Common use of Adjustment Clause in Contracts

Adjustment. Transportation Charge - Capital Cost Component Adjustments for prior underpayments or overpayments of the capital cost component of the Transportation Charge to the Agency, together with accrued interest charges or credits thereon computed at the then current project interest rate on the amount of the underpayment or overpayment and compounded annually for the number of years from the year the underpayment or overpayment occurred to and including the year following the redetermination, shall be paid in the year following the redetermination: Provided, That the Agency may elect to exercise the option whereby when the redetermined Transportation Charge for the following year, with adjustments, including adjustments of the operation, maintenance, power, and replacement components provided for in subdivision (c) of this article, is more or less than the last estimate of the Charge provided pursuant to Article 27 for the corresponding year, without adjustments, an amount equal to the total of such difference shall be deducted from or added to the adjusted capital cost component for that year and paid or credited in accordance with the following schedule: Percent that Transportation Charge differs from last estimate (+ or -) Period, in years, for amortizing the difference in indicated charge for 10% or less no amortization more than 10%, but not more than 20% 2 more than 20%, but not more than 30% 3 more than 30%, but not more than 40% 4 more than 40%. 5 Such payments or credits shall be in equal semi-annual amounts of principal and interest on or before the 1st day of January and the 1st day of July, with interest computed at the project interest rate and compounded annually, during varying amortization periods as set forth in the preceding schedule: Provided, That for the purpose of determining the above differences in the Transportation Charge, the variable operation, maintenance, power, and replacement component shall be computed on the basis of the same estimated project water deliveries as was assumed in computing pursuant to Article 26(c).

Appears in 6 contracts

Samples: Contract, water.ca.gov, water.ca.gov

AutoNDA by SimpleDocs

Adjustment. Transportation Charge - Capital Cost Component Adjustments for prior underpayments or overpayments of the capital cost component of the Transportation Charge to the Agency, together with accrued interest charges or credits thereon computed at the then current project interest rate on the amount of the underpayment or overpayment and compounded annually for the number of years from the year the underpayment or overpayment occurred to and including the year following the redetermination, shall be paid in the year following the redetermination: Provided, That the Agency may elect to exercise the option whereby when the redetermined Transportation Charge for the following year, with adjustments, including adjustments of the operation, maintenance, power, and replacement components provided for in subdivision (c) of this article, is more or less than the last estimate of the Charge provided pursuant to Article 27 for the corresponding year, without adjustments, an amount equal to the total of such difference shall be deducted from or added to the adjusted capital cost component for that year and paid or credited in accordance with the following schedule: Percent that Transportation Charge differs from last estimate (+ or -) Period, in years, for amortizing the difference in indicated charge for 10% or less no amortization more than 10%, but not more than 20% 2 more than 20%, but not more than 30% 3 more than 30%, but not more than 40% 4 more than 40%. 5 Such payments or credits shall be in equal semi-annual semiannual amounts of principal and interest on or before the 1st day of January and the 1st day of July, with interest computed at the project interest rate and compounded annually, during varying amortization periods as set forth in the preceding schedule: Provided, That for the purpose of determining the above differences in the Transportation Charge, the variable operation, maintenance, power, and replacement component shall be computed on the basis of the same estimated project water deliveries as was assumed in computing pursuant to Article 26(c).

Appears in 3 contracts

Samples: water.ca.gov, water.ca.gov, water.ca.gov

Adjustment. Transportation Charge - Capital Cost Component Component‌ Adjustments for prior underpayments or overpayments of the capital cost component of the Transportation Charge to the Agency, together with accrued interest charges or credits thereon computed at the then current project interest rate on the amount of the underpayment or overpayment and compounded annually for the number of years from the year the underpayment or overpayment occurred to and including the year following the redetermination, shall be paid in the year following the redetermination: Provided, That the Agency may elect to exercise the option whereby when the redetermined Transportation Charge for the following year, with adjustments, including adjustments of the operation, maintenance, power, and replacement components provided for in subdivision (c) of this article, is more or less than the last estimate of the Charge provided pursuant to Article 27 for the corresponding year, without adjustments, an amount equal to the total of such difference shall be deducted from or added to the adjusted capital cost component for that year and paid or credited in accordance with the following schedule: Percent that Transportation Charge differs from last estimate (+ or -) Period, in years, for amortizing the difference in indicated charge for 10% or less no amortization more than 10%, but not more than 20% 2 more than 20%, but not more than 30% 3 more than 30%, but not more than 40% 4 more than 40%. 5 Such payments or credits shall be in equal semi-annual amounts of principal and interest on or before the 1st day of January and the 1st day of July, with interest computed at the project interest rate and compounded annually, during varying amortization periods as set forth in the preceding schedule: Provided, That for the purpose of determining the above differences in the Transportation Charge, the variable operation, maintenance, power, and replacement component shall be computed on the basis of the same estimated project water deliveries as was assumed in computing pursuant to Article 26(c).

Appears in 3 contracts

Samples: www.vcpublicworks.org, water.ca.gov, water.ca.gov

Adjustment. Transportation Charge - Capital Cost Component Adjustments for prior underpayments or overpayments of the capital cost component of the Transportation Charge to the Agency, together with accrued interest charges or credits thereon computed at the then current project interest rate on the amount of the underpayment or overpayment and compounded annually for the number of years from the year the underpayment or overpayment occurred to and including the year following the redetermination, shall be paid in the year following the redetermination: Provided, That the Agency may elect to exercise the option whereby when the redetermined Transportation Charge for the following year, with adjustments, including adjustments of the operation, maintenance, power, and replacement components provided for in subdivision (c) of this article, is more or less than the last estimate of the Charge provided pursuant to Article 27 for the corresponding year, without adjustments, an amount equal to the total of such difference shall be deducted from or added to the adjusted capital cost component for that year and paid or credited in accordance with the following schedule: Percent that Transportation Charge differs from last estimate (+ or -) Period, in years, for amortizing the difference in indicated charge for 10% or less no amortization more than 10%, but not more than 20% 2 more than 20%, but not more than 30% 3 more than 30%, but not more than 40% 4 more than 40%. 5 59 Amended: Amendment 11 60 Amended: Amendment 15 Such payments or credits shall be in equal semi-annual amounts of principal and interest on or before the 1st day of January and the 1st day of July, with interest computed at the project interest rate and compounded annually, during varying amortization periods as set forth in the preceding schedule: Provided, That that for the purpose of determining the above differences difference in the Transportation Charge, the variable operation, maintenance, power, and replacement component shall be computed on the basis of the same estimated project water deliveries as was assumed in computing pursuant to Article 26(c).

