Acts of God. In any case where either party hereto is required to do any act, delays caused by or resulting from Acts of God, war, civil commotion, fire, flood or other casualty, labor difficulties, shortages of labor, materials or equipment, government regulations, unusually severe weather, or other causes beyond such party’s reasonable control shall not be counted in determining the time during which work shall be completed, whether such time be designated by a fixed date, a fixed time or a “reasonable time,” and such time shall be deemed to be extended by the period of such delay.
Appears in 12 contracts
Samples: Purchase and Sale Agreement, Purchase and Sale Agreement (Cynosure Inc), Termination Agreement (ConforMIS Inc)
Acts of God. In any case where either party hereto is required to do any act, delays caused by or resulting from Acts of God, war, civil commotion, fire, flood or other casualty, labor difficulties, shortages of labor, materials or equipment, government regulations, unusually severe weather, or other causes beyond such party’s 's reasonable control shall not be counted in determining the time during which work shall be completed, whether such time be designated by a fixed date, a fixed time or a “"reasonable time,” ", and such time shall be deemed to be extended by the period of such delay.
Appears in 12 contracts
Samples: Agreement (Entex Information Services Inc), Lease (Genzyme Corp), License Agreement (Media 100 Inc)
Acts of God. In any case where either party hereto is required to do any act, delays caused by or resulting from Acts of God, war, civil commotion, fire, flood or other casualty, labor difficulties, shortages of labor, materials or equipment, government regulations, unusually severe weather, or other causes beyond such party’s 's reasonable control shall not be counted in determining the time during which work shall be completed, whether such time be designated by a fixed date, a fixed time or a “"reasonable time,” " and such time shall be deemed to be extended by the period of such delay.
Appears in 11 contracts
Samples: Idenix Pharmaceuticals Inc, Acme Packet Inc, Ibasis Inc
Acts of God. In any case where either party hereto is required to do any act, delays caused by or resulting from Acts of God, war, civil commotion, fire, flood fire or other casualty, labor difficulties, shortages of labor, materials or equipment, government regulations, unusually severe weather, or other causes beyond such party’s 's reasonable control shall not be counted in determining the time during which work shall be completed, whether or such time be designated by a fixed date, a fixed time or "a “reasonable time,” and such time shall be deemed to be extended by the period of such delay".
Appears in 11 contracts
Samples: Lease (Commerce Bancorp Inc /Nj/), Lease (Commerce Bancorp Inc /Nj/), Lease (Commerce Bancorp Inc /Nj/)
Acts of God. In any case where either party hereto is required to do any act, delays caused by or resulting from Acts of God, war, civil commotion, fire, flood fire or other casualty, labor difficulties, shortages of labor, materials or equipment, government regulations, unusually severe weather, or other causes beyond such party’s 's reasonable control shall not be counted in determining the time during which work shall be completed, whether such time be designated by a fixed date, a fixed time or "a “reasonable time,” and such time shall be deemed to be extended by the period of such delay".
Appears in 5 contracts
Samples: First Lease (Commerce Bancorp Inc /Nj/), Lease (Commerce Bancorp Inc /Nj/), Lease (Commerce Bancorp Inc /Nj/)
Acts of God. In any case where either party hereto is required to do any act, delays caused by or resulting from Acts acts of God, war, civil commotion, fire, flood or other casualty, labor difficulties, shortages of labor, materials or equipment, government regulations, unusually severe weather, or other causes beyond such party’s 's reasonable control shall not be counted in determining the time during which work shall be completed, whether such time be designated by a fixed date, a fixed time or a “"reasonable time,” ", and such time shall be deemed to be extended by the period of such delay.
Appears in 5 contracts
Samples: Extension of Lease (Mercury Computer Systems Inc), Lease (Netezza Corp), Disturbance and Attornment Agreement (Genzyme Transgenics Corp)
Acts of God. In any case where either party hereto is required to do any act, delays caused by or resulting from Acts acts of God, war, civil commotion, fire, flood or other casualty, labor difficulties, shortages of labor, materials or equipment, government regulations, unusually severe weather, or other causes beyond such party’s 's reasonable control shall not be counted in determining the time during which work shall be completed, whether such time be designated by a fixed date, a fixed time or a “"reasonable time,” " and such time shall be deemed to be extended by the period of such delay.
