BASIS OF BID Sample Clauses

BASIS OF BID. 5.01 Bidder will complete the Work in accordance with the Contract Documents for the following price(s):
AutoNDA by SimpleDocs
BASIS OF BID. 5.01 Bidder will complete the Work in accordance with the Contract Documents for the following price(s): BID SCHEDULE (Unit Price Bid) Item No. Description Unit Estimated Quantity Bid Unit Price Bid Price 1 Mobilization and Bonding LS 1 2 Remove Existing Curb and Gutter LF 1538 3 Remove Existing Sidewalk SY 1681 4 Mill Existing Asphalt, incorporate into subgrade SY 3755 5 Unclassified Excavation and Haul CY 4950 6 Geotextile Fabric SY 4300 7 Tensar TX Geogrid (as needed) SY 1 8 Pipe Bedding TON 270 9 Trench Stabilization – (as needed) LF 1 10 Installation -2” diameter Communication Conduit and pull boxes LF 1800 11 8” Thick Concrete Pavement SY 193 12 6” Thick Concrete Pan/Pavement SY 150 13 4” Thick Concrete Sidewalk SY 1400 14 6” Curb and 1.5’ Gutter LF 1751 15 24” Diameter ADS N-12 Storm Drain Pipe LF 465 16 10” Diameter ADS N-12 Storm Drain Pipe LF 178 17 12” Diameter C-900 PVC Pressure Pipe LF 170 18 Storm Drain Inlets EA 7 19 4’ x 4’ Storm Drain Manholes EA 1 20 6’ x 4’ Storm Drain Manholes EA 1 21 Adjust Manhole Rims and Valves LS 1 Continued on page 4 Item No. Description Unit Estimated Quantity Bid Unit Price Bid Price Continued from page 3 23 6” Diameter C—900 PVC Water Main Pipe LF 310 24 8” Diameter C-900 PVC Water Main Pipe LF 55 25 Lower Water Main EA 5 26 10” Diameter SDR 35 PVC Sewer Pipe LF 65 27 Dewatering (includes Storm Drain and Force Main LF 635 28 Signing & Striping LS 1 29 Traffic Control LS 1 BID ONE OF THE FOLLOWING ALTERNATIVES Alternative 1Asphalt Pavement A1-1 Imported Pit Run TON 7100 A1-2 6” CDOT Class 5 Aggregate Base Course TON 1070 A1-3 Hot Bituminous Pavement – Grading S TON 726 Alternative 2 – Concrete Pavement A2- 1 Imported Pit Run TON 5690 A2- 2 6” CDOT Class 5 Aggregate Base Course TON 1070 Total of All Unit Price Bid Items $ Bidder acknowledges that (1) each Bid Unit Price includes an amount considered by Bidder to be adequate to cover Contractor’s overhead and profit for each separately identified item, and (2) estimated quantities are not guaranteed, and are solely for the purpose of comparison of Bids, and final payment for all unit price Bid items will be based on actual quantities, determined as provided in the Contract Documents. TOTAL BID PRICE $ (written in words)
BASIS OF BID. 5.01 Bidder will complete the Work in accordance with the Contract Documents for the following price(s): BID SUBMISSION OPTION A: For all Work, complete, as specified and / or shown on Contract Documents, the sum of: Dollars OPTION B: For all Work, complete, as specified and / or shown on Contract Documents, the sum of: Dollars All dollar amounts presented in this BID FORM shall remain firm for the duration of the Project.
BASIS OF BID. 4.01 Bidder will furnish the Goods and Special Services in accordance with the Purchase Order Agreement Documents for the prices shown in the attached Exhibit A:
BASIS OF BID. 5.01 Bidder will complete the Work in accordance with the Contract Documents for the price(s) shown on the attached bid sheet. (Engineer will determine and select the method below and insert bid schedule after this page, numbering it 3a, 3b, 3c…….): □ Lump Sum bid sheet is attached. □ Unit price bid sheet is attached and the following applies:
BASIS OF BID. 5.01 Bidder will complete the Work in accordance with the Contract Documents for the following price(s): Plans and Specifications Provided TOTAL BASE BID PRICE $ (USE WORDS) (USE NUMBERS) Bidder acknowledges that (1) each Bid Unit Price includes an amount considered by Bidder to be adequate to cover Contractor’s overhead and profit for each separately identified item, and (2) estimated quantities are not guaranteed, and are solely for the purpose of comparison of Bids, and final payment for all unit price Bid items will be based on actual quantities, determined as provided in the Contract Documents.
BASIS OF BID. 5.01 Bidder will complete the Work in accordance with the Contract Documents for the following price(s): BID SUBMISSION OPTION A: For all Work, complete, as specified and / or shown on Contract Documents, the sum of: Dollars OPTION B: For all Work, complete, as specified and / or shown on Contract Documents, the sum of: Dollars OPTION C: For all Work, complete, as specified and / or shown on Contract Documents, the sum of: Dollars OPTION D: For all Work, complete, as specified and / or shown on Contract Documents, the sum of: Dollars OPTION E: For all Work, complete, as specified and / or shown on Contract Documents, the sum of: Dollars All dollar amounts presented in this BID FORM shall remain firm for the duration of the Project.
AutoNDA by SimpleDocs
BASIS OF BID. 5.01 Bidder will complete the Work in accordance with the Contract Documents for the following price(s): DESCRIPTION Total Price Total of all unit prices as listed in the PennBID Bid Form ($ ) Allowance ($700,000) SEPTA Allowance ($15,000) TOTAL OF ALL ESTIMATED PRICES ON PENNBID BID FORM PLUS THE TWO ALLOWANCES: in writing ($ ) Figures Bidder acknowledges that (1) each Bid Unit Price includes an amount considered by Bidder to be adequate to cover Contractor’s overhead and profit for each separately identified item, and (2) estimated quantities are not guaranteed, and are solely for the purpose of comparison of Bids, and final payment for all unit price Bid items will be based on actual quantities, determined as provided in the Contract Documents.
BASIS OF BID a. The BIDDER proposes to accept as full payment for the work proposed herein the amounts computed under the provisions of the Contract Documents and based upon the lump sum or unit prices, it being expressly understood that the lump sum or unit price is independent of the exact quantities involved. XXXXXX agrees that the lump sum or unit price represents a true measure of the labor, materials, and equipment required to perform the work, including all allowances for overhead, profit, taxes and fees for each type of work called for in the Contract Documents.
BASIS OF BID. 5.01 Bidder will complete the Work in accordance with the Contract Documents for the following Lump Sum and Unit Price(s): SCHEDULE OF PRICES Estimated Bid Unit Description Units Quantity Price Bid Price