Air Conditioning Systems Sample Clauses

Air Conditioning Systems. 9.1 The inspector shall:
AutoNDA by SimpleDocs
Air Conditioning Systems. A. Air conditioning systems may be installed in school vehicles if:
Air Conditioning Systems. The inspection of the air conditioning system includes the cooling equipment; cooling distribution equipment and the operating controls.(1) The inspector will:(a) Describe the central air conditioning system and energy sources.(b) Operate the system using normal control devices and measure and record temperature differential.(c) Open readily accessible access panels or covers provided by the manufacturer or installer.(d) Inspect the condition of controls and operative components of the complete system; conditions permitting.(e) Describe any deficiencies of these systems or components in the inspection report.(2) The inspector is not required to:(a) Activate cooling systems that have been shut down.
Air Conditioning Systems. 3.1.1 A floorwide central air conditioning system (heating/cooling) with area temperature controls as per the definition listed in the offices specifications.
Air Conditioning Systems thermostats missing and/or inoperable, disconnected duct work; dirty air diffusers, coils and/or filters; unit inoperable, improperly serviced and/or not in proper working condition. 13. Exterior Building: bent or displaced downspouts, damaged or missing truck bumpers, any cracks or damages to the exterior wall, any broken or cracked windows, and/or any graffiti. 14. Parking Lot: cracks, gouges, or any damage caused by Tenant's operation. 15. Any equipment or part of the Premises described in Paragraph 6 of the Lease Agreement that is not operational and in proper condition as described therein.
Air Conditioning Systems a. Floor-by-floor, variable air volume packaged air handling units are provided. Each unit is equipped with replaceable type filters, cooling coil, fan section, coated galvanised steel drip pan, trapped condensate drain, access floors, controls etc. Unit(s) on each floor are controlled in unison and are noise rated to achieve NR38 in adjacent space.
Air Conditioning Systems. 1. The air conditioning system shall be an all air-variable air volume system. Supply air shall originate at a central Fan Room consisting of multiple supply air and return air systems. The supply air systems shall be built-up type arranged in a blow-through configuration, utilizing vane-axial fans with variable speed motors. The return air fans shall also be vane-axial type with variable speed motors. The supply fans shall be headered together for operating flexibility and reliability.
AutoNDA by SimpleDocs

Related to Air Conditioning Systems

  • Air Conditioning If the Apartment has been provided with a ledge for split air conditioning system with suitable provision for keeping outdoor units of the AC system and also the route to take refrigerant piping, which the Allottee shall have to strictly follow while installing AC units

  • Heat and Air-Conditioning Landlord shall provide and maintain heat, ventilation and air-conditioning (“HVAC”) equipment sufficient to maintain the Premises at comfortable temperatures for general office use, subject to all federal, state and municipal regulations, during Normal Building Operating Hours (as defined in the Rules and Regulations) and subject to compliance by Tenant with the following and the provisions of Section 6.2.4. If Tenant shall require HVAC at times other than Normal Building Operating Hours, Landlord may furnish such service and Tenant shall pay therefor such charges as may from time to time be in effect. If the temperature otherwise maintained in any portion of the Premises by the HVAC system is affected as a result of (i) the type or quantity of any lights, machines or equipment used by Tenant in the Premises, (ii) the occupancy of any portion of the Premises by more than one person per two hundred (200) square feet of rentable area, (iii) an electrical load for lighting or power in excess of the limits specified in Section 6.2.4, or (iv) any partitioning or other improvements installed by Tenant, then at Tenant’s sole cost, Landlord may install any equipment, or modify any existing equipment Landlord deems necessary to restore the temperature balance. Tenant agrees to keep closed, when necessary, blinds or other window treatments which, because of the sun’s position, must be closed to provide for the efficient operation of the air conditioning system, and Tenant agrees to cooperate with Landlord and to abide by the reasonable regulations and requirements which Landlord may prescribe for the proper functioning and protection of the HVAC system. Landlord shall have no responsibility for providing any service from Separate HVAC Equipment, as defined in Section 6.1.3.

  • Heating and Air Conditioning Tenant shall not use any method of heating or air-conditioning, other than that supplied by Landlord, without Landlord’s prior written consent.

  • HEATING, VENTILATING AND AIR CONDITIONING General Office Area: The building shall be equipped with a combination heating, ventilation and air conditioning system. The system shall have ducted supply and return air. The space above the ceiling shall not be used as a supply or return plenum. The systems shall be sized in accordance with the weather conditions identified in Chapter 13, “Energy Conservation” of the 1996 BOCA Building Code and supplemented by the “Building Code Rules”. All HVAC equipment shall be commercial or light industrial grade. If new construction it shall be installed at grade or within mechanical rooms for easy access and maintenance. If existing construction, roof mounted equipment will be considered after all other options have been exhausted, including the elimination of noise and vibration transfer to the structural members. The HVAC systems shall be zoned, with units sized and placed as required by heating and cooling loads on the building. Zoning of systems is dependent on the size, shape and orientation of the building. The HVAC system shall be divided into a minimum of 4 exterior and 1 interior temperature control zones. Return air shall be taken from the area supplied or adjacent to the area in the same temperature control zone. The ventilation and exhaust system shall be sized to maintain a positive pressure throughout the building envelope to limit air and dust infiltration. No HVAC ductwork shall be installed under the floor slab or underground.