Appears in 2 contracts

Samples: water.ca.gov, water.ca.gov

Adjustment. Transportation Charge - Capital Cost Component Component‌ Adjustments for prior underpayments or overpayments of the capital cost component of the Transportation Charge to the AgencyDistrict, together with accrued interest charges or credits thereon computed at the then current project interest rate on the amount of the underpayment or overpayment and compounded annually for the number of years from the year the underpayment or overpayment occurred to and including the year following the redetermination, shall be paid in the year following the redetermination: Provided, That the Agency District may elect to exercise the option whereby when the redetermined Transportation Charge for the following year, with 55 Amended: Amendment 14 adjustments, including adjustments of the operation, maintenance, power, and replacement components provided for in subdivision (c) of this article, is more or less than the last estimate of the Charge provided pursuant to Article 27 for the corresponding year, without adjustments, an amount equal to the total of such difference shall be deducted from or added to the adjusted capital cost component for that year and paid or credited in accordance with the following schedule: Percent that Transportation Charge differs from last estimate (+ or -) Period, in years, for amortizing the difference in indicated charge for 10% or less no amortization more than 10%, but not more than 20% 2 more than 20%, but not more than 30% 3 more than 30%, but not more than 40% 4 more than 40%. 5 Such payments or credits shall be in equal semi-annual amounts of principal and interest on or before the 1st day of January and the 1st day of July, with interest computed at the project interest rate and compounded annually, during varying amortization periods as set forth in the preceding schedule: Provided, That for the purpose of determining the above differences in the Transportation Charge, the variable operation, maintenance, power, and replacement component shall be computed on the basis of the same estimated project water deliveries as was assumed in computing pursuant to Article 26(c).

Appears in 2 contracts

Samples: water.ca.gov, water.ca.gov

Adjustment. Transportation Charge - Capital Cost Component Adjustments for prior underpayments or overpayments of the capital cost component of the Transportation Charge to the Agency, together with accrued interest charges or credits thereon computed at the then current project interest rate on the amount of the underpayment or overpayment and compounded annually for the number of years from the year the underpayment or overpayment occurred to and including the year following the redetermination, shall be paid in the year following the redetermination: Provided, That that the Agency may elect to exercise the option whereby when the redetermined Transportation Charge for the following year, with adjustments, including adjustments of the operation, maintenance, power, and replacement components provided for in subdivision (c) of this article, is more or less than the last estimate of 55 Amended: Amendment No. 12 56 Amended: Amendments No. 10 the Charge provided pursuant to Article 27 for the corresponding year, without adjustments, an amount equal to the total of such difference shall be deducted from or added to the adjusted capital cost component for that year and paid or credited in accordance with the following schedule: Percent that Transportation Charge differs from last estimate (+ or -) Period, in years, for amortizing the difference in indicated charge for 10% or less no amortization more than 10%, but not more than 20% 2 more than 20%, but not more than 30% 3 more than 30%, but not more than 40% 4 more than 40%. 5 Such payments or credits shall be in equal semi-annual amounts of principal and interest on or before the 1st day of January and the 1st day of July, with interest computed at the project interest rate and compounded annually, during varying amortization periods as set forth in the preceding schedule: Provided, That that for the purpose of determining the above differences difference in the Transportation Charge, the variable operation, maintenance, power, and replacement component shall be computed on the basis of the same estimated project water deliveries as was assumed in computing pursuant to Article 26(c).

Appears in 2 contracts

Samples: water.ca.gov, water.ca.gov

Adjustment. Transportation Charge - Capital Cost Component Component‌ Adjustments for prior underpayments or overpayments of the capital cost component of the Transportation Charge to the AgencyDistrict, together with accrued interest charges or credits thereon computed at the then current project interest rate on the amount of the underpayment or overpayment and compounded annually for the number of years from the year the underpayment or overpayment occurred to and including the year following the redetermination, shall be paid in the year following the redetermination: Provided, That the Agency District may elect to exercise the option whereby when the redetermined Transportation Charge for the following year, with adjustments, including adjustments of the operation, maintenance, power, and replacement components provided for in subdivision (c) of this article, is more or less than the last estimate of the Charge provided pursuant to Article 27 for the corresponding year, without adjustments, an amount equal to the total of such difference shall be deducted from or added to the adjusted capital cost component for that year and paid or credited in accordance with the following schedule: Percent that Transportation Charge differs from last estimate (+ or -) Period, in years, for amortizing the difference in indicated charge for 10% or less no amortization more than 10%, but not more than 20% 2 more than 20%, but not more than 30% 3 more than 30%, but not more than 40% 4 more than 40%. 5 Such payments or credits shall be in equal semi-annual amounts of principal and interest on or before the 1st day of January and the 1st day of July, with interest computed at the project interest rate and compounded annually, during varying amortization periods as set forth in the preceding schedule: Provided, That for the purpose of determining the above differences in the Transportation Charge, the variable operation, maintenance, power, and replacement component shall be computed on the basis of the same estimated project water deliveries as was assumed in computing pursuant to Article 26(c).

Appears in 2 contracts

Samples: water.ca.gov, water.ca.gov

Adjustment. Transportation Charge - Capital Cost Component Component‌ Adjustments for prior underpayments or overpayments of the capital cost component of the Transportation Charge to the Agency, together with accrued interest charges or credits thereon computed at the then current project interest rate on the amount of the underpayment or overpayment and compounded annually for the number of years from the year the underpayment or overpayment occurred to and including the year following the redetermination, shall be paid in the year following the redetermination: Provided, That the Agency may elect to exercise the option whereby when the redetermined Transportation Charge for the following year, with adjustments, including adjustments of the operation, maintenance, power, and replacement components provided for in subdivision (c) of this article, is more or less than the last estimate of the Charge provided pursuant to Article 27 for the corresponding year, without adjustments, an amount equal to the total of such difference shall be deducted from or added to the adjusted capital cost component for that year and paid or credited in accordance with the following schedule: Percent that Transportation Charge differs from last estimate (+ or -) Period, in years, for amortizing the difference in indicated charge for 10% or less no amortization more than 10%, but not more than 20% 2 more than 20%, but not more than 30% 3 more than 30%, but not more than 40% 4 more than 40%. 5 Such payments or credits shall be in equal semi-annual semiannual amounts of principal and interest on or before the 1st day of January and the 1st day of July, with interest computed at the project interest rate and compounded annually, during varying amortization periods as set forth in the preceding schedule: Provided, That for the purpose of determining the above differences in the Transportation Charge, the variable operation, maintenance, power, and replacement component shall be computed on the basis of the same estimated project water deliveries as was assumed in computing pursuant to Article 26(c).

