Berthing Sample Clauses

Berthing. 7.4.1 After a Notice of Readiness has been tendered, the Operator shall permit and the User shall cause the LNG Vessel to proceed to berth at the Terminal as expeditiously as is safely possible.
AutoNDA by SimpleDocs
Berthing. No vessel shall be berthed or unberthed without the permission of the Marine Manager.
Berthing. A master of a vessel shall not berth or unberth the vessel within the jetty and berth area or cause or allow it to be so berthed or unberthed without the prior permission of the Marine Supervisor.
Berthing. 7.1 The Customer shall cause the LNG Carrier to berth and depart as safely and expeditiously as reasonably possible and in accordance with the relevant Terminal Rules and Schedule 1 (Inventory Management).
Berthing. 3.1 Vessels must be moored using the roping and dockside cleat procedures as recommended in rule 22 of these Marina Rules.
Berthing. Unless otherwise specifically agreed in writing, the Contractor does not guarantee any berthing priority to any vessel of the Client or the carrier. In no event shall the Contractor be liable for the inadequacy of berthing facilities. The Contractor does not guarantee the accuracy of any information relating to berth depth provided by it to the Client, whether in port particulars or upon request. The Client expressly accepts that any information relating to berth depth is approximate and subject to change and is communicated by Contractor without guarantee. The Client further expressly agrees that Contractor shall not be liable for damage or loss arising out of the inaccuracy of the berth depth information provided. PART III
AutoNDA by SimpleDocs
Berthing. Provide berth on arrival for all Customer container ships arriving on schedule, details of the berth allocation planning and scheduling is at APMT’s sole discretion. APMT will advise Customer should any modification of planned berthing be arranged.
Berthing. Customer shall comply with APMT’s berthing requirements. Customer container ship shall vacate the berth without undue delay upon completion of operations and receipt of the documents set out at Clause 2.5.

Related to Berthing

  • Scope of Interconnection Service 1.3.1 The NYISO will provide Energy Resource Interconnection Service to Interconnection Customer at the Point of Interconnection.

  • Commencement of Interconnection Activities If the Developer executes the final LGIA, the ISO, Connecting Transmission Owner and the Developer shall perform their respective obligations in accordance with the terms of the LGIA, subject to modification by FERC. Upon submission of an unexecuted LGIA in accordance with Section 30.11.3, the Parties shall promptly comply with the unexecuted LGIA, subject to modification by FERC.

  • Configuration Management The Contractor shall maintain a configuration management program, which shall provide for the administrative and functional systems necessary for configuration identification, control, status accounting and reporting, to ensure configuration identity with the UCEU and associated cables produced by the Contractor. The Contractor shall maintain a Contractor approved Configuration Management Plan that complies with ANSI/EIA-649 2011. Notwithstanding ANSI/EIA-649 2011, the Contractor’s configuration management program shall comply with the VLS Configuration Management Plans, TL130-AD-PLN-010-VLS, and shall comply with the following:

  • Firefighters Any truck with an inoperative aerial ladder shall be regularly and routinely staffed with one (1) officer and five (5) firefighters for the period of time that the aerial ladder is inoperative, or until such time as the truck with the inoperative aerial ladder is replaced with a truck with an operative aerial ladder. At 0800 and 2000 hours, all trucks shall be staffed with one (1) officer and four (4) firefighters, and any truck with an inoperative aerial ladder shall be staffed with one (1) officer and five (5) firefighters.

  • of Interconnection 2.1.1 Each Party, at its own expense, shall provide transport facilities to the technically feasible Point(s) of Interconnection on Verizon’s network in a LATA selected by ENT.

  • Network Interconnection 26.1 Interconnection between the networks of different SERVICE PROVIDERs shall be as per National Standards of CCS No.7 issued from time to time by Telecom Engineering Centre (TEC) and also subject to technical feasibility and technical integrity of the Networks and shall be within the overall framework of interconnection regulations issued by the TRAI from time to time. However, if situation so arises, INTERCONNECTION with R2MF signaling may be permitted by LICENSOR.

  • Connecting Transmission Owner’s Scope of Work and Responsibilities The Connecting Transmission Owner will design, construct, own, operate and maintain all Connecting Transmission Owner’s Interconnection Facilities, except as otherwise stated above and in the Project Specific Specifications. The Connecting Transmission Owner will complete all engineering reviews, field verifications and witness testing, etc. in accordance with the ESBs and the Project Specific Specifications. Connecting Transmission Owner shall provide the revenue metering CT/PT units and meter socket enclosure. The Connecting Transmission Owner shall:  provide, run, and wire both ends of the color-coded cable for the revenue metering instrument transformer secondary wiring;  perform all terminations; and  supply and install the meter. The revenue meter may require a communications link to the RTU. The Connecting Transmission Owner will specify and run those communications cables. The Connecting Transmission Owner shall complete all wiring, testing and commissioning of the RTU.

  • Network Interconnection Architecture Each Party will plan, design, construct and maintain the facilities within their respective systems as are necessary and proper for the provision of traffic covered by this Agreement. These facilities include but are not limited to, a sufficient number of trunks to the point of interconnection with the tandem company, and sufficient interoffice and interexchange facilities and trunks between its own central offices to adequately handle traffic between all central offices within the service areas at P.01 grade of service or better. The provisioning and engineering of such services and facilities will comply with generally accepted industry methods and practices, and will observe the rules and regulations of the lawfully established tariffs applicable to the services provided.

  • SS7 Network Interconnection 9.7.1 SS7 Network Interconnection is the interconnection of Global Connection local signaling transfer point switches or Global Connection local or tandem switching systems with BellSouth signaling transfer point switches. This interconnection provides connectivity that enables the exchange of SS7 messages among BellSouth switching systems and databases, Global Connection local or tandem switching systems, and other third-party switching systems directly connected to the XxxxXxxxx XX0 network.

  • Interconnection Service Interconnection Service allows the Interconnection Customer to connect the Large Generating Facility to the Participating TO’s Transmission System and be eligible to deliver the Large Generating Facility’s output using the available capacity of the CAISO Controlled Grid. To the extent the Interconnection Customer wants to receive Interconnection Service, the Participating TO shall construct facilities identified in Appendices A and C that the Participating TO is responsible to construct. Interconnection Service does not necessarily provide the Interconnection Customer with the capability to physically deliver the output of its Large Generating Facility to any particular load on the CAISO Controlled Grid without incurring congestion costs. In the event of transmission constraints on the CAISO Controlled Grid, the Interconnection Customer's Large Generating Facility shall be subject to the applicable congestion management procedures in the CAISO Tariff in the same manner as all other resources.