Appears in 3 contracts
Samples: Lease (Impac Group Inc /De/), Lease Section (Foilmark Inc), Lease (Impac Group Inc /De/)
Acts of God. In any case where either party hereto is required to do any act, then, except where specifically provided in this Lease to the contrary, delays caused by or resulting from Acts acts of God, war, civil commotion, fire, flood or other casualty, labor difficulties, shortages of labor, materials or equipment, government regulations, moratoria, unusually severe weather, or other causes beyond such party’s 's reasonable control which are unrelated to labor difficulties and shortages of labor, materials or equipment shall not be counted in determining the time during which work such act shall be completed, whether such time be designated by a fixed date, a fixed time or a “"reasonable time,” ", and such time shall be deemed to be extended by the period of such delay.
Appears in 3 contracts
Samples: Lease (Arqule Inc), Lease Agreement (Arqule Inc), Lease (Arqule Inc)
Acts of God. In any case where either party hereto is required to do any act, other than the payment of Annual Fixed Rent or additional rent, delays caused by or resulting from Acts acts of God, war, civil commotion, fire, flood or other casualty, labor difficulties, shortages of labor, materials or equipment, unusual government regulations, moratorium or similar acts of government, unusually severe weather, or other causes beyond such party’s 's reasonable control shall not be counted in determining the time during which work such act shall be completed, whether such time be designated by a fixed date, a fixed time or "a “reasonable time,” " and such time shall be deemed to be extended by the period of such delay.
Appears in 2 contracts
Samples: Epix Medical Inc, Epix Medical Inc
Acts of God. In any case where either party hereto is required to do any actact other than the payment of rent, delays caused by or resulting from Acts acts of God, war, civil commotion, fire, flood or other casualty, labor difficulties, shortages of labor, materials or equipment, unusual government regulations, unusually severe weather, weather or other causes beyond such party’s 's reasonable control shall not be counted in determining the time during which work such act shall be completed, whether such time be designated by as a fixed date, a fixed time or "a “reasonable time,” ", and such time shall be deemed to be extended by the period of such delay.
Appears in 2 contracts
Samples: Lease Agreement (Harvard Bioscience Inc), Lease Agreement (Cedar Shopping Centers Inc)
Acts of God. In any case where either party hereto is required to do any act, delays caused by or resulting from Acts of God, war, civil commotion, fire, flood or other casualty, labor difficulties, shortages of labor, materials or equipment, government regulations, unusually severe weather, or other causes beyond such party’s reasonable control (other than financial) shall not be counted in determining the time during which work shall be completed, whether such time be designated by a fixed date, a fixed time or “a “reasonable time,” ”, and such time shall be deemed to be extended by the period of such delay. In no event shall any Act of God delay Tenant’s performance of monetary obligations required of Tenant, unless such delay is specifically permitted in this Lease in connection with such performance.
Appears in 2 contracts
Samples: Lease Agreement (SciVac Therapeutics Inc.), Lease Agreement (Targanta Therapeutics Corp.)
Acts of God. In any case where either party hereto is required to do any actact (other than the payment of Annual Rent and Additional Rent), delays caused by or resulting from Acts of God, war, civil commotion, fire, flood or other casualty, labor difficulties, shortages of labor, materials or equipment, government regulations, unusually severe weather, weather or other causes beyond such party’s 's reasonable control shall not be counted in determining the time during which work shall be completed, whether such time be designated by a fixed date, a fixed time or a “"reasonable time,” " and such time shall be deemed to be extended by the period of such delay.
Appears in 2 contracts
Samples: Office Lease Agreement (Call Points Inc), Hartsfield Centre (Vialog Corp)
Acts of God. In any case where either party hereto is required to do any act, delays caused by or resulting from Acts of God, war, civil commotion, fire, flood fire or other casualty, labor difficulties, shortages of labor, materials or equipment, government regulations, unusually severe weather, regulations or other causes beyond such party’s 's reasonable control shall not be counted in determining the time during which work shall be completed, whether such time time, be designated by a fixed date, a fixed time or "a “reasonable time,” and such time shall be deemed to be extended by the period of such delay".
Appears in 2 contracts
Samples: Geerlings & Wade Inc, Geerlings & Wade Inc
Acts