Appears in 2 contracts

Samples: water.ca.gov, water.ca.gov

Adjustment. Transportation Charge - Capital Cost Component Component‌ Adjustments for prior underpayments or overpayments of the capital cost component of the Transportation Charge to the Agency, together with accrued interest charges or credits thereon computed at the then current project interest rate on the amount of the underpayment or overpayment and compounded annually for the number of years from the year the underpayment or overpayment occurred to and including the year following the redetermination, shall be paid in the year following the redetermination: Provided, That the Agency may elect to exercise the option whereby when the redetermined Transportation Charge for the following year, with adjustments, including adjustments of the operation, maintenance, power, and replacement components provided for in subdivision (c) of this article, is more or less than the last estimate of the Charge provided pursuant to Article 27 for the corresponding year, without adjustments, an amount equal to the total of such difference shall be deducted from or added to the adjusted capital cost component for that year and paid or credited in accordance with the following schedule: Percent that Transportation Charge differs from last estimate (+ or -) Period, in years, for amortizing the difference in indicated charge for 10% or less no amortization more than 10%, but not more than 20% 2 more than 20%, but not more than 30% 3 more than 30%, but not more than 40% 4 more than 40%. 5 Such payments or credits shall be in equal semi-annual amounts of principal and interest on or before the 1st day of January and the 1st day of July, with interest computed at the project interest rate and compounded annually, during varying amortization periods as set forth in the preceding schedule: Provided, That that for the purpose of determining the above differences difference in the Transportation Charge, the variable operation, maintenance, power, and replacement component shall be computed on the basis of the same estimated project water deliveries as was assumed in computing pursuant to Article 26(c).

Appears in 1 contract

Samples: water.ca.gov

Adjustment. Transportation Charge - Capital Cost Component Adjustments for prior underpayments or overpayments of the capital cost component of the Transportation Charge to the Agency, together with accrued interest charges or credits thereon computed at the then current project interest rate on the amount of the underpayment or overpayment and compounded annually for the number of years from the year the underpayment or overpayment occurred to and including the year following the redetermination, shall be paid in the year following the redetermination: Provided, That the Agency may elect to exercise the option whereby when the redetermined Transportation Charge for the following year, with adjustments, including adjustments of the operation, maintenance, power, and replacement components provided for in subdivision (c) of this article, is more or less than the last estimate of the Charge provided pursuant to Article 27 for the corresponding year, without adjustments, an amount equal to the total of such difference shall be deducted from or added to the adjusted capital cost component for that year and paid or credited in accordance with the following schedule: 50 Amended: Amendment 10 Percent that Transportation Charge differs from last estimate (+ or -) Period, in years, for amortizing the difference in indicated charge for 10% or less no amortization more than 10%, but not more than 20% 2 more than 20%, but not more than 30% 3 more than 30%, but not more than 40% 4 more than 40%. 5 Such payments or credits shall be in equal semi-annual amounts of principal and interest on or before the 1st day of January and the 1st day of July, with interest computed at the project interest rate and compounded annually, during varying amortization periods as set forth in the preceding schedule: Provided, That that for the purpose of determining the above differences difference in the Transportation Charge, the variable operation, maintenance, power, and replacement component shall be computed on the basis of the same estimated project water deliveries as was assumed in computing pursuant to Article 26(c).

Appears in 1 contract

Samples: water.ca.gov

Adjustment. Transportation Charge - Capital Cost Component Adjustments for prior underpayments or overpayments of the capital cost component of the Transportation Charge to the Agency, together with accrued interest charges or credits thereon computed at the then current project interest rate on the amount of the underpayment or overpayment and compounded annually for the number of years from the year the underpayment 45 Added: Amendment 11 or overpayment occurred to and including the year following the redetermination, shall be paid in the year following the redetermination: Provided, That the Agency may elect to exercise the option whereby when the redetermined Transportation Charge for the following year, with adjustments, including adjustments of the operation, maintenance, power, and replacement components provided for in subdivision (c) of this article, is more or less than the last estimate of the Charge provided pursuant to Article 27 for the corresponding year, without adjustments, an amount equal to the total of such difference shall be deducted from or added to the adjusted capital cost component for that year and paid or credited in accordance with the following schedule: Percent that Transportation Charge differs from last estimate (+ or -) Period, in years, for amortizing the difference in indicated charge for 10% or less no amortization more than 10%, but not more than 20% 2 more than 20%, but not more than 30% 3 more than 30%, but not more than 40% 4 more than 40%. 5 Such payments or credits shall be in equal semi-annual amounts of principal and interest on or before the 1st day of January and the 1st day of July, with interest computed at the project interest rate and compounded annually, during varying amortization periods as set forth in the preceding schedule: Provided, That for the purpose of determining the above differences in the Transportation Charge, the variable operation, maintenance, power, and replacement component shall be computed on the basis of the same estimated project water deliveries as was assumed in computing pursuant to Article 26(c).

Appears in 1 contract

Samples: water.ca.gov

Adjustment. Transportation Charge - Capital Cost Component Component‌ Adjustments for prior underpayments or overpayments of the capital cost component of the Transportation Charge to the Agency, together with accrued interest charges or credits thereon computed at the then current project interest rate on the amount of the underpayment or overpayment and compounded annually for the number of years from the year the underpayment 45 Added: Amendment 11 or overpayment occurred to and including the year following the redetermination, shall be paid in the year following the redetermination: Provided, That the Agency may elect to exercise the option whereby when the redetermined Transportation Charge for the following year, with adjustments, including adjustments of the operation, maintenance, power, and replacement components provided for in subdivision (c) of this article, is more or less than the last estimate of the Charge provided pursuant to Article 27 for the corresponding year, without adjustments, an amount equal to the total of such difference shall be deducted from or added to the adjusted capital cost component for that year and paid or credited in accordance with the following schedule: Percent that Transportation Charge differs from last estimate (+ or -) Period, in years, for amortizing the difference in indicated charge for 10% or less no amortization more than 10%, but not more than 20% 2 more than 20%, but not more than 30% 3 more than 30%, but not more than 40% 4 more than 40%. 5 Such payments or credits shall be in equal semi-annual amounts of principal and interest on or before the 1st day of January and the 1st day of July, with interest computed at the project interest rate and compounded annually, during varying amortization periods as set forth in the preceding schedule: Provided, That for the purpose of determining the above differences in the Transportation Charge, the variable operation, maintenance, power, and replacement component shall be computed on the basis of the same estimated project water deliveries as was assumed in computing pursuant to Article 26(c).

Appears in 1 contract

Samples: water.ca.gov

Adjustment. Transportation Charge - Charge-Capital Cost Component Adjustments for prior underpayments or overpayments of the capital cost component of the Transportation Charge to the Agency, together with accrued interest charges or credits thereon computed at the then current project interest rate on the amount of the underpayment or overpayment and compounded annually for the number of years from the year the underpayment or overpayment occurred to and including the year following the redetermination, shall be paid in the year following the redetermination: Provided, That the Agency may elect to exercise the option whereby when the redetermined Transportation Charge for the following year, with adjustments, including adjustments of the operation, maintenance, power, and replacement components provided for in subdivision (c) of this article, is more or less than the last estimate of the Charge provided pursuant to Article 27 for the corresponding year, without adjustments, an amount equal to the total of such difference shall be deducted from or added to the adjusted capital cost component for that year and paid or credited in accordance with the following schedule: Percent that Transportation Charge differs from last estimate (+ or -) Period, in years, for amortizing the difference in indicated charge for 10% or less no amortization more than 10%, but not more than 20% 2 more than 20%, but not more than 30% 3 more than 30%, but not more than 40% 4 more than 40%. 5 Such payments or credits shall be in equal semi-annual amounts of principal and interest on or before the 1st day of January and the 1st day of July, with interest computed at the project interest rate and compounded annually, during varying amortization periods as set forth in the preceding schedule: Provided, That for the purpose of determining the above differences in the Transportation Charge, the variable operation, maintenance, power, and replacement component shall be computed on the basis of the same estimated project water deliveries as was assumed in computing pursuant to Article 26(c).

