Asphalt Cores Sample Clauses

Asphalt Cores. Consultant shall maintain such personal contact with the Project as is necessary to assure themselves of compliance, in every material respect, approved construction documents. Personal contact shall include visits to the project site by the Consultant or its qualified representative to observe construction. Observation and testing shall consist of visual observation of earthwork activities and taking field density and moisture tests for the purpose of ascertaining that the work is in substantial conformance with the contract documents, including the project plans and specifications. Such observation and testing shall not be relied upon by others as acceptance of the work nor shall it be construed to relieve the contractor in any way from his obligation and responsibilities under the construction contract. Specifically, but without limitations, observation and testing shall not require the technician and engineer to assume responsibilities for the means and methods of construction nor for safety on the jobsite. EXHIBIT “B” HOURLY RATES AND/OR UNIT PRICES Refer to Fee Proposal. DATE: 01/31/20 Revised 5/15/20 PROPOSAL No.: P16872 CLIENT: OHLONE COMMUNITY COLLEGE PROJECT: XXXXXX XXXXXXXX 0 XXXXXXXXXXX XXXXXXXX: XXXXXXX, XX ITEM: I ONSITE TESTING & INSPECTIONS ESTIMATED DAYS ESTIMATED HOURS UNIT PRICE ESTIMATED TOTAL CONCRETE (IOR TO INSPECT REBAR ) FOOTINGS/GRADE BEAMS 2 4 $82 $656 NON-SHRINK GROUT - COLUMN BASEPLATES 2 4 $82 $656 WALLS & COLUMNS 1 4 $82 $328 METAL DECK POURS (REBAR/CONCRETE) 1 4 $82 $328 OTHER - MISC CONCRETE 4 4 $82 $1,312 FIREPROOFING - 1 SET OF SAMPLES PER 2,500 SF (PATCHING) SUB-STRATE INSPECTION 3 4 $82 $984 THICKNESS TESTING 3 4 $82 $984 DENSITY SAMPLING 3 4 $82 $984 COHESION/ADHESION TESTING 2 4 $82 $656 STRUCTURAL STEEL ERECTION/MEMBER VERIFICATION/BOLTING 8 4 $82 $2,624 FIELD WELDING/UT/MT 20 8 $82 $13,120 LIGHT GAUGE METAL FRAMING - WELDING INSPECTION 6 4 $82 $1,968 MISC FIELD TESTING SERVICES EPOXY REBAR/BOLTS - INSTALL OBSERVATION 2 4 $82 $656 EPOXY REBAR/ BOLTS - PROOF LOADING/PULL TESTING (PORTAL TO PORTAL) 2 4 $82 $656 EXPANSION ANCHOR - INSTALL OBSERVATION 6 4 $82 $1,968 EXPANSION ANCHOR - TORQUE TESTING (PORTAL TO PORTAL) 6 4 $82 $1,968 CEILING WIRE - PROOF LOADING/PULL TESTING (PORTAL TO PORTAL) 4 4 $82 $1,312 PORTAL TO PORTAL TRAVEL TIME - TEST EQUIPMENT TRANSPORT 12 1 $82 $984 PORTAL TO PORTAL MILEAGE - TEST EQUIPMENT TRANSPORT 12 46 $0.58 $320 GEOTECHNICAL SERVICES SOILS COMPACTION - SITE UTILITIES 17 4 $95 $6,460 PORTAL...
AutoNDA by SimpleDocs
Asphalt Cores. Consultant shall maintain such personal contact with the Project as is necessary to assure themselves of compliance, in every material respect, approved construction documents. Personal contact shall include visits to the project site by the Consultant or its qualified representative to observe construction. Observation and testing shall consist of visual observation of earthwork activities and taking field density and moisture tests for the purpose of ascertaining that the work is in substantial conformance with the contract documents, including the project plans and specifications. Such observation and testing shall not be relied upon by others as acceptance of the work nor shall it be construed to relieve the contractor in any way from his obligation and responsibilities under the construction contract. Specifically, but without limitations, observation and testing shall not require the technician and engineer to assume responsibilities for the means and methods of construction nor for safety on the jobsite. EXHIBIT “B” HOURLY RATES AND/OR UNIT PRICES
Asphalt Cores. Bulk specific gravity 25.00 Asphalt content (extraction) 100.00 Aggregate gradation (extracted aggregate) 100.00 Maximum specific gravity (Rice method) 125.00 Sample preparation (per core) 35.00
Asphalt Cores. Consultant shall maintain such personal contact with the Project as is necessary to assure themselves of compliance, in every material respect, approved construction documents. Personal contact shall include visits to the project site by the Consultant or its qualified representative to observe construction. Observation and testing shall consist of visual observation of earthwork activities and taking field density and moisture tests for the purpose of ascertaining that the work is in substantial conformance with the contract documents, including the project plans and specifications. Such observation and testing shall not be relied upon by others as acceptance of the work nor shall it be construed to relieve the contractor in any way from his obligation and responsibilities under the construction contract. Specifically, but without limitations, observation and testing shall not require the technician and engineer to assume responsibilities for the means and methods of construction nor for safety on the jobsite. EXHIBIT “B” HOURLY RATES AND/OR UNIT PRICES Refer to Fee Proposal. OHLONE COMMUNITY COLLEGE DISTRICT FEE PROPOSAL FORM 9101C GEOTHERMAL GROUND LOOP PROJECT GEOTECHNICAL INSPECTION SERVICES Firm Name: Each Respondent shall complete the following pricing proposal for each type of test/inspection identified below.

