Bathymetric Surveys. The USACE will provide BOEM with pre- and post-dredging bathymetric surveys of the borrow area. BOEM recommends that the pre-dredging survey of the Borrow Area be conducted within 90 days prior to dredging for each Borrow Area. However, the surveys will not be conducted before a notice to proceed is issued by USACE to the dredge contract for work in each Borrow Area. The post-dredging survey of each borrow area will be conducted within 30 days after the completion of dredging. BOEM recommends that USACE conduct additional bathymetric surveys of the Borrow Area as part of the MsCIP Monitoring and Adaptive Management Program five (5) and ten (10) years after the completion of dredging to document borrow area evolution and provide information to inform future decisions and consultations regarding the use of OCS sand resources. Surveys, error analysis, and reporting will be performed in accordance with the most recent edition of USACE’s Hydrographic Surveying Manual EM 0000-0-0000 unless specified otherwise. For bathymetric surveys, 100 percent coverage using interferometric swath or multibeam bathymetric survey methods is required. All bathymetric data will be roll, pitch, heave, and tide corrected using best practices. Sound velocity corrections will be applied based on measurements made during and throughout the duration of the survey using a profiling sound velocity meter to obtain water column sound velocities with casts that log the entire water column to the seafloor. Survey lines of the specific dredge area will be established at intervals necessary to provide 100 percent coverage. All survey lines will extend at least 100 meters (328 feet) beyond the edge of the Borrow Area’s limits (including Allowable Anchorage Area; Attachment 1) as defined in this MOA. All data will be collected in such a manner that post-dredging bathymetric surveys are compatible with the pre-dredging bathymetric survey data to enable the latter to be subtracted from the former to calculate the volume of material removed, shape of the excavation, and nature of post-dredging bathymetric change. Pre-dredge bathymetric survey transects will be reoccupied during the post-dredging surveys. Surveys will be conducted using kinematic GPS referenced to a GPS base station occupying an established (NAVD 88 vertical control) monument within 15 kilometers (9 miles) of the survey area, a National Geodetic Survey real-time network, or a water-level gauge deployed within the vicinity of the Bor...
AutoNDA by SimpleDocs
Bathymetric Surveys. Xxxxxxx County and/or its agents will provide BOEM with pre- and post-dredging bathymetric surveys of Borrow Area T-1. The pre-dredging survey will be conducted within 60 days prior to dredging. The post-dredging survey will be conducted within 60 days after the completion of dredging. If, within the next 1 to 3 years, the County conducts any bathymetric surveys of Borrow Area T-1, copies of the survey(s) will be provided to BOEM. Hydrographic surveys will be performed in accordance with the USACE Hydrographic Surveying Manual EM 1110-2- 1003, providing 100 percent seamless coverage using interferometric swath or multibeam bathymetry. All bathymetric data will be roll, pitch, heave, and tide corrected using accepted practices. Three equidistant cross-tie lines will be established parallel to the same baseline. All survey lines will extend at least 50 meters beyond the edge of the dredge areas. All data will be collected in such a manner that post-dredging bathymetry survey data is compatible with the pre- dredging bathymetric survey data to enable the latter to be subtracted from the former to calculate the volume of sand removed, the shape of the excavation, and nature of post-dredging bathymetric change. Copies of pre- and post-dredging hydrographic data will be submitted to BOEM via xxxxxxxxxx@xxxx.xxx within thirty (30) days after each survey is completed. The delivery format for data submission is an ASCII file containing x, y, and z data. The horizontal data will be provided in the North American Datum of 1983 (NAD ’83) Florida State Plane, U.S. survey feet. Vertical data will be provided in the North American Vertical Datum of 1988 (NAVD ’88), U.S. survey feet unless otherwise specified. An 8.5-x-11-inch plan view plot of the survey track points, as well as contour lines, will be provided at appropriate elevation intervals. These plots will be provided in PDF format. Survey metadata will also be provided.
Bathymetric Surveys. Soundings using a multibeam echosounder system shall be used for all required surveys (i.e., pre-dredge, post-dredge, and progress surveys).
Bathymetric Surveys. Geosyntec will subcontract Xxxxxxx Marine to perform bathymetric surveys for the areas downstream of the spillways and powerhouses of Xxxxxx and Superior Dams. Xxxxxxx Marine will use a multi-beam echosounder to perform the bathymetric surveys in areas that can be accessed by the echosounder, but also plans to bring equipment to perform land surveys in regions where a surface vessel cannot be used due to shallow water (e.g., spillway apron of Xxxxxx Dam). Geosyntec proposes performing the bathymetric surveys prior to the field inspections. The surveys will be reviewed by Geosyntec prior to the field inspections to identify any areas of potential concern (i.e., areas exhibiting settlement or scour) to be evaluated further during the field inspections and future dive inspections.

Related to Bathymetric Surveys

  • Topographic Survey 3.1 Notify affected property owners of pending survey.

  • EU SURVEY 5.1. The participant shall complete and submit the online EU Survey after the mobility abroad within 30 calendar days upon receipt of the invitation to complete it.

  • Geotechnical Engineer « »« » « » « » « » « »

  • Information Technology Enterprise Architecture Requirements If this Contract involves information technology-related products or services, the Contractor agrees that all such products or services are compatible with any of the technology standards found at xxxxx://xxx.xx.xxx/iot/2394.htm that are applicable, including the assistive technology standard. The State may terminate this Contract for default if the terms of this paragraph are breached.

  • Geotechnical Investigation Perform in accordance with the City Design Manual and other City requirements as designated in writing by the Director.

  • Surveys Each Borrower shall submit the Ship owned by it regularly to all periodical or other surveys which may be required for classification purposes and, if so required by the Security Trustee provide the Security Trustee, with copies of all survey reports.

  • Value Engineering The Supplier may prepare, at its own cost, a value engineering proposal at any time during the performance of the contract. The value engineering proposal shall, at a minimum, include the following;

  • Ergonomic Assessments ‌ At the request of the employee, the Employer will ensure that an ergonomic assessment of the employee’s work station is completed by a person trained to conduct ergonomic assessments. Solutions to identified issues/concerns will be implemented within available resources.