Appears in 1 contract

Samples: s3-us-west-2.amazonaws.com

Adjustment. Transportation Charge - Capital Cost Component Component‌ Adjustments for prior underpayments or overpayments of the capital cost component of the Transportation Charge to the Agency, together with accrued interest charges or credits thereon computed at the then current project interest rate on the amount of the underpayment or overpayment and compounded annually for the number of years from the year the underpayment or overpayment occurred to and including the year following the redetermination, shall be paid in the year following the redetermination: Provided, That the Agency may elect to exercise the option whereby when the redetermined Transportation Charge for the following year, with adjustments, including adjustments of the operation, maintenance, power, and replacement components provided for in subdivision (c) of this article, is more or less than the last estimate of the Charge provided pursuant to Article 27 for the corresponding year, without adjustments, an amount equal to the total of such difference shall be deducted from or added to the adjusted capital cost component for that year and paid or credited in accordance with the following schedule: 45 Amended: Amendment 8 Percent that Transportation Charge differs from last estimate (+ or -) Period, in years, for amortizing the difference in indicated charge for 10% or less no amortization more than 10%, but not more than 20% 2 more than 20%, but not more than 30% 3 more than 30%, but not more than 40% 4 more than 40%. 5 Such payments or credits shall be in equal semi-annual amounts of principal and interest on or before the 1st day of January and the 1st day of July, with interest computed at the project interest rate and compounded annually, during varying amortization periods as set forth in the preceding schedule: Provided, That for the purpose of determining the above differences in the Transportation Charge, the variable operation, maintenance, power, and replacement component shall be computed on the basis of the same estimated project water deliveries as was assumed in computing pursuant to Article 26(c).

Appears in 1 contract

Samples: water.ca.gov

Adjustment. Transportation Charge - Capital Cost Component Adjustments for prior underpayments or overpayments of the capital cost component of the Transportation Charge to the Agency, together with accrued interest charges or credits thereon computed at the then current project interest rate on the amount of the underpayment or overpayment and compounded annually for the number of years from the year the underpayment or overpayment occurred to and including the year following the redetermination, shall be paid in the year following the redetermination: Provided, That the Agency may elect to exercise the option whereby when the redetermined Transportation Charge for the following year, with adjustments, including adjustments of the operation, maintenance, power, and replacement components provided for in subdivision (c) of this article, is more or less than the last estimate of the Charge provided pursuant to Article 27 for the corresponding year, without adjustments, an amount equal to the total of such difference shall be deducted from or added to the adjusted capital cost component for that year and paid or credited in accordance with the following schedule: Percent that Transportation Charge differs from last estimate (+ or -) Period, in years, for amortizing the difference in indicated charge for 10% or less no amortization more than 10%, but not more than 20% 2 more than 20%, but not more than 30% 3 more than 30%, but not more than 40% 4 more than 40%. 5 44 Amended: Amendment 7, (a)-(d) Such payments or credits shall be in equal semi-annual amounts of principal and interest on or before the 1st day of January and the 1st day of July, with interest computed at the project interest rate and compounded annually, during varying amortization periods as set forth in the preceding schedule: Provided, That for the purpose of determining the above differences in the Transportation Charge, the variable operation, maintenance, power, and replacement component shall be computed on the basis of the same estimated project water deliveries as was assumed in computing pursuant to Article 26(c).

Appears in 1 contract

Samples: water.ca.gov

Adjustment. Transportation Charge - Capital Cost Component Adjustments for prior underpayments or overpayments of the capital cost component of the Transportation Charge to the AgencyDistrict, together with accrued interest charges or credits 53 Amendment 10; (a)-(d) thereon computed at the then current project interest rate on the amount of the underpayment or overpayment and compounded annually for the number of years from the year the underpayment or overpayment occurred to and including the year following the redetermination, shall be paid in the year following the redetermination: Provided, That the Agency District may elect to exercise the option whereby when the redetermined Transportation Charge for the following year, with adjustments, including adjustments of the operation, maintenance, power, and replacement components provided for in subdivision (c) of this article, is more or less than the last estimate of the Charge provided pursuant to Article 27 for the corresponding year, without adjustments, an amount equal to the total of such difference shall be deducted from or added to the adjusted capital cost component for that year and paid or credited in accordance with the following schedule: Percent that Transportation Charge differs from last estimate (+ or -) Period, in years, for amortizing the difference in indicated charge for 10% or less no amortization more than 10%, but not more than 20% 2 more than 20%, but not more than 30% 3 more than 30%, but not more than 40% 4 more than 40%. 5 Such payments or credits shall be in equal semi-annual amounts of principal and interest on or before the 1st day of January and the 1st day of July, with interest computed at the project interest rate and compounded annually, during varying amortization periods as set forth in the preceding schedule: Provided, That for the purpose of determining the above differences in the Transportation Charge, the variable operation, maintenance, power, and replacement component shall be computed on the basis of the same estimated project water deliveries as was assumed in computing pursuant to Article 26(c).

Appears in 1 contract

Samples: water.ca.gov

Adjustment. Transportation Charge - Capital Cost Component Adjustments for prior underpayments or overpayments of the capital cost component of the Transportation Charge to the Agency, together with accrued interest charges or credits thereon computed at the then current project interest rate on the amount of the underpayment or overpayment and compounded annually for the number of years from the year the underpayment or overpayment occurred to and including the year following the redetermination, shall be paid in the year following the redetermination: Provided, That the Agency may elect to exercise the option whereby when the redetermined Transportation Charge for the following year, with adjustments, including adjustments of the operation, maintenance, power, and replacement components provided for in subdivision (c) of this article, is more or less than the last estimate of the Charge provided pursuant to Article 27 for the corresponding year, without adjustments, an amount equal to the total of such difference shall be deducted from or added to the adjusted capital cost component for that year and paid or credited in accordance with the following schedule: Percent that Transportation Charge differs from last estimate (+ or -) Period, in years, for amortizing the difference in indicated charge for 10% or less no amortization more than 10%, but not more than 20% 2 more than 20%, but not more than 30% 3 more than 30%, but not more than 40% 4 more than 40%. 5 Such payments or credits shall be in equal semi-annual amounts of principal and interest on or before the 1st day of January and the 1st day of July, with interest computed at the project interest rate and compounded annually, during varying amortization periods as set forth in the 43 Amended: Amendment No. 6 preceding schedule: Provided, That for the purpose of determining the above differences in the Transportation Charge, the variable operation, maintenance, power, and replacement component shall be computed on the basis of the same estimated project water deliveries as was assumed in computing pursuant to Article 26(c).

