Assembly and Disassembly Sample Clauses

Assembly and Disassembly. The parties agree that any and all Equipment mobilization and/or demobilization costs including but not limited to,assembly, erection, reconfiguration, disassembly or other movement of the Equipment, were quoted by Maxim based on “Standard Activity”. Standard Activity means mobilization and demobilization during the following minimum weather conditions, and otherwise absent a force majeure, (i) ambient temperature in excess of twenty (20) degrees Fahrenheit; (ii) sustained winds (including gusts) less than twenty (20) miles per hour; (iii) no precipitation in the form of snow or ice; or (iv) minor precipitation in the form of rain (less than one (1) inch per twenty-four (24) hour period. Rates for Standard Activity apply eight (8) hours per day Monday through Friday (excluding holidays). Rates for mobilization and/or demobilization which do not fall within Standard Activity (the "Non-Standard Rates") shall be provided to Lessee prior to any such costs being incurred and the parties hereto shall cooperate in good faith to schedule such mobilization and/or demobilization on a cost efficient basis. LESSEE AND MAXIM EACH KNOWINGLY, UNCONDITIONALLY, AND IRREVOCABLY WAIVE TRIAL BY JURY WITH RESPECT TO ANY ACTION, CLAIM, SUIT OR PROCEEDING, WHETHER SOUNDING IN CONTRACT, TORT OR OTHERWISE, IN RESPECT OF, ARISING OUT OF, RELATED TO, OR INCIDENTAL TO THE RELATIONSHIP ESTABLISHED BETWEEN THEM (OR AS TO ANY THIRD PARTIES) IN WITH THIS LEASE, ANY OTHER DOCUMENT OR AGREEMENT EXECUTED OR DELIVERED IN CONNECTION HEREWITH, THE CONDUCT THE PARTIES, OR THE TRANSACTIONS RELATED HERETO.
AutoNDA by SimpleDocs
Assembly and Disassembly. Small Parts Abbreviation All small parts are represented by the abbreviations listed below Table 6-1 Small Parts Abbreviations 記号 部品名称
Assembly and Disassembly. Small Parts Abbreviation 6-1 Disassembly 6-2 Assembly 6-2 Installation of the Printer Module 6-3 Pre-assembly A: Paper guide,straight, back unit 6-3 Pre-assembly B: Frame, platen, straight unit, B 6-4 Pre-assembly C: Cutter motor assembly 6-7 Pre-assembly D: Cutter, cover sub-unit 6-8 Pre-assembly E: Cutter unit, B 6-11 Pre-assembly F: Xxxxx xxxx detector sub-assembly (option) 6-13 Main Assembly A: Motor, paper feed, receipt, B and Platen detector . 6-14 Main Assembly B: Paper guide, straight, front and Paper guide, straight, back unit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-16 Main Assembly C: Frame, platen, straight unit 6-18 Main Assembly D: Thermal print head assembly 6-20 Main Assembly E: Plate, pressure spring 6-21 Main Assembly F: Fixing plate, the Gear, reduction and Gear, idler 6-23 Main Assembly G: Cutter unit 6-24 Assembly H: Arranging the lead wires 6-25 Main Assembly I: Cable, printer and Cable, head 6-26 Assembly J: Xxxxx xxxx detector Adjustment 6-27 Main Assembly K: Cover, cable 6-28 Main Assembly L: Cover, gear 6-29 Rev. A v Installation of the Other Modules 6-30 Pre-assembly A: Frame, paper supply assembly 6-30 Pre-assembly B: Roll paper holder unit 6-34 Pre-assembly C: Roll paper supply module 6-39 Pre-assembly D: Presenter table assembly 6-40 Pre-assembly E: Presenter frame, right assembly 6-41 Pre-assembly F: Presenter frame, left assembly 6-42 Pre-assembly G: Paper guide assembly 6-43 Pre-assembly H: Cutting sheet presenter module 6-44 Main Assembly A: Printer module 6-49 Main Assembly B: Cut sheet presenter module 6-52 Main Assembly C: Roll paper supply module 6-53 Main Assembly D: Control circuit board and Cover, circuit boards upper / lower 6-54 Main Assembly E: Roll paper shaft assembly 6-57 Appendix EU-T432 Exploded Diagram 1 Printer Module Exploded Diagram 2 Cut Sheet Presenter Module Exploded Diagram 3 Roll Paper Supply Module Exploded Diagram 4 EU-T432 Lubrication Diagram 5 Printer Module Lubrication Diagram 6 Cut Sheet Presenter Module Lubrication Diagram 7 Roll Paper Supply Module Adhesive Diagram 8 vi Rev. A Confidential Chapter 1
Assembly and Disassembly. This chapter contains assembly and disassembly for the units and the modules of the EU-T532 / T542. Appendix Appendix contains the exploded, and the lubrication diagrams of the EU-T532 / T542.
Assembly and Disassembly. Assembly and disassembly hours shall be considered to be regular work hours, and the Producer shall pay the Staff Member overtime for them as agreed upon in this Agreement, if they occurred in overtime hours.
Assembly and Disassembly. The Customer shall ensure the rig area provides free access for deliveries and that the area is readily flattened, compressed, with sufficient load bearing capacity and cleared at the agreed time, this includes snow. The Customer is responsible for safety and fencing off the rig area during assembly or disassembly. Any costs related to the closing of roads/sidewalks, signs etc. shall be charged to the Customer. Access to hoists or cranes for loading of equipment and any accessories shall be provided by the Customer. If the area for loading and unloading is situated more than 8 meters from the rigging area, costs for mobile crane may apply. Power, water and drains must be provided up to a deployment area according to the Cramo’s instructions. The water supply pressure must not exceed 5.5 bar. Any damage due to subsidence is the liability of the Customer. Assembly/disassembly can be done no earlier than 10 business days, and no later than 30 business days, after the written order. All work will be performed within regular working hours. Any interruption due to during assembly/disassembly which is caused by the Customer or his partners, will any additional costs result in a supplemental invoice. The Customer shall perform any work necessary to ensure holes, digging, plumbing etc. to canalizations for cables and pipes, and also cover any costs due to the covering of holes, repair of damage after wall mounts and canalizations. Any assembly of hoists must ensure access to fixation points through scaffolding, hoist or other relevant and secured equipment. The Customer is responsible to ensure fixation points of the building have the correct dimension for necessary load. Load forces will be given upon request. The price is based on the hoist being fixed to concrete (not to hollow core slabs or steel). Fixation material will be invoiced additionally. If steel fixations are to be used, additional welding costs apply.
Assembly and Disassembly. The lessee shall carry out the assembly and disassembly of the Equipment on his own responsibility and at his own expense.
AutoNDA by SimpleDocs

Related to Assembly and Disassembly

  • DISCIPLINE AND DISCHARGE 21.01 The Employer may warn, suspend, demote or discharge employees for just cause. If the conduct or performance of an employee warrants disciplinary action, such action shall be confirmed in writing. A copy of all such documentation shall be provided to the employee(s) involved and forwarded to the office of the Union at the time they are issued.

Time is Money Join Law Insider Premium to draft better contracts faster.