Air Traffic Control Tower and Technical Building Sample Clauses

Air Traffic Control Tower and Technical Building. The ATC tower complex comprises of the ATC tower, technical building and the utilities block. The ATC tower is designed to allow the controller eye level to be 68 m above surrounding ground level. Category I ILS system has been selected for both the approaches to provide the necessary operational efficiency for air traffic movements. The ATC tower has the workspaces and supporting equipment planned on three levels at the top of the tower. The apron control is located in the ATC tower below the air traffic control room for arrival and departure manoeuvres. Staff facilities such as pantry and toilets are also provided at this level. Another level houses the technical equipment and machine rooms. A balcony is provided for maintenance of the glazing. The control room floor has a stepped profile to allow unobstructed vision. The total height of the tower is about 70m. The load bearing elements are the service shaft which houses 2 elevators and a staircase. The airside face of the elevator shafts has glazing supported by a series of beams between the cone and the shell. The tower roof is in steel and is supported by the mullions on the periphery which also support the glazing. The total area of ATC tower is about 1170 sq.m. The technical building is a 2 level reinforced concrete framed structure of size 34m x 44.5m and is connected to the tower by an elevated passage at first floor level. The total area of technical building is about 2050 sq.m. Most areas are provided with an access floor. The utility block has a size of 20m x 10m and houses the substation and air-conditioning plant. Finishing Specifications Workspaces in the tower and technical block shall have access floors with carpet tiles. UPS rooms shall have anti-static rubberized floors. The courtyard in the technical building shall be landscaped with a subsoil drainage network floor. Technical rooms shall have anti-static rubberized floor. Anti skid ceramic tile floors shall be provided in toilets, rest rooms and pantry. Equipment rooms shall have industrial grade rubberized floors. The north and south facades and court facing facades of technical building shall have glazed curtain walls. The east and west facades shall be finished in a dry stone cladding. External walls of service areas will have metal cladding with louvers for air extraction and ventilation. The roof of technical building shall be in structural steel and pre-coated profiled metal sheeting. The roof dips over the entrance lounge and ex...
AutoNDA by SimpleDocs

Related to Air Traffic Control Tower and Technical Building

  • Local Control Center, Metering and Telemetry The NTO shall operate, pursuant to ISO Tariffs, ISO Procedures, Reliability Rules and all other applicable reliability rules, standards and criteria on a twenty-four (24) hour basis, a suitable local control center(s) with all equipment and facilities reasonably required for the ISO to exercise ISO Operational Control over NTO Transmission Facilities Under ISO Operational Control, and for the NTO to fulfill its responsibilities under this Agreement. Operation of the NYS Power System is a cooperative effort coordinated by the ISO control center in conjunction with local control centers and will require the exchange of all reasonably necessary information. The NTO shall provide the ISO with Supervisory Control and Data Acquisition (“SCADA”) information on facilities listed in Appendices A-1 and A-2 herein as well as on generation and merchant transmission resources interconnected to the NTO’s transmission facilities pursuant to the ISO OATT. The NTO shall provide metering data for its transmission facilities to the ISO, unless other parties are authorized by the appropriate regulatory authority to provide metering data. The NTO shall collect and submit to the ISO billing quality metering data and any other information for its transmission facilities required by the ISO for billing purposes. The NTO shall provide to the ISO the telemetry and other operating data from generation and merchant transmission resources interconnected to its transmission facilities that the ISO requires for the operation of the NYS Power System. The NTO will establish and maintain a strict code of conduct to prevent such information from reaching any unauthorized person or entity.

  • TECHNICAL TASKS Products that require a draft version are indicated by marking “(draft and final)” after the product name in the “Products” section of the task/subtask. If “(draft and final)” does not appear after the product name, only a final version of the product is required. Subtask 1.1 (Products) describes the procedure for submitting products to the CAM.

  • Technical Specifications The Technical Specifications furnished on the CD are intended to establish the standards for quality, performance and technical requirements for all labor, workmanship, material, methods and equipment necessary to complete the Work. When specifications and drawings are provided or referenced by the County, these are to be considered part of the Scope of Work, and to be specifically documented in the Detailed Scope of Work. For convenience, the County supplied specifications, if any, and the Technical Specifications furnished on the CD.

