After Award of Contract Sample Clauses

After Award of Contract. North Region Headquarters Xx. Xxxxxxx X Roessner Regional Construction - North 000 Xxxxxxx Xx Mount Arlington, NJ 07856 Telephone: 000-000-0000 SECTION 102 – BIDDING REQUIREMENTS AND CONDITIONS 102.01 QUALIFICATION TO BID SECOND CRITERIA IS CHANGED TO:
AutoNDA by SimpleDocs
After Award of Contract. North Region Xx. Xxxxxxx Xxxxxxxx, Regional Construction Engineer 000 Xxxxxxx Xxxxx Mt. Arlington, NJ 00000-0000 Telephone: 973-810 -9140-
After Award of Contract. Xx. Xxxxx Xxxxx, Director of Mobility Engineering 0000 Xxxxxxx Xxxxxx Trenton, NJ 08625 Telephone: 000-000-0000 SECTION 102 – BIDDING REQUIREMENTS AND CONDITIONS 102.04 EXAMINATION OF CONTRACT AND PROJECT LIMITS Project Manager: Xxxx Xxxxxx Email Address: Xxxx.Xxxxxx@xxx.xx.xxx Mailing Address: Mobility Engineering 0000 Xxxxxxx Xxxxxx Trenton, NJ 08625 Telephone: 000-000-0000
After Award of Contract. Central Region Mr. Xxxxxxx Xxxxx, Regional Maintenance Engineer 000 Xxxxxxx Xxx Freehold, NJ 07728 Telephone: 000-000-0000 SECTION 104SCOPE OF WORK 104.01 INTENT THE FOLLOWING IS ADDED: The work to be performed under this contract shall consist of the repair of the roadway surface to restore it to a level which will improve rideability, and the removal of any unsound or locally deteriorated pavement and placement of approved hot mix asphalt material on the areas designated by the RE. The proposed treatment shall consist of milling the roadway surface and resurface with Hot Mix Asphalt 12.5M76 Surface Course or Hot Mix Asphalt 9.5H64 Surface Course as designated by the RE, unless otherwise indicated. Quantities and/or locations may be adjusted by the RE and required completion time will be adjusted accordingly. The Department reserves the right to perform any emergency roadway repair operation within the limits of this contract whenever the department determines that such work is in the public’s interest and safety. The minimum request for “if and where directed” locations will be for the amount in which the aggregate total is $10,000.00. This shall not be construed to imply that each site will be for the amount of $10,000.00. Multiple sites may be submitted in a single request, having an aggregate total of at least $10,000.00. Multiple sites within a single request must be within a 5 mile radius. Additional sites within the request may be identified during the 10 day time period described in Subsection 105.08 Cooperation by Contractor or within the time frame of the construction activities for the request. In no case shall a site be added to an existing request if the site had been identified subsequent to the Contractor removing construction equipment from the 5 mile radius. The radius will be determined by measuring from the center of the initial site on the request. Only those locations on the same highway, or intersecting highways by means of interchanges or at-grade intersections within the 5 mile radius will be constructed as being a single request. The item HMA Patch shall only be used in those areas that were previously milled as a part of this contract and found to be unstable, or, in those areas that were not previously milled as a part of this contract, but are adjacent to and within a distance of 55 yards of the limits of milling. Due to the nature of this contract, it may be necessary to perform construction operations at a particular locat...
After Award of Contract. Submit inquiries to the Resident Engineer indicated below: Xxxxxx Xxxxxxxxx Senior Engineer Roadway Maintenance Engineering and Operations 0000 Xxxxxxx Xxxxxx, P.O. Box 600 Trenton, NJ 00000-0000 Telephone: 000-000-0000 SECTION 102 – BIDDING REQUIREMENTS AND CONDITIONS 102.02 BIDDER REGISTRATION AND DOWNLOADING OF THE PROPOSAL DOCUMENTS THE LAST SENTENCE OF THE FIRST PARAGRAPH IS CHANGED TO: The Bidder shall not alter or in any way change the software.
After Award of Contract. North Region Xx. Xxxx X. Kneidinger, Regional Construction Engineer 000 Xxxxxxx Xxxxx Mt. Arlington, NJ 00000-0000 Telephone: 000-000-0000 SECTION 102 – BIDDING REQUIREMENTS AND CONDITIONS 102.02 BIDDER REGISTRATION AND DOWNLOADING OF THE PROPOSAL DOCUMENTS THE LAST SENTENCE OF THE FIRST PARAGRAPH IS CHANGED TO: The Bidder shall not alter or in any way change the software.

Related to After Award of Contract

  • Award of Contract ITT 41.1 The maximum percentage by which quantities may be increased is: [15%] The maximum percentage by which quantities may be decreased is: [100%]

  • – AWARD OF CONTRACTS II.9.1 If the beneficiary has to conclude contracts in order to carry out the action and they constitute costs of the action under an item of eligible direct costs in the estimated budget, he shall seek competitive tenders from potential contractors and award the contract to the bid offering best value for money; in doing so he shall observe the principles of transparency and equal treatment of potential contractors and shall take care to avoid any conflict of interests.

  • Conditions for Award of Contract 7. The Borrower shall not award any Works contract which involves environmental impacts until:

  • Award of Related Contracts City may undertake or award supplemental or successor contracts for work related to this Contract. The Contractor shall cooperate fully with other contractors and City in all such cases.

  • System for Award Management (XXX) XXX.gov)

  • Award Award shall be made on an all-or-none total estimated bid basis to the lowest responsive and responsible Bidder.

  • System for Award Management (XXX) and Data Universal Numbering System (DUNS) Requirements.

  • Final Award Where the tribunal makes a final award against a party, the tribunal may award, separately or in combination, only:

  • Performance Pay In accordance with Section 8 of the General Appropriations Act for Fiscal Year 2020-2021, contingent upon the availability of funds and at the Agency Head’s discretion, each agency is authorized to grant merit pay increases based on the employee’s exemplary performance, as evidenced by a performance evaluation conducted pursuant to Rule 60L-35, Florida Administrative Code.

  • Award Criteria 40.1 The Procuring Entity shall award the Contract to the successful tenderer whose tender has been determined to be the Lowest Evaluated Tender in accordance with procedures in Section 3: Evaluation and Qualification Criteria.

Time is Money Join Law Insider Premium to draft better contracts faster.