Appears in 1 contract

Samples: water.ca.gov

Adjustment. Transportation Charge - Capital Cost Component Adjustments for prior underpayments or overpayments of the capital cost component of the Transportation Charge to the Agency, together with accrued interest charges or credits thereon computed at the then current project interest rate on the amount of the underpayment or overpayment and compounded annually for the number of years from the year the underpayment or overpayment occurred to and including the year following the redetermination, shall be paid in the year following the redetermination: Provided, That the Agency may elect to exercise the option whereby when the redetermined Transportation Charge for the following year, with adjustments, including adjustments of the operation, maintenance, power, and replacement components provided for in subdivision (c) of this article, is more or less than the last estimate of the Charge provided pursuant to Article 27 for the corresponding year, without adjustments, an amount equal to the total of such difference shall be deducted from or added to the adjusted capital cost component for that year and paid or credited in accordance with the following schedule: Percent that Transportation Charge differs from last estimate (+ or -) Period, in years, for amortizing the difference in indicated charge for 10% or less no amortization more than 10%, but not more than 20% 2 more than 20%, but not more than 30% 3 more than 30%, but not more than 40% 4 more than 40%. 5 Such payments or credits shall be in equal semi-annual amounts of principal and interest on or before the 1st day of January and the 1st day of July, with interest computed at the project interest rate and compounded annually, during varying amortization periods as set forth in the preceding schedule: Provided, That for the purpose of determining the above differences in the Transportation Charge, the variable operation, maintenance, power, and replacement component shall be computed on the basis of the same estimated project water deliveries as was assumed in computing pursuant to Article 26(c).

Appears in 1 contract

Samples: water.ca.gov

Adjustment. Transportation Charge - Capital Cost Component Adjustments for prior underpayments or overpayments of the capital cost component of the Transportation Charge to the Agency, together with accrued interest charges or credits thereon computed at the then current project interest rate on the amount of the underpayment or overpayment and compounded annually for the number of years from the year the underpayment or overpayment occurred to and including the year following the redetermination, shall be paid in the year following the redetermination: Provided, That the Agency may elect to exercise the option whereby when the redetermined Transportation Charge for the following year, with 44 Amended (a)-(d): Amendment No. 12 adjustments, including adjustments of the operation, maintenance, power, and replacement components provided for in subdivision (c) of this article, is more or less than the last estimate of the Charge provided pursuant to Article 27 for the corresponding year, without adjustments, an amount equal to the total of such difference shall be deducted from or added to the adjusted capital cost component for that year and paid or credited in accordance with the following schedule: Percent that Transportation Charge differs from last estimate (+ or -) Period, in years, for amortizing the difference in indicated charge for 10% or less no amortization more than 10%, but not more than 20% 2 more than 20%, but not more than 30% 3 more than 30%, but not more than 40% 4 more than 40%. 5 Such payments or credits shall be in equal semi-annual semiannual amounts of principal and interest on or before the 1st day of January and the 1st day of July, with interest computed at the project interest rate and compounded annually, during varying amortization periods as set forth in the preceding schedule: Provided, That for the purpose of determining the above differences in the Transportation Charge, the variable operation, maintenance, power, and replacement component shall be computed on the basis of the same estimated project water deliveries as was assumed in computing pursuant to Article 26(c).

Appears in 1 contract

Samples: water.ca.gov

Adjustment. Transportation Charge - Capital Cost Component Component‌ Adjustments for prior underpayments or overpayments of the capital cost component of the Transportation Charge to the AgencyDistrict, together with accrued interest charges or credits thereon computed at the then current project interest rate on the amount of the underpayment or overpayment and compounded annually for the number of years from the year the underpayment or overpayment occurred to and including the year following the redetermination, shall be paid 53 Amendment 15; (a)-(f) in the year following the redetermination: Provided, That the Agency District may elect to exercise the option whereby when the redetermined Transportation Charge for the following year, with adjustments, including adjustments of the operation, maintenance, power, and replacement components provided for in subdivision (c) of this article, is more or less than the last estimate of the Charge provided pursuant to Article 27 for the corresponding year, without adjustments, an amount equal to the total of such difference shall be deducted from or added to the adjusted capital cost component for that year and paid or credited in accordance with the following schedule: Percent that Transportation Charge differs from last estimate (+ or -) Period, in years, for amortizing the difference in indicated charge for 10% or less no amortization more than 10%, but not more than 20% 2 more than 20%, but not more than 30% 3 more than 30%, but not more than 40% 4 more than 40%. 5 Such payments or credits shall be in equal semi-annual amounts of principal and interest on or before the 1st day of January and the 1st day of July, with interest computed at the project interest rate and compounded annually, during varying amortization periods as set forth in the preceding schedule: Provided, That for the purpose of determining the above differences difference in the Transportation Charge, the variable operation, maintenance, power, and replacement component shall be computed on the basis of the same estimated project water deliveries as was assumed in computing pursuant to Article 26(c).

Appears in 1 contract

Samples: water.ca.gov

Adjustment. Transportation Charge - Capital Cost Component Adjustments for prior underpayments or overpayments of the capital cost component of the Transportation Charge to the Agency, together with accrued interest charges or credits thereon computed at the then current project interest rate on the amount of the underpayment or overpayment and compounded annually for the number of years from the year the underpayment or overpayment occurred to and including the year following the redetermination, shall be paid in the year following the redetermination: Provided, That the Agency may elect to exercise the option whereby when the redetermined Transportation Charge for the following year, with adjustments, including adjustments of the operation, maintenance, power, and replacement components provided for in subdivision (c) of this article, is more or less than the last estimate of the Charge provided pursuant to Article 27 for the corresponding year, without adjustments, an amount equal to the total of such difference shall be deducted from or added to the adjusted capital cost component for that year and paid or credited in accordance with the following schedule: 43 Amended: Amendment 7 Percent that Transportation Charge differs from last estimate (+ or -) Period, in years, for amortizing the difference in indicated charge for 10% or less no amortization more than 10%, but not more than 20% 2 more than 20%, but not more than 30% 3 more than 30%, but not more than 40% 4 more than 40%. 5 Such payments or credits shall be in equal semi-annual amounts of principal and interest on or before the 1st day of January and the 1st day of July, with interest computed at the project interest rate and compounded annually, during varying amortization periods as set forth in the preceding schedule: Provided, That for the purpose of determining the above differences in the Transportation Charge, the variable operation, maintenance, power, and replacement component shall be computed on the basis of the same estimated project water deliveries as was assumed in computing pursuant to Article 26(c).

