division/AA/Manuals/documents/ReferenceGuideforStateExpenditures.pdf).

  • Review of Submittals A/E and ODR review is only for conformance with the design concept and the information provided in the Contract Documents. Responses to submittals will be in writing. The approval of a separate item does not indicate approval of an assembly in which the item functions. The approval of a submittal does not relieve the Contractor of responsibility for any deviation from the requirements of the Contract unless the Contractor informs the A/E and ODR of such deviation in a clear, conspicuous, and written manner on the submittal transmittal and at the time of submission, and obtains the A/E’s and Owner’s written specific approval of the particular deviation.

  • PROPOSAL SUBMISSION 1. Timely Proposal Submittal. Proposals must be submitted as described herein to the Purchasing & Contracting Department (P&C).

  • Invoice Submission The Contractor shall accept payment of invoices via EFT. Invoice submission information shall be contained in each individual Order. Payment of invoices will be made by the payment office designated in each individual Order.

  • Submittal Review 7.10.1 The A/E shall review Submittals such as Shop Drawings, Product Data, and Samples for conformity with design intent and conformity with the Contract Documents within 14 days of receiving Submittals or in accordance with the approved submittal schedule, or other period as mutually agreed by the A/E and Contractor.

  • Contractor’s Submittals The Contract shall submit with reasonable promptness consistent with the Work Project Schedule and in orderly sequence all Shop Drawings, Samples, or other information required by the Contract Documents, or subsequently required by Change Order. Prior to submitting, the Contractor shall review each submittal for compliance with the Contract Documents and certify its approval by an approval stamp affixed to each copy. Submittal data presented without the Contractor’s certification will be returned without review or comment, and any delay resulting from such certification is the Contractor's responsibility.

  • REPORT SUBMISSION 1. Copies of reporting packages for audits conducted in accordance with 2 CFR Part 200, Subpart F-Audit Requirements, and required by PART I of this form shall be submitted, when required by 2 CFR 200.512, by or on behalf of the recipient directly to the Federal Audit Clearinghouse (FAC) as provided in 2 CFR 200.36 and 200.512

Time is Money Join Law Insider Premium to draft better contracts faster.