Additional land for Capacity Augmentation Sample Clauses

Additional land for Capacity Augmentation. The additional real estate required for Capacity Augmentation shall be acquired by the Authority and granted to the Concessionaire no later than 3 (three) years prior to the Scheduled Capacity Augmentation Date and the provisions of this Article 10 shall apply, mutatis mutandis, to such real estate and to any other land over which Right of Way is procured and granted by the Authority to the Concessionaire at any time during the Concession Period.
AutoNDA by SimpleDocs

Related to Additional land for Capacity Augmentation

  • Cost Responsibility for Interconnection Facilities and Distribution Upgrades 4.1 Interconnection Facilities 4.2 Distribution Upgrades

  • Alignment with Modernization Foundational Programs and Foundational Capabilities The activities and services that the LPHA has agreed to deliver under this Program Element align with Foundational Programs and Foundational Capabilities and the public health accountability metrics (if applicable), as follows (see Oregon’s Public Health Modernization Manual, (xxxx://xxx.xxxxxx.xxx/oha/PH/ABOUT/TASKFORCE/Documents/public_health_modernization_man ual.pdf):

  • Local Circuit Switching Capability, including Tandem Switching Capability 4.2.1 Local circuit switching capability is defined as: (A) line-side facilities, which include, but are not limited to, the connection between a loop termination at a main distribution frame and a switch line card; (B) trunk-side facilities, which include, but are not limited to, the connection between trunk termination at a trunk-side cross-connect panel and a switch trunk card; (C) switching provided by remote switching modules; and (D) all features, functions, and capabilities of the switch, which include, but are not limited to: (1) the basic switching function of connecting lines to lines, line to trunks, trunks to lines, and trunks to trunks, as well as the same basic capabilities made available to BellSouth’s customers, such as a telephone number, white page listings, and dial tone; and (2) all other features that the switch is capable of providing, including but not limited to customer calling, customer local area signaling service features, and Centrex, as well as any technically feasible customized routing functions provided by the switch. Any features that are not currently available but are technically feasible through the switch can be requested through the BFR/NBR process.

  • Switching and Tagging Rules Each Party shall provide the other Parties a copy of its switching and tagging rules that are applicable to the other Parties’ activities. Such switching and tagging rules shall be developed on a non-discriminatory basis. The Parties shall comply with applicable switching and tagging rules, as amended from time to time, in obtaining clearances for work or for switching operations on equipment.

  • AIN Selective Carrier Routing for Operator Services, Directory Assistance and Repair Centers 4.3.1 BellSouth will provide AIN Selective Carrier Routing at the request of <<customer_name>>. AIN Selective Carrier Routing will provide <<customer_name>> with the capability of routing operator calls, 0+ and 0- and 0+ NPA (LNPA) 555-1212 directory assistance, 1+411 directory assistance and 611 repair center calls to pre-selected destinations.

  • Cutting, Patching, and Fitting The Contractor shall do all cutting, patching, and fitting of the Work that may be required to make its several parts come together properly and fit.

  • Right to Contracted Capacity & Energy 4.4.1 The SPD will declare the CUF of the project and will be allowed to revise the same once within first year after COD of the project. Thereafter, the CUF for the Project shall remain unchanged for the entire term of the PPA. The declared annual CUF shall in no case be less than 17%. It shall be the responsibility of the SPD, entirely at its cost and expense to install such number of Solar panels and associated infrastructure(like project equipment)as may be necessary to achieve the required CUF, and for this purpose SPD shall make its own study and investigation of the GHI and other factors prevalent in the area which have implication on the quantum of generation. Further, arrangement of extra land for such installation shall be intimated to MSPDCL in advance and MSPDCL shall have to reply for the same in 7 days in the best interest of the project generation. However,non- availability of land shall not absolve SPD from his obligations under the PPA. SPD shall maintain generation so as to achieve annual CUF within + 10% and -15% of the declared value till the end of 10 years from COD, subject to the annual CUF remaining minimum of 15%, and within +10% and -20% of the declared value of the annual CUF thereafter till the end of the PPA duration of 25 years. The lower limit will, however, be relaxable by MSPDCL to the extent of non-availability of grid for evacuation which is beyond the control of the SPD. The annual CUF will be calculated every Contract Year. The compensation due to shortfall in generation shall be applied to the amount of shortfall in generation during the Contract Year. The amount of compensation shall be equal to the compensation payable (including equivalent amount of Electricity purchased from the grid for meeting load demand due to short fall in solar power) by the buying Entity, which shall ensure that the buying Entity is offset for all potential costs associated with low generation and supply of power under the PPA, subject to a minimum of 50% (fifty per cent) of the cost of this shortfall in energy terms, calculated at PPA tariff. The amount, being equal to the compensation payable, by the buying Entity for not meeting load requirements is only a measure of damage. It shall not be construed that the compensation is payable by SPD only if the buying Entity are required to pay compensation for such not meeting of load requirements or that the buying Entity or the SPD shall be required to prove or establish such payment of compensation for not meeting the load. SPD shall agree that the methodology specified herein above for calculation of liquidated damages payable by the SPD for shortfall in generation is a genuine and accurate pre-estimation of the actual loss that will be suffered by buying Entity. SPD shall further acknowledge that a breach of any of the obligations contained herein result in injuries and that the amount of the liquidated damages or the method of calculating the liquidated damages specified in this document is a genuine and reasonable pre-estimate of the damages that may be suffered by buying Entity in each case specified under this Agreement. However, this compensation shall not be applicable in events of Force Majeure identified under the PPA with MSPDCL, affecting supply of power by the SPD to the Buying Entity.

  • Scope of Interconnection Service 1.3.1 The NYISO will provide Energy Resource Interconnection Service to Interconnection Customer at the Point of Interconnection.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • System Upgrade Facilities and System Deliverability Upgrades Connecting Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities and System Deliverability Upgrades shall be determined in accordance with the provisions of Attachment S to the NYISO OATT.

Time is Money Join Law Insider Premium to draft better contracts faster.