Asbestos Containing Sample Clauses

Asbestos Containing. Asbestos containing insulation, flooring, and other building materials may be encountered by the Contractor during the performance of work under this 0200000 - Management and Administration Spec Item Title Description Material (ACM) contract, and the Contractor shall remain alert to this possibility. If ACM is encountered or suspected in the performance of work, the Contractor shall avoid removing, sanding, abrading, or disturbing the material. The Contractor shall verbally notify the KO within one hour and submit a written ACM Notification within 24 hours per Section F.
AutoNDA by SimpleDocs

Related to Asbestos Containing

  • Asbestos Any material that contains more than one percent asbestos and is friable or is releasing asbestos fibers into the air above current action levels established by the United States Occupational Safety and Health Administration.

  • CERTIFICATION OF NO ASBESTOS CONTAINING MATERIALS OR WORK 8.1 The Contractor shall be responsible for ensuring that no asbestos containing materials or work is included within the scope of the Work. The Contractor shall take whatever measures it deems necessary to insure that all employees, suppliers, fabricators, material men, subcontractors, or their assigns, comply with this requirement.

  • Preservative-treated Wood Containing Arsenic Contractor may not purchase preservative-treated wood products containing arsenic in the performance of this Agreement unless an exemption from the requirements of Chapter 13 of the San Francisco Environment Code is obtained from the Department of the Environment under Section 1304 of the Code. The term “preservative-treated wood containing arsenic” shall mean wood treated with a preservative that contains arsenic, elemental arsenic, or an arsenic copper combination, including, but not limited to, chromated copper arsenate preservative, ammoniacal copper zinc arsenate preservative, or ammoniacal copper arsenate preservative. Contractor may purchase preservative-treated wood products on the list of environmentally preferable alternatives prepared and adopted by the Department of the Environment. This provision does not preclude Contractor from purchasing preservative-treated wood containing arsenic for saltwater immersion. The term “saltwater immersion” shall mean a pressure-treated wood that is used for construction purposes or facilities that are partially or totally immersed in saltwater.

  • Prohibition Against Selecting and Installing Products Containing Hazardous Materials The Contractor shall not select, install or otherwise incorporate any products or materials containing Hazardous Materials within the boundaries of the Site. Should the Contractor or any Subcontractors have knowledge that, or believe that, an item, component, material, substance, or accessory within a product or assembly selected by the Contractor or any Subcontractor may contain Hazardous Materials it is the Contractor’s responsibility to secure a written certification from the manufacturer of any suspected material which identifies the specific Hazardous Material(s) contained, together with the Material Safety Data Sheets (MSDS) for such materials which shall be submitted to the Owner and Design Professional.

  • Mold The Resident acknowledges that to avoid mold growth it is important to prevent excessive moisture buildup and agrees to remove visible moisture accumulation as soon as it occurs and immediately report to Owner any evidence of excess moisture or mold or mildew inside the Home. Resident acknowledges receipt of the “Mold Information and Prevention Addendum”, which is fully executed and incorporated herein by reference.

  • Explosives Explosives or other highly flammable substances shall not be stored on Railroad's property without the prior written approval of Railroad.

  • Safety Devices All Products provided under the Contract shall be equipped with required safety devices to comply with all applicable codes, laws, and regulations that are in effect at the time of delivery.

  • Materials (Confirm each bullet point and sign below) ▪ Vendor claims some Vendor Data confidential to the extent permitted by T GC Chapter 552 and other applicable law. Vendor claims some Vendor Data confidential to the xtent permitted by TGC Chapter 552 and other applicable law. ▪ Vendor attached to this PDF all potentially confidential Vendor Data and listed the number of attached pages below. ▪ Vendor’s authorized signatory has signed below and shall upload this document in the proper location in the eBid System. ▪ Vendor agrees that TIPS shall not be liable for any release of confidential information required by law. Number of pages attached deemed confidential: Authorized Signature: (Confir ch bullet point and sig bel ) ( Confirm each bullet point and sign below By signing for Option 2 below, V endor ex pressly waives any confidentiality claim for all Vendor Data submitted in relation to this proposal and resulting contract. Vendor confirms that By signing for Option 2 below, V or e pressly waives any confidentiality claim for all Vendor Da ubmitted in relation TIPS may freely release Vendor Data submitted in relation to this proposal or resulting contract to any requestor. Vendor agrees that TIPS shall not be responsible or liable for any use or distribution of Vendor Data by TIPS or TIPS Members. ▪ Vendor’s authorized signatory has signed below and shall upload this document in the proper location in the eBid System. ▪Vendor agrees that TIPS shall not be liable for any release of confidential information required by law.

  • Insulation In exterior walls? Yes No Unknown In ceiling/attic? Yes No Unknown In any other areas? Yes No Where? Comments:

  • DISCOVERY OF HAZARDOUS MATERIALS If, during the performance of the Work, Contractor or Contractor’s subcontractor(s) encounter material believed to be asbestos, polychlorinated biphenyl (PCB), or any other identified or non-identified potentially hazardous material (which has not been rendered harmless and labeled as such), Contractor and Contractor’s subcontractor(s) shall immediately stop work in the area affected and report the condition, in writing, to District. The Work in the affected area shall not continue or be resumed except by written direction of District and by agreement by Contractor.

Time is Money Join Law Insider Premium to draft better contracts faster.