Appears in 1 contract

Samples: www.slocounty.ca.gov

AutoNDA by SimpleDocs

Adjustment. Transportation Charge - Capital Cost Component Adjustments for prior underpayments or overpayments of the capital cost component of the Transportation Charge to the AgencyDistrict, together with accrued interest charges or credits thereon computed at the then current project interest rate on the amount of the underpayment or overpayment and compounded annually for the number of years from the year the underpayment or overpayment occurred to and including the year following the redetermination, shall be paid in the year following the redetermination: Provided, That the Agency District may elect to exercise the option whereby when the redetermined Transportation Charge for the following year, with adjustments, including adjustments of the operation, maintenance, power, and replacement components provided for in subdivision (c) of this article, is more or less than the last estimate of the Charge provided pursuant to Article 27 for the corresponding year, without adjustments, an amount equal to the total of such difference shall be deducted from or added to the adjusted capital cost component for that year and paid or credited in accordance with the following schedule: Percent that Transportation Charge differs from last estimate (+ or -) Period, in years, for amortizing the difference in indicated charge for 10% or less no amortization more than 10%, but not more than 20% 2 more than 20%, but not more than 30% 3 more than 30%, but not more than 40% 4 more than 40%. 5 Such payments or credits shall be in equal semi-annual amounts of principal and interest on or before the 1st day of January and the 1st day of July, with interest computed at the project interest rate and compounded annually, during varying amortization periods as set forth in the preceding schedule: Provided, That for the purpose of determining the above differences in the Transportation Charge, the variable operation, maintenance, power, and replacement component shall be computed on the basis of the same estimated project water deliveries as was assumed in computing pursuant to Article 26(c).

Appears in 1 contract

Samples: water.ca.gov

Adjustment. Transportation Charge - Capital Cost Component Adjustments for prior underpayments or overpayments of the capital cost component of the Transportation Charge to the Agency, together with accrued interest charges or credits thereon computed at the then current project interest rate on the amount of the underpayment or overpayment and compounded annually for the number of years from the year the underpayment or overpayment occurred to and including the year following the redetermination, shall be paid in the year following the redetermination: Provided, That the Agency may elect to exercise the option whereby when the redetermined Transportation Charge for the following year, with adjustments, including adjustments of the operation, maintenance, power, and replacement components provided for in subdivision (c) of this article, is more or less than the last estimate of the Charge provided pursuant to Article 27 for the corresponding year, without adjustments, an amount equal to the total of such difference shall be deducted from or added to the adjusted capital cost component for that year and paid or credited in accordance with the following schedule: 49 Amended: Amendment 8 Percent that Transportation Charge differs from last estimate (+ or -) Period, in years, for amortizing the difference in indicated charge for 10% or less no amortization more than 10%, but not more than 20% 2 more than 20%, but not more than 30% 3 more than 30%, but not more than 40% 4 more than 40%. 5 Such payments or credits shall be in equal semi-annual amounts of principal and interest on or before the 1st day of January and the 1st day of July, with interest computed at the project interest rate and compounded annually, during varying amortization periods as set forth in the preceding schedule: Provided, That for the purpose of determining the above differences in the Transportation Charge, the variable operation, maintenance, power, and replacement component shall be computed on the basis of the same estimated project water deliveries as was assumed in computing pursuant to Article 26(c).

Appears in 1 contract

Samples: water.ca.gov

Adjustment. Transportation Charge - Capital Cost Component Adjustments for prior underpayments or overpayments of the capital cost component of the Transportation Charge to the Agency, together with accrued interest charges or credits thereon computed at the then current project interest rate on the amount of the underpayment or overpayment and compounded annually for the number of years from the year the underpayment or overpayment occurred to and including the year following the redetermination, shall be paid in the year following the redetermination: Provided, That the Agency may elect to exercise the option whereby when the redetermined Transportation Charge for the following year, with adjustments, including adjustments of the operation, maintenance, power, and replacement components provided for in subdivision (c) of this article, is more or less than the last estimate of the Charge provided pursuant to Article 27 for the corresponding year, without adjustments, an amount equal to the total of such difference shall be deducted from or added to the adjusted capital cost component for that year and paid or credited in accordance with the following schedule: Percent that Transportation Charge differs from last estimate (+ or -) Period, in years, for amortizing the difference in indicated charge for 10% or less no amortization more than 10%, but not more than 20% 2 more than 20%, but not more than 30% 3 more than 30%, but not more than 40% 4 more than 40%. 5 52 Amended (a)-(d): Amendment No. 9 Such payments or credits shall be in equal semi-annual amounts of principal and interest on or before the 1st day of January and the 1st day of July, with interest computed at the project interest rate and compounded annually, during varying amortization periods as set forth in the preceding schedule: Provided, That for the purpose of determining the above differences in the Transportation Charge, the variable operation, maintenance, power, and replacement component shall be computed on the basis of the same estimated project water deliveries as was assumed in computing pursuant to Article 26(c).

Appears in 1 contract

Samples: water.ca.gov

Adjustment. Transportation Charge - Capital Cost Component Adjustments for prior underpayments or overpayments of the capital cost component of the Transportation Charge to the Agency, together with accrued interest charges or credits thereon computed at the then current project interest rate on the amount of the underpayment or overpayment and compounded annually for the number of years from the year the underpayment or overpayment occurred to and including the year following the redetermination, shall be paid in the year following the redetermination: Provided, That that the Agency may elect to exercise the option whereby when the redetermined Transportation Charge for the following year, with adjustments, including adjustments of the operation, maintenance, power, and replacement components provided for in subdivision (c) of this article, is more or less than the last estimate of 52 Amended: Amendment No. 13 the Charge provided pursuant to Article 27 for the corresponding year, without adjustments, an amount equal to the total of such difference shall be deducted from or added to the adjusted capital cost component for that year and paid or credited in accordance with the following schedule: Percent that Transportation Charge differs from last estimate (+ or -) Period, in years, for amortizing the difference in indicated charge for 10% or less no amortization more than 10%, but not more than 20% 2 more than 20%, but not more than 30% 3 more than 30%, but not more than 40% 4 more than 40%. 5 Such payments or credits shall be in equal semi-annual amounts of principal and interest on or before the 1st day of January and the 1st day of July, with interest computed at the project interest rate and compounded annually, during varying amortization periods as set forth in the preceding schedule: Provided, That that for the purpose of determining the above differences difference in the Transportation Charge, the variable operation, maintenance, power, and replacement component shall be computed on the basis of the same estimated project water deliveries as was assumed in computing pursuant to Article 26(c).

Appears in 1 contract

Samples: water.ca.gov

Adjustment. Transportation Charge - Capital Cost Component Component‌ Adjustments for prior underpayments or overpayments of the capital cost component of the Transportation Charge to the Agency, together with accrued interest charges or credits thereon computed at the then current project interest rate on the amount of the underpayment or overpayment and compounded annually for the number of years from the year the underpayment or overpayment occurred to and including the year following the redetermination, shall be paid in the year following the redetermination: Provided, That the Agency may elect to exercise the option whereby when the redetermined Transportation Charge for the following year, with adjustments, including adjustments of the operation, maintenance, power, and replacement components provided for in subdivision (c) of this article, is more or less than the last estimate of the Charge provided pursuant to Article 27 for the corresponding year, without adjustments, an amount equal to the total of such difference shall be deducted from or added to the adjusted capital cost component for that year and paid or credited in accordance with the following schedule: Percent that Transportation Charge differs from last estimate (+ or -) Period, in years, for amortizing the difference in indicated charge for 10% or less no amortization more than 10%, but not more than 20% 2 more than 20%, but not more than 30% 3 more than 30%, but not more than 40% 4 more than 40%. 5 Such payments or credits shall be in equal semi-annual amounts of principal and interest on or before the 1st day of January and the 1st day of July, with interest computed at the project interest rate and compounded annually, during varying amortization periods as set forth in the preceding schedule: Provided, That for the purpose of determining the above differences in the Transportation Charge, the variable operation, maintenance, power, and replacement component shall be computed on the basis of the same estimated project water deliveries as was assumed in computing pursuant to Article 26(c).

