Approved Drawings Sample Clauses

Approved Drawings. Prior to the date hereof, Landlord retained Xxxxxxx Xxxxxxx & Associates (“Landlord’s Architect”) to prepare preliminary drawings for the Premises. Tenant hereby approves of the preliminary drawings (“Approved Drawings”), the work outline (“Work Outline”) and building standards (“Building Standards”) all shown in this Exhibit.
AutoNDA by SimpleDocs
Approved Drawings. The Work shall be performed using only Drawings and Specifications issued in the Contract Documents. Such issuance shall not relieve Contractor of any obligations under the Contract, nor constitute Owner's assumption or responsibility for the accuracy or adequacy of any of Contractor's information or the Work incorporated in such documents.
Approved Drawings. Prior to the date hereof, Landlord retained Revel Architecture and Design (“Landlord’s Architect”) to prepare preliminary drawings for the Premises. Tenant hereby approves of the preliminary drawings prepared by Landlord’s Architect dated 10.9.17 (“Approved Drawings”), the work outline (“Work Outline”) and building standards (“Building Standards’”) all shown in this Exhibit. Landlord’s Architect shall hereafter prepare more detailed construction drawings consistent with the Approved Drawings. Tenant shall diligently meet with and otherwise cooperate with Landlord’s Architect to finalize the construction drawings in a timely manner.
Approved Drawings. 1. Drawing 01, Sheet 1 of 12, Lot Grading and Drainage Plan (A), Rev. 4, February 14, 2014;
Approved Drawings. Landlord and Tenant have approved the plans attached as, or described in, Schedule 1 to this Exhibit D-1 (the "Approved Working Drawings"). No changes, modifications or alterations in the Approved Working Drawings may be made without the prior written consent of Landlord not to be unreasonably withheld, conditioned or delayed, provided that Landlord may withhold its consent in its sole discretion, to any change in the Approved Working Drawings, if such change would directly or indirectly delay the Substantial Completion of the Expansion Space.
Approved Drawings. Tenant shall submit detailed plans and specifications (including the size, number and type of any proposed Lines) to Landlord and obtain Landlord's prior written approval thereof (which Landlord may withhold in Landlord's sole discretion) before commencing any Work (such approved plans and specifications or drawings referred to herein as "Approved Drawings"). The plans and specifications shall include, if reasonably required by Landlord, detailed construction and engineering drawings, reports and studies. All paths and sites through which the Lines shall be run shall be designated by Landlord, and such paths and sites shall be reflected on the Approved Drawings. Tenant shall provide two (2) sets of "as built" drawings to Landlord promptly after completion of any Work, including without limitation as-built drawings showing all paths and sites through which all Lines are run. Unless Landlord agrees otherwise in writing, all drawings shall be CAD-generated in AUTOCAD Release 14 format (with no third party software), shall be submitted in hard copy and on disk, and shall otherwise comply with standards established by Landlord from time to time.
Approved Drawings. Prior to the date hereof, Landlord retained RMW Architecture & Interiors ("Landlord's Architect") to prepare preliminary drawings for the Premises. Tenant hereby approves of the preliminary drawings prepared by Landlord's Architect ("Approved Drawings"), the work outline (“Work Outline”) and building standards (“Building Standards”) all shown in this Exhibit. Landlord's Architect shall hereafter prepare more detailed construction drawings consistent with the Approved Drawings. Tenant shall diligently meet with and otherwise cooperate with Landlord's Architect to finalize the construction drawings in a timely manner.
AutoNDA by SimpleDocs
Approved Drawings. After issuance of an INTP, and based upon the Technical Specifications, the approved Design Development Documents, and any further adjustments in the scope of the Project authorized in writing by Owner, Contractor will proceed to prepare, for written approval by Owner, a list of the drawing type as well as drafts of the key drawings setting forth the requirements for the complete construction of each System (as approved by Owner, the “Drawings”). The Parties have agreed that the list of the Drawings to be reviewed and approved by Owner consists of General Arrangement drawings, P&IDs, Electrical One-line diagrams, and equipment Specifications. Contractor shall provide to Owner each listed Drawing as it is prepared by Contractor. Following Owner’s written approval of the listed Drawings, Contractor will proceed with the procurement, construction, installation, start-up and completion of the Systems based upon the Technical Specifications and the Drawings. Owner shall notify Contractor as to whether it approves or disapproves (and, if it disapproves, the reasons therefore) each of the Drawings within ten (10) Business Days of its receipt of the same. Owner will review the Drawings for compliance and will xxxx and stamp them to indicate whether changes and/or corrections are required. Contractor shall address all material comments and questions appropriately including, when appropriate, incorporating the comments, corrections and/or changes on the original drawing or document and resubmitting the drawing or document. Should Owner fail to provide notification to Contractor within the aforesaid ten (10) day period after its receipt of Drawings, then the Drawings for which notification is not provided shall be deemed to have been returned as acceptable for procurement, fabrication or construction. Owner’s approval or disapproval of any design documents, including but not limited to the “Drawings” shall not impose on Owner any responsibility for design and shall not be deemed a waiver, and will not relieve Contractor of Contractor’s obligations for turnkey design, procurement and construction of the Work in accordance with the Contract Documents. Performance of any work, fabrication of materials or procurement of fabricated material, requiring the review of drawings, data, etc., prior to obtaining final review of drawings, data, etc., is at Contractor’s risk.