  • Heating, Ventilation and Air Conditioning Landlord shall furnish to the Premises heating, ventilation and air-conditioning (“HVAC”) in accordance with the Design Standards set forth in Exhibit D during Ordinary Business Hours. Landlord shall have access to all air-cooling, fan, ventilating and machine rooms and electrical closets and all other mechanical installations of Landlord (collectively, “Mechanical Installations”), and Tenant shall not construct partitions or other obstructions which may interfere with Landlord’s access thereto or the moving of Landlord’s equipment to and from the Mechanical Installations. No Tenant Party shall at any time enter the Mechanical Installations or tamper with, adjust, or otherwise affect such Mechanical Installations. Landlord shall not be responsible if the HVAC System fails to provide cooled or heated air, as the case may be, to the Premises in accordance with the Design Standards by reason of (i) any equipment installed by, for or on behalf of Tenant, which has an electrical load in excess of the average electrical load and human occupancy factors for the HVAC System as designed, or (ii) any rearrangement of partitioning or other Alterations made or performed by, for or on behalf of Tenant. Tenant shall install, if missing, blinds or shades on all windows, which blinds and shades shall be subject to Landlord’s approval, and shall keep operable windows in the Premises closed, and lower the blinds when necessary because of the sun’s position, whenever the HVAC System is in operation or as and when required by any Requirement. Tenant shall cooperate with Landlord and shall abide by the rules and regulations which Landlord may reasonably prescribe for the proper functioning and protection of the HVAC System. Tenant acknowledges that the server room in the Premises currently has three heat pumps installed, being two 4-ton units, and one 2.5-ton unit (the “Existing Heat Pumps”). The 2.5-ton unit is currently connected and operational. Tenant shall determine whether it is satisfied with the condition of the Existing Heat Pumps and Landlord shall not have any responsibility or liability for the condition, operation, maintenance, repair or replacement of the Existing Heat Pumps. Tenant may operate the Existing Heat Pumps. Tenant shall be responsible for, and pay directly for, all necessary maintenance and repairs to the Existing Heat Pumps. Tenant shall reimburse Landlord monthly for the cost of all utility services used to operate the Existing Heat Pumps within 10 Business Days after receipt of Landlord’s invoice for such amount. Landlord may measure Tenant’s usage of such utility services by either a sub-meter or by other reasonable methods such as by temporary check meters or by survey. Tenant, at its cost, may replace the Existing Heat Pumps with one or more new heat pumps, provided, however, that the capacity of such replacement heat pump(s) shall not exceed the 10.5-ton capacity cooling capacity of the Existing Heat Pumps.

  • Building Systems The term “Building Systems” shall mean collectively the mechanical, electrical, plumbing, sanitary, sprinkler, heating, ventilation and air conditioning, security, life safety, elevator and other service systems or facilities of the Building and the finished ceiling and Building standard lighting fixtures in the Leased Premises, that are excluding any Premises Fixtures.

  • Sprinkler System If there now is or shall be installed in the Building a "sprinkler system", and such system or any of its appliances shall be damaged or injured or not in proper working order by reason of any act or omission of Tenant, Tenant's agents, servants, employees, licensees or visitors, Tenant shall forthwith restore the same to good working condition at its own expense; and if the New York Board of Fire Underwriters or the New York Fire Insurance Rating Organization or any bureau, department or official of the state or city government, shall require or recommend that any changes, modifications, alterations or additional sprinkler heads or other equipment be made or supplied by reason of Tenant's business, or the location of the partitions, trade fixtures, or other contents of the Premises, Tenant shall, at Tenant's expense, promptly make and supply such changes, modifications, alterations, additional sprinkler heads or other equipment.

  • Standard Services Landlord shall provide the following services on all days (unless otherwise stated below): (a) subject to limitations imposed by Law, customary heating, ventilation and air conditioning (“HVAC”) in season during Building HVAC Hours, stubbed to the Premises; (b) electricity supplied by the applicable public utility, stubbed to the Premises; (c) water supplied by the applicable public utility (i) for use in lavatories and any drinking facilities located in Common Areas within the Building, and (ii) stubbed to the Building core for use in any plumbing fixtures located in the Premises; (d) janitorial services to the Premises, except on weekends and Holidays; (c) elevator service (subject to scheduling by Landlord, and payment of Landlord’s standard usage fee, for any freight service); and (f) access to the Building for Tenant and its employees, 24 hours per day/7 days per week, subject to the terms hereof and such security or monitoring systems as Landlord may reasonably impose, including sign-in procedures and/or presentation of identification cards.

  • Infrastructure (a) The Borrower has and will maintain a sufficient infrastructure to conduct its business as presently conducted and as contemplated to be conducted following its execution of this Agreement.

  • Hardware and Software Requirements In order to access and retain Disclosures electronically, you must satisfy the following computer hardware and software requirements: access to the Internet; an email account and related software capable of receiving email through the Internet; a web browser which is SSL-compliant and supports secure sessions, and hardware capable of running this software.

Time is Money Join Law Insider Premium to draft better contracts faster.