Related to Asphalt Cores

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins.

  • Pipelines Developer shall have no interest in the pipeline gathering system, which gathering system shall remain the sole property of Operator or its Affiliates and shall be maintained at their sole cost and expense.

  • Safety Equipment Should the employment duties of an employee in the bargaining unit require use of any equipment or gear to insure the safety of the employee or others, the District agrees to furnish such equipment or gear.

  • Irrigation Systems The Project Area either has no irrigation system or a low-volume drip irrigation system. If a watering system is used, it is a drip irrigation system equipped with a filter, pressure regulator and emitters rated at twenty (20) gallons per hour (gph) or less. The system is maintained free of leaks and malfunctions. No spray irrigation is applied to the Project Area, including spray from irrigation systems adjacent to the Project Area.

  • TOOL STORAGE 1. A company shall provide on all construction jobs in towns and cities, and elsewhere where reasonably necessary and practicable (or if requested buy the employee), a suitable and secure waterproof lock-up solely for the purpose of storing employees’ tools, and on multi-storey and major projects the company shall provide, where possible, a suitable lock-up for employees’ tools within a reasonable distance of the work area of large groups of employees.

  • Irrigation The City shall provide water to the Premises for the purpose of irrigating the facility. The City specifically reserves the right to restrict water usage under this Agreement if water restrictions are placed on other water users within the City. Prior to the start of the season, City will provide charge up and run through the automatic irrigation systems to check for proper operation. City will provide Lessee with a radio for remote operation of the irrigation system, which Lessee shall use for the day to day maintenance, repair, and monitoring of the irrigation system. If the radio is lost, stolen, broken, or is rendered unusable, Lessee shall pay $1500 for the replacement radio. City is responsible for the maintenance and repair of the following irrigation elements, to the extent applicable: curb stops, backflow prevention devices, backflow enclosures, main line pipings, electric control valves, and controllers. Lessee shall notify Parks Division Water managers by email if any of these irrigation elements are malfunctioning or broken.

  • Television Equipment Recycling Program If this Contract is for the purchase or lease of covered television equipment, then Contractor certifies that it is compliance with Subchapter Z, Chapter 361 of the Texas Health and Safety Code related to the Television Equipment Recycling Program.

  • Television Equipment Recycling If this Contract is for the purchase or lease of covered television equipment, then Contractor certifies that it is compliance with Subchapter Z, Chapter 361 of the Texas Health and Safety Code related to the Television Equipment Recycling Program.

  • Computer Equipment Recycling Program If this Contract is for the purchase or lease of computer equipment, then Contractor certifies that it is in compliance with Subchapter Y, Chapter 361 of the Texas Health and Safety Code related to the Computer Equipment Recycling Program and the Texas Commission on Environmental Quality rules in 30 TAC Chapter 328.

  • Welding Welding and use of cutting torches or cutoff saws will be permitted only in areas that have been cleared or are free of all material capable of carrying fire. Flammable debris and vegetation must be removed from within a minimum 10-foot radius of all welding and cutting operations. A shovel and a 5-gallon standard backpack water container filled and with handpump attached shall be immediately available for use in the event of a fire start. C8.212 – MARKET-RELATED CONTRACT TERM ADDITION (11/08). The term of this contract may be adjusted when a drastic reduction in wood product prices has occurred in accordance with 36 CFR 223.52. The Producer Price Index used to determine when a drastic reduction in price has occurred is stated in A20. Purchaser will be notified whenever the Chief determines that a drastic reduction in wood product prices has occurred. If the drastic reduction criteria specified in 36 CFR 223.52 are met for 2 consecutive calendar quarters, after contract award date, Contracting Officer will add 1 year to the contract term, upon Purchaser’s written request. For each additional consecutive quarter such a drastic reduction occurs, Contracting Officer will, upon written request, add an additional 3 months to the term during Normal Operating Season, except that no single 3-month addition shall extend the term of the contract by more than one year. Contracting Officer must receive Purchaser’s written request for a market-related contract term addition before the expiration of this contract. No more than 3 years shall be added to a contract's term by market-related contract term addition unless the following conditions are met:

Time is Money Join Law Insider Premium to draft better contracts faster.