  • Management of Special and Technical Environment Each certificated support person demonstrates an acceptable level of performance in managing and organizing the special materials, equipment and environment essential to the specialized programs.

  • Network Interconnection Architecture Each Party will plan, design, construct and maintain the facilities within their respective systems as are necessary and proper for the provision of traffic covered by this Agreement. These facilities include but are not limited to, a sufficient number of trunks to the point of interconnection with the tandem company, and sufficient interoffice and interexchange facilities and trunks between its own central offices to adequately handle traffic between all central offices within the service areas at P.01 grade of service or better. The provisioning and engineering of such services and facilities will comply with generally accepted industry methods and practices, and will observe the rules and regulations of the lawfully established tariffs applicable to the services provided.

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Technical Specification As enumerated in Special Conditions of Contract/Scope of Work/attached Drawing/ Details/Schedule of Rates.

  • PUBLIC WORKS AND BUILDING SERVICES CONTRACTS Work being done under a resulting Authorized User Agreement may be subject to the prevailing wage rate provisions of the New York State Labor Law. Such work will be identified by the Authorized User within the RFQ. See “Prevailing Wage Rates – Public Works and Building Services Contracts’ in Appendix B, Clause 10, OGS General Specifications. Any federal or State determination of a violation of any public works law or regulation, or labor law or regulation, or any OSHA violation deemed "serious or willful" may be grounds for a determination of vendor non-responsibility and rejection of proposal. The Prevailing Wage Case Number for this Contract is PRC# 2014011745. The Prevailing Wage Rates for various occupations and General Provisions of Laws Covering Workers on Article 8 Public Work Contract can be accessed at the following NYS Department of Labor website: xxxxx://xxxxxxxxxxxx.xxxxx.xx.xxx/wpp/xxxxXxxxXxxxxxx.xx?method=showIt  Insert PRC# 2014011745 in the box provided and click Submit.  Click Wage Schedule located underneath the main header of this page. The PDF file may be searched to obtain the Prevailing Wage Rate for a specific occupation. SHORT TERM EXTENSION In the event a replacement Contract has not been issued, any Contract let and awarded hereunder by the State, may be extended unilaterally by the State for an additional period of up to 3 months upon notice to the Contractor with the same terms and conditions as the original Contract including, but not limited to, prices and delivery requirements. With the concurrence of the Contractor, the extension may be for a period of up to 6 months in lieu of 3 months. However, this extension terminates should the replacement Contract be issued in the interim. PROCUREMENT INSTRUCTIONS Authorized Users should refer to the documents attached as Appendix G – Processes and Forms Templates for specific instructions on the usage of this Contract. OGS reserves the right to unilaterally make revisions, changes, additions and/or updates to the documents attached as Appendix G - Processes and Forms Templates without processing a formal amendment and/or modification. SPECIFICATIONS During the term of the Contract, the Authorized User may request Product specifications for particular items that have been included by the Contractor in its Pricing Pages. These specifications will be provided by the Contractor at no cost.

  • Research, Science and Technology Cooperation 1. The aims of cooperation in research, science and technology, carried out in the mutual interest of the Parties and in compliance with their policies, will be: (a) to build on existing agreements already in place for cooperation on research, science and technology; (b) to encourage, where appropriate, government agencies, research institutions, universities, private companies and other research organizations in the Parties to conclude direct arrangements in support of cooperative activities, programs or projects within the framework of this Agreement, specially related to trade and commerce; and (c) to focus cooperative activities towards sectors where mutual and complementary interests exist, with special emphasis on information and communication technologies and software development to facilitate trade between the Parties. 2. The Parties will encourage and facilitate, as appropriate, the following activities including, but not limited to:

  • PREVAILING WAGE RATES - PUBLIC WORKS AND BUILDING SERVICES CONTRACTS If any portion of work being Bid is subject to the prevailing wage rate provisions of the Labor Law, the following shall apply:

Time is Money Join Law Insider Premium to draft better contracts faster.