Related to Approved Drawings

  • Approved Working Drawings The Final Working Drawings shall be approved by Landlord (the “Approved Working Drawings”) prior to the commencement of construction of the Premises by Tenant. After approval by Landlord of the Final Working Drawings, Tenant may submit the same to the appropriate municipal authorities for all applicable building permits. Tenant hereby agrees that neither Landlord nor Landlord’s consultants shall be responsible for obtaining any building permit or certificate of occupancy for the Premises and that obtaining the same shall be Tenant’s responsibility; provided, however, that Landlord shall cooperate with Tenant in executing permit applications and performing other ministerial acts reasonably necessary to enable Tenant to obtain any such permit or certificate of occupancy. No changes, modifications or alterations in the Approved Working Drawings may be made without the prior written consent of Landlord, which consent may not be unreasonably withheld.

  • Downgrade Drawings (i) Each Liquidity Provider will promptly, but in any event within ten (10) days of the occurrence of a Downgrade Event with respect to it (the date of such occurrence, the “Downgrade Date”), deliver notice to the Subordination Agent and American of the occurrence of such Downgrade Event and the Downgrade Date therefor. After the occurrence of a Downgrade Event with respect to any Liquidity Provider, each Liquidity Facility provided by such Liquidity Provider shall become a “Downgraded Facility” on the thirty-fifth (35th) day after the related Downgrade Date, unless, not later than such thirty-fifth (35th) day (or, if earlier, the expiration date of such Downgraded Facility), the Rating Agency whose downgrading of such Liquidity Provider resulted in such Downgrade Event shall have provided a written confirmation to the effect that the occurrence of such Downgrade Event will not result in the downgrading, withdrawal or suspension of the ratings then issued by such Rating Agency of the related Class of Certificates. Notwithstanding the foregoing, if at any time after the occurrence of such Downgrade Event, such Liquidity Provider notifies the Subordination Agent in writing that no such confirmation will be provided by such Rating Agency, each Liquidity Facility provided by such Liquidity Provider shall become a Downgraded Facility as of the date of such notice to the Subordination Agent.

  • Letter of Credit Drawings The obligations of each Borrower under any Letter of Credit Agreement and any other agreement or instrument relating to any Letter of Credit issued for the account of such Borrower shall be unconditional and irrevocable, and shall be paid strictly in accordance with the terms of this Agreement, such Letter of Credit Agreement and such other agreement or instrument under all circumstances, including, without limitation, the following circumstances (it being understood that any such payment by such Borrower is without prejudice to, and does not constitute a waiver of, any rights such Borrower might have or might acquire as a result of the payment by any Lender of any draft or the reimbursement by such Borrower thereof):

  • Working Drawings Not later than 15 business days following the approval of the TI Design Drawings by Landlord, Tenant shall cause the TI Architect to prepare and deliver to Landlord for review and comment construction plans, specifications and drawings for the Tenant Improvements (“TI Construction Drawings”), which TI Construction Drawings shall be prepared substantially in accordance with the TI Design Drawings. Tenant shall be solely responsible for ensuring that the TI Construction Drawings reflect Tenant’s requirements for the Tenant Improvements. Landlord shall deliver its written comments on the TI Construction Drawings to Tenant not later than 10 business days after Landlord’s receipt of the same; provided, however, that Landlord may not disapprove any matter that is consistent with the TI Design Drawings. Tenant and the TI Architect shall consider all such comments in good faith and shall, within 10 business days after receipt, notify Landlord how Tenant proposes to respond to such comments. Any disputes in connection with such comments shall be resolved in accordance with Section 2(d) hereof. Provided that the design reflected in the TI Construction Drawings is consistent with the TI Design Drawings, Landlord shall approve the TI Construction Drawings submitted by Tenant. Once approved by Landlord, subject to the provisions of Section 4 below, Tenant shall not materially modify the TI Construction Drawings except as may be reasonably required in connection with the issuance of the TI Permit (as defined in Section 3(a) below).

  • Interest Drawings If on any Distribution Date, after giving effect to the subordination provisions of this Agreement, the Subordination Agent shall not have sufficient funds for the payment of any amounts due and owing in respect of accrued interest on the Class A Certificates or the Class B Certificates (at the Stated Interest Rate for such Class of Certificates) (other than any amount of interest which was due and payable on the Class A Certificates or the Class B Certificates on such Distribution Date but which remains unpaid due to the failure of the Depositary to pay any amount of accrued interest on the Deposits on such Distribution Date), then, prior to 12:30 p.m. (New York City time) on such Distribution Date, (i) the Subordination Agent shall request a drawing (each such drawing, an “Interest Drawing”) under the Liquidity Facility with respect to such Class of Certificates in an amount equal to the lesser of (x) an amount sufficient to pay the amount of such accrued interest (at the applicable Stated Interest Rate for such Class of Certificates) and (y) the Available Amount under such Liquidity Facility, and shall pay such amount to the Trustee with respect to such Class of Certificates in payment of such accrued interest.

  • Non-Extension Drawings If the Liquidity Facility is scheduled to expire on a date (the “Stated Expiration Date”) prior to the date that is 15 days after the Final Maturity Date with respect to the ACS Group Loans, then, no earlier than the 60th day and no later than the 30th day prior to the applicable Stated Expiration Date then in effect, the Administrative Agent shall request that the Liquidity Facility Provider extend the Stated Expiration Date until the earlier of (i) the date which is 15 days after the Final Maturity Date with respect to the ACS Group Loans and (ii) the date that is immediately preceding the 364th day occurring after the Stated Expiration Date then in effect (unless the obligations of the Liquidity Facility Provider under the Liquidity Facility are earlier terminated in accordance with the Liquidity Facility). If on or before the date which is 10 days prior to the Stated Expiration Date, (A) the Liquidity Facility shall not have been replaced in accordance with Section 3.10(d) hereof or (B) the Liquidity Facility Provider fails irrevocably and unconditionally to advise the Administrative Agent that such Stated Expiration Date then in effect shall be so extended (whether or not the Administrative Agent has in fact requested an extension), the Administrative Agent shall immediately, in accordance with the terms of the Liquidity Facility (a “Non-Extended Facility”), request a drawing under such Liquidity Facility (such drawing, a “Non-Extension Drawing”) for the Available Amount thereunder. Amounts drawn pursuant to a Non-Extension Drawing shall be deposited into the Liquidity Facility Reserve Account.

  • Construction Drawings After approving the Additional Programming Information, Landlord shall cause the Architect and the Engineers to prepare and deliver to Tenant Construction Drawings that conform to the approved Space Plan and the approved Additional Programming Information. Such preparation and delivery shall occur within 15 business days after the later of Landlord’s approval of the Additional Programming Information or the mutual execution and delivery of this Agreement. Tenant shall approve or disapprove the Construction Drawings by notice to Landlord. If Tenant disapproves the Construction Drawings, Tenant’s notice of disapproval shall specify any revisions Tenant desires in the Construction Drawings. After receiving such notice of disapproval, Landlord shall cause the Architect and/or the Engineers to revise the Construction Drawings, taking into account the reasons for Tenant’s disapproval (provided, however, that Landlord shall not be required to cause the Architect or the Engineers to make any revision to the Construction Drawings that is inconsistent with the Landlord Requirements or that Landlord otherwise reasonably disapproves), and resubmit the Construction Drawings to Tenant for its approval. Such revision and resubmission shall occur within five (5) business days after the later of Landlord’s receipt of Tenant’s notice of disapproval or the mutual execution and delivery of this Agreement if such revision is not material, and within such longer period of time as may be reasonably necessary (but not more than 15 business days after the later of such receipt or such mutual execution and delivery) if such revision is material. Such procedure shall be repeated as necessary until Tenant has approved the Construction Drawings. The Construction Drawings approved by Landlord and Tenant are referred to in this Work Letter as the “Approved Construction Drawings”.

  • Final Drawing Upon receipt from a Liquidity Provider of a Termination Notice with respect to any Liquidity Facility, the Subordination Agent shall, not later than the date specified in such Termination Notice, in accordance with the terms of such Liquidity Facility, request a drawing under such Liquidity Facility of all available and undrawn amounts thereunder (a “Final Drawing”). Amounts drawn pursuant to a Final Drawing shall be maintained and invested in accordance with Section 3.5(f) hereof.

  • Drawings a. Drawings Submitted With Bid When the Bid Specifications require the Bidder to furnish drawings and/or plans, such drawings and/or plans shall conform to the mandates of the Bid

  • Final Working Drawings After the Final Space Plan has been approved by Landlord, Tenant shall supply the Engineers with a complete listing of standard and non-standard equipment and specifications, including, without limitation, Title 24 calculations, electrical requirements and special electrical receptacle requirements for the Premises, to enable the Engineers and the Architect to complete the “Final Working Drawings” (as that term is defined below) in the manner as set forth below. Upon the approval of the Final Space Plan by Landlord and Tenant, Tenant shall promptly cause the Architect and the Engineers to complete the architectural and engineering drawings for the Premises, and Architect shall compile a fully coordinated set of architectural, structural, mechanical, electrical and plumbing working drawings in a form which is sufficiently complete to allow all of Tenant’s Agents to bid on the work and to obtain all applicable permits (collectively, the ‘‘Final Working Drawings”) and shall submit the same to Landlord for Landlord’s approval, which shall not be unreasonably withheld, conditioned, or delayed. Tenant shall supply Landlord with four (4) copies signed by Tenant of such Final Working Drawings, Landlord shall not unreasonably withhold, condition, or delay its approval of the Final Working Drawings. Landlord shall approve or reasonably EXHIBIT A disapprove of the Final Working Drawings within ten (10) business days after Landlord’s receipt thereof. If Landlord reasonably withholds its approval, Landlord shall provide Tenant with the specific reasons therefor.