Appears in 1 contract

Samples: water.ca.gov

Adjustment. Transportation Charge - Capital Cost Component Adjustments for prior underpayments or overpayments of the capital cost component of the Transportation Charge to the Agency, together with accrued interest charges or credits thereon computed at the then current project interest rate on the amount of the underpayment or overpayment and compounded annually for the number of years from the year the underpayment or overpayment occurred to and including the year following the redetermination, shall be paid in the year following the redetermination: Provided, That the Agency may elect to exercise the option whereby when the redetermined Transportation Charge for the following year, with adjustments, including adjustments of the operation, maintenance, power, and replacement components provided for in subdivision (c) of this article, is more or less than the last estimate of the Charge provided pursuant to Article 27 for the corresponding year, without adjustments, an amount equal to the total of such difference shall be deducted from or added to the adjusted capital cost component for that year and paid or credited in accordance with the following schedule: Percent that Transportation Charge differs from last estimate (+ or -) Period, in years, for amortizing the difference in indicated charge for 10% or less no amortization more than 10%, but not more than 20% 2 more than 20%, but not more than 30% 3 more than 30%, but not more than 40% 4 more than 40%. 5 Such payments or credits shall be in equal semi-annual amounts of principal and interest on or before the 1st day of January and the 1st day of July, with interest computed at the project interest rate and compounded annually, during varying amortization periods as set forth in the preceding schedule: Provided, That that for the purpose of determining the above differences difference in the Transportation Charge, the variable operation, maintenance, power, and replacement component shall be computed on the basis of the same estimated project water deliveries as was assumed in computing pursuant to Article 26(c).

Appears in 1 contract

Samples: water.ca.gov

Adjustment. Transportation Charge - Capital Cost Component Adjustments for prior underpayments or overpayments of the capital cost component of the Transportation Charge to the AgencyDistrict, together with accrued interest charges or credits thereon computed at the then current project interest rate on the amount of the underpayment or overpayment and compounded annually for the number of years from the year the underpayment 53 Amendment 15; (a)-(f) or overpayment occurred to and including the year following the redetermination, shall be paid in the year following the redetermination: Provided, That the Agency District may elect to exercise the option whereby when the redetermined Transportation Charge for the following year, with adjustments, including adjustments of the operation, maintenance, power, and replacement components provided for in subdivision (c) of this article, is more or less than the last estimate of the Charge provided pursuant to Article 27 for the corresponding year, without adjustments, an amount equal to the total of such difference shall be deducted from or added to the adjusted capital cost component for that year and paid or credited in accordance with the following schedule: Percent that Transportation Charge differs from last estimate (+ or -) Period, in years, for amortizing the difference in indicated charge for 10% or less no amortization more than 10%, but not more than 20% 2 more than 20%, but not more than 30% 3 more than 30%, but not more than 40% 4 more than 40%. 5 Such payments or credits shall be in equal semi-annual amounts of principal and interest on or before the 1st day of January and the 1st day of July, with interest computed at the project interest rate and compounded annually, during varying amortization periods as set forth in the preceding schedule: Provided, That for the purpose of determining the above differences difference in the Transportation Charge, the variable operation, maintenance, power, and replacement component shall be computed on the basis of the same estimated project water deliveries as was assumed in computing pursuant to Article 26(c).

Appears in 1 contract

Samples: water.ca.gov

Adjustment. Transportation Charge - Capital Cost Component Adjustments for prior underpayments or overpayments of the capital cost component of the Transportation Charge to the Agency, together with accrued interest charges or credits thereon computed at the then current project interest rate on the amount of the underpayment or overpayment and compounded annually for the number of years from the year the underpayment or overpayment occurred to and including the year following the redetermination, shall be paid in the year following the redetermination: Provided, That the Agency may elect to exercise the option whereby when the redetermined Transportation Charge for the following year, with adjustments, including adjustments of the operation, maintenance, power, and replacement components provided for in subdivision (c) of this article, is more or less than the last estimate of the Charge provided pursuant to Article 27 for the corresponding year, without adjustments, an 50 Amended: Amendment 10 amount equal to the total of such difference shall be deducted from or added to the adjusted capital cost component for that year and paid or credited in accordance with the following schedule: Percent that Transportation Charge differs from last estimate (+ or -) Period, in years, for amortizing the difference in indicated charge for 10% or less no amortization more than 10%, but not more than 20% 2 more than 20%, but not more than 30% 3 more than 30%, but not more than 40% 4 more than 40%. 5 Such payments or credits shall be in equal semi-annual amounts of principal and interest on or before the 1st day of January and the 1st day of July, with interest computed at the project interest rate and compounded annually, during varying amortization periods as set forth in the preceding schedule: Provided, That that for the purpose of determining the above differences difference in the Transportation Charge, the variable operation, maintenance, power, and replacement component shall be computed on the basis of the same estimated project water deliveries as was assumed in computing pursuant to Article 26(c).

Appears in 1 contract

Samples: water.ca.gov

Adjustment. Transportation Charge - Capital Cost Component Adjustments for prior underpayments or overpayments of the capital cost component of the Transportation Charge to the Agency, together with accrued interest charges or credits thereon computed at the then current project interest rate on the amount of the underpayment or overpayment and compounded annually for the number of years from the year the underpayment or overpayment occurred to and including the year following the redetermination, shall be paid in the year following the redetermination: Provided, That the Agency may elect to exercise the option whereby when the redetermined Transportation Charge for the following year, with adjustments, including adjustments of the operation, maintenance, power, and replacement components provided for in subdivision (c) of this article, is more or less than the last estimate of the Charge provided pursuant to Article 27 for the corresponding year, without adjustments, an amount equal to the total of such difference shall be deducted from or added to the adjusted capital cost component for that year and paid or credited in accordance with the following schedule: Percent that Transportation Charge differs from last estimate (+ or -) Period, in years, for amortizing the difference in indicated charge for 10% or less no amortization more than 10%, but not more than 20% 2 more than 20%, but not more than 30% 3 more than 30%, but not more than 40% 4 more than 40%. 5 43 Amended: Amendment 11, (a)-(d) Such payments or credits shall be in equal semi-annual semiannual amounts of principal and interest on or before the 1st day of January and the 1st day of July, with interest computed at the project interest rate and compounded annually, during varying amortization periods as set forth in the preceding schedule: Provided, That for the purpose of determining the above differences in the Transportation Charge, the variable operation, maintenance, power, and replacement component shall be computed on the basis of the same estimated project water deliveries as was assumed in computing pursuant to Article 26(c).

Appears in 1 contract

Samples: water.ca.gov

Adjustment. Transportation Charge - Capital Cost Component Adjustments for prior underpayments or overpayments of the capital cost component of the Transportation Charge to the Agency, together with accrued interest charges or credits thereon computed at the then current project interest rate on the amount of the underpayment or overpayment and compounded annually for the number of years from the year the underpayment 46 Amended: Amendment Xx. 00 or overpayment occurred to and including the year following the redetermination, shall be paid in the year following the redetermination: Provided, That the Agency may elect to exercise the option whereby when the redetermined Transportation Charge for the following year, with adjustments, including adjustments of the operation, maintenance, power, and replacement components provided for in subdivision (c) of this article, is more or less than the last estimate of the Charge provided pursuant to Article 27 for the corresponding year, without adjustments, an amount equal to the total of such difference shall be deducted from or added to the adjusted capital cost component for that year and paid or credited in accordance with the following schedule: Percent that Transportation Charge differs from last estimate (+ or -) Period, in years, for amortizing the difference in indicated charge for 10% or less no amortization more than 10%, but not more than 20% 2 more than 20%, but not more than 30% 3 more than 30%, but not more than 40% 4 more than 40%. 5 Such payments or credits shall be in equal semi-annual amounts of principal and interest on or before the 1st day of January and the 1st day of July, with interest computed at the project interest rate and compounded annually, during varying amortization periods as set forth in the preceding schedule: Provided, That for the purpose of determining the above differences in the Transportation Charge, the variable operation, maintenance, power, and replacement component shall be computed on the basis of the same estimated project water deliveries as was assumed in computing pursuant to Article 26(c).

Appears in 1 contract

Samples: water.ca.gov

Adjustment. Transportation Charge - Capital Cost Component Adjustments for prior underpayments or overpayments of the capital cost component of the Transportation Charge to the AgencyDistrict, together with accrued interest charges or credits thereon computed at the then current project interest rate on the amount of the underpayment or overpayment and compounded annually for the number of years from the year the underpayment or overpayment occurred to and including the year following the redetermination, shall be paid in the year following the redetermination: Provided, That the Agency District may elect to exercise the option whereby when the redetermined Transportation Charge for the following year, with 55 Amended: Amendment 14 adjustments, including adjustments of the operation, maintenance, power, and replacement components provided for in subdivision (c) of this article, is more or less than the last estimate of the Charge provided pursuant to Article 27 for the corresponding year, without adjustments, an amount equal to the total of such difference shall be deducted from or added to the adjusted capital cost component for that year and paid or credited in accordance with the following schedule: Percent that Transportation Charge differs from last estimate (+ or -) Period, in years, for amortizing the difference in indicated charge for 10% or less no amortization more than 10%, but not more than 20% 2 more than 20%, but not more than 30% 3 more than 30%, but not more than 40% 4 more than 40%. 5 Such payments or credits shall be in equal semi-annual amounts of principal and interest on or before the 1st day of January and the 1st day of July, with interest computed at the project interest rate and compounded annually, during varying amortization periods as set forth in the preceding schedule: Provided, That for the purpose of determining the above differences in the Transportation Charge, the variable operation, maintenance, power, and replacement component shall be computed on the basis of the same estimated project water deliveries as was assumed in computing pursuant to Article 26(c).

Appears in 1 contract

Samples: water.ca.gov

Adjustment. Transportation Charge - Capital Cost Component Component‌ Adjustments for prior underpayments or overpayments of the capital cost component of the Transportation Charge to the Agency, together with accrued interest charges or credits thereon computed at the then current project interest rate on the amount of the underpayment or overpayment and compounded annually for the number of years from the year the underpayment or overpayment occurred to and including the year following the redetermination, shall be paid in the year following the redetermination: Provided, That the Agency may elect to exercise the option whereby when the redetermined Transportation Charge for the following year, with adjustments, including adjustments of the operation, maintenance, power, and replacement components provided for in subdivision (c) of this article, is more or less than the last estimate of the Charge provided pursuant to Article 27 for the corresponding year, without adjustments, an amount equal to the total of such difference shall be deducted from or added to the adjusted capital cost component for that year and paid or credited in accordance with the following schedule: Percent that Transportation Charge differs from last estimate (+ or -) Period, in years, for amortizing the difference in indicated charge for 10% or less no amortization more than 10%, but not more than 20% 2 more than 20%, but not more than 30% 3 more than 30%, but not more than 40% 4 more than 40%. 5 Such payments or credits shall be in equal semi-annual amounts of principal and interest on or before the 1st day of January and the 1st day of July, with interest computed at the project interest rate and compounded annually, during varying amortization periods as set forth in the 44 Amended: Amendment 9, Articles (a)-(d) preceding schedule: Provided, That for the purpose of determining the above differences in the Transportation Charge, the variable operation, maintenance, power, and replacement component shall be computed on the basis of the same estimated project water deliveries as was assumed in computing pursuant to Article 26(c).

Appears in 1 contract

Samples: Contract

Adjustment. Transportation Charge - Capital Cost Component Component‌ Adjustments for prior underpayments or overpayments of the capital cost component of the Transportation Charge to the AgencyDistrict, together with accrued interest charges or credits thereon computed at the then current project interest rate on the amount of the underpayment or 53 Amendment 10; (a)-(d) overpayment and compounded annually for the number of years from the year the underpayment or overpayment occurred to and including the year following the redetermination, shall be paid in the year following the redetermination: Provided, That the Agency District may elect to exercise the option whereby when the redetermined Transportation Charge for the following year, with adjustments, including adjustments of the operation, maintenance, power, and replacement components provided for in subdivision (c) of this article, is more or less than the last estimate of the Charge provided pursuant to Article 27 for the corresponding year, without adjustments, an amount equal to the total of such difference shall be deducted from or added to the adjusted capital cost component for that year and paid or credited in accordance with the following schedule: Percent that Transportation Charge differs from last estimate (+ or -) Period, in years, for amortizing the difference in indicated charge for 10% or less no amortization more than 10%, but not more than 20% 2 more than 20%, but not more than 30% 3 more than 30%, but not more than 40% 4 more than 40%. 5 Such payments or credits shall be in equal semi-annual amounts of principal and interest on or before the 1st day of January and the 1st day of July, with interest computed at the project interest rate and compounded annually, during varying amortization periods as set forth in the preceding schedule: Provided, That for the purpose of determining the above differences in the Transportation Charge, the variable operation, maintenance, power, and replacement component shall be computed on the basis of the same estimated project water deliveries as was assumed in computing pursuant to Article 26(c).

Appears in 1 contract

Samples: water.ca.gov

Time is Money Join Law Insider Premium to draft better contracts faster.