AMENDMENT TO DESIGN WORK. 6.2.1 XXXX shall make no changes in the work or perform any additional work without the OWNER’s specific written approval. If such changes cause an increase in the cost of doing work or in the time required and are issued as a result of some action or inaction on the part of OWNER, compensation shall be at hourly rates as indicated in the payment schedule. Reimbursable Items Article 4 and Changes in Services Article 2 and Scope of Work, must be specifically approved by OWNER in writing before work begins. All changes in scope of work that amend this Contract may be subject to approval by County of Orange Board of Supervisors.
AutoNDA by SimpleDocs
AMENDMENT TO DESIGN WORK. 6.2.1 XXXX shall make no changes in the work or perform any additional work without the AUTHORITY’s specific written approval. Notwithstanding the forgoing, the AUTHORITY may approve increases in resulting from a substantial change in this Contract for services within the existing scope of work amount does not exceed 25 percent of the existing Contract price or $100,000, whichever is less. If such changes cause an increase in the cost of doing work or in the time required and are issued as a result of some action or inaction on the part of AUTHORITY, compensation shall be at hourly rates as indicated in the Attachment B. Reimbursable Items Article 4 and Changes in Services Article 2 and Scope of Work, must be specifically approved by AUTHORITY in writing before work begins. All changes in scope of work that amend this Contract may be subject to approval by County of Orange Board of Supervisors.
AMENDMENT TO DESIGN WORK. In the instance of an alleged “substantial change”, the determination by the Owner shall be conclusive. If the determination is challenged by the XXXX in any proceeding, the XXXX must establish by clear and convincing proof that the determination by the Owner was without any reasonable basis.

Related to AMENDMENT TO DESIGN WORK

  • Design Professional to Design Work The Design Professional Contract requires the Design Professional to design and to prepare the Contract Documents, a copy of which shall be furnished to the Contractor upon request. The Design Professional Contract requires the Design Professional to designate a readily accessible representative (either on Site or by computer, phone or fax or otherwise) who shall have authority promptly to render decisions and to furnish information required of the Design Professional.

  • Schematic Design Phase Services § 3.2.1 The Architect shall review the program and other information furnished by the Owner, and shall review laws, codes, and regulations applicable to the Architect’s services.

  • Schematic Design Phase INDICATE IN STATEMENT OF WORK “NOT APPLICABLE” IF SECTION IS NOT APPLICABLE

  • Schematic Design Documents In accordance with the approved Preliminary Design and Construction Schedule and based upon approval of and comments made by the Owner regarding the Concept Design Studies, the Design Professional shall prepare and submit to the Owner Schematic Design Documents, including drawings and outline specifications. These documents shall represent a further development of the approved design concept, providing additional detail and specificity regarding the intended design solution. Typically, all such documents shall be drawn to scale, indicating materials and assemblies, as appropriate, to convey the design intent and to illustrate the Project’s basic elements, scale and relationship to the Site. All major pieces of furniture and equipment to be fixed or supplied by the CM/GC shall be illustrated to scale. (See ASTM Standard Practice E 1804-02, August 2007, Sections 6.3, 8.2 and 8.3 for guidance on information which is generally developed in Schematic Design.)

  • Final Design Phase A. After acceptance by Owner of the Preliminary Design Phase documents, revised opinion of probable Construction Cost as determined in the Preliminary Design Phase, and/or any other Right of Way plan documents, subject to any Owner-directed modifications or changes in the scope, extent, character, or design requirements of or for the Project, and upon written authorization from Owner, Engineer shall:

  • Coordination of Design and Construction Contract Documents 5.5.1 Review model(s), Drawings, Specifications and other Construction Documents as they are developed by A/E during the Schematic Design, Design Development, and Construction Documents design phases of the Project.

  • Scope of Work and Deliverables 9.1 Background and Scope

  • Schematic Design See Section 2, Part 1, Article 2.1.4, Paragraph 2.1.4.2.

  • Preliminary Design Phase During the Preliminary Design Phase, the CONSULTANT shall, if requested by the CITY and accepted by the CONSULTANT as part of a Services Authorization:

  • Tenant Improvements Subject to the terms and conditions hereof, Landlord agrees, at its cost and expense to complete a “turnkey” interior build-out (“Tenant Improvements”) of the Leased Premises in accordance with the conditions stated in the Work Letter attached hereto as Exhibit C and incorporated hereby pursuant to the Approved Final Plans to be finalized and approved in accordance with the Work Letter and upon approval attached thereto. Any changes or modifications to the Approved Final Plans thereafter must be done in writing and signed by both Tenant and Landlord in accordance with the Work Letter. So long as in accordance with Article 19 of this Lease, Tenant agrees that Landlord shall be entitled to select, in its reasonable discretion and acting in good faith, all architects, engineers, contractors and material suppliers necessary to furnish the labor and materials for the construction of the Tenant Improvements. Landlord shall be the sole contracting party with respect to the employment of contractors which perform the work necessary to construct the Tenant Improvements. Tenant shall not be entitled to access to the Leased Premises prior to the Date of Substantial Completion and Tenant shall not interfere with or impair in any material way the construction of the Tenant Improvements, and any such interference or impairment shall be included within a Tenant Delay as defined in the Work Letter and shall entitle Landlord to all remedies provided herein for breach of this Lease. Prior to the Possession Date, Tenant shall not enter into any contract for construction of any improvements within the Leased Premises with any person other than Landlord without Landlord's prior written consent. Tenant, at Tenant's expense, shall obtain and maintain any and all necessary permits and licenses to enable Tenant to conduct Tenant’s Permitted Use, and the failure of Tenant to obtain or maintain same shall not in any manner affect the Tenant’s obligations hereunder. Landlord shall be solely responsible, at its cost and expense, for obtaining all permits and approvals related to the Tenant Improvements.

Time is Money Join Law Insider Premium to draft better contracts faster.