Alternative Playout Control Narrative Sample Clauses

Alternative Playout Control Narrative. This use case is about the cloudification of a media service where application state information of when a user has used the service last is made available at a different time and location. Assuming a streaming application in which the user has stopped the control, this scenario envisages that after a while and in a different condition (e.g., when jumping on a FLAME-empowered public bus) the user can resume the playing from where it was paused. The FLAME platform instantiates local server and caches (e.g., on the bus) to optimize QoS/QoE during a fast move across network access points in the Smart City. Stakeholders  Media service providers offering a playout service including a playout point (information consumed by end user) and ways to determine the application’s state.  Platform providers offering the service routing between decomposed service functions and the migration/replication of service instances in time and space.  Infrastructure provider to provide virtual computing, storage and networking capabilities for the platform to instantiate the playout service at locations within the network.
AutoNDA by SimpleDocs

Related to Alternative Playout Control Narrative

  • Supervisory Control and Data Acquisition (SCADA) Capability The wind plant shall provide SCADA capability to transmit data and receive instructions from the ISO and/or the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, as applicable, to protect system reliability. The Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected and the wind plant Developer shall determine what SCADA information is essential for the proposed wind plant, taking into account the size of the plant and its characteristics, location, and importance in maintaining generation resource adequacy and transmission system reliability in its area.

  • Program Narrative All restricted xxxxxx courses which are taught for the purpose of qualifying an individual for restricted xxxxxx license to practice barbering shall consist of a minimum of 1200 hours of training to prepare each restricted xxxxxx to service their communities.

  • Configuration Management The Contractor shall maintain a configuration management program, which shall provide for the administrative and functional systems necessary for configuration identification, control, status accounting and reporting, to ensure configuration identity with the UCEU and associated cables produced by the Contractor. The Contractor shall maintain a Contractor approved Configuration Management Plan that complies with ANSI/EIA-649 2011. Notwithstanding ANSI/EIA-649 2011, the Contractor’s configuration management program shall comply with the VLS Configuration Management Plans, TL130-AD-PLN-010-VLS, and shall comply with the following:

  • Budget Narrative Services are strictly paid as cost reimbursement. No funds will be paid for services not provided.

  • PERFORMANCE MANAGEMENT SYSTEM 5.1 The Employee agrees to participate in the performance management system that the Employer adopts or introduces for the Employer, management and municipal staff of the Employer.

  • Framework Management Structure 2.1.1 The Supplier shall provide a suitably qualified nominated contact (the “Supplier Framework Manager”) who will take overall responsibility for delivering the Goods and/or Services required within this Framework Agreement, as well as a suitably qualified deputy to act in their absence.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Quality Control Plan Within forty five (45) days after the design development documents are approved, the Design-Builder shall develop a quality control plan for the Project (the “Quality Control Plan”). A draft of the Quality Control Plan shall be submitted to the Department and shall be subject to the Department’s review and approval. The Quality Control Plan shall be tailored to the specific products/type of construction activities contemplated by the GMP Basis Documents, and in general, shall include a table of contents, quality control team organization, duties/responsibilities of quality control personnel, submittal procedures, inspection procedures, deficiency correction procedures, documentation process, and a list of any other specific actions or procedures that will be required for key elements of the Work.

  • Management Plan The Management Plan is the description and definition of the phasing, sequencing and timing of the major Individual Project activities for design, construction procurement, construction and occupancy as described in the IPPA.

  • Program Monitoring The Contractor will make all records and documents required under this Agreement as outlined here, in OEC Policies and NHECC Policies available to the SRO or its designee, the SR Fiscal Officer or their designee and the OEC. Scheduled monitoring visits will take place twice a year. The SRO and OEC reserve the right to make unannounced visits.

Time is Money Join Law Insider Premium to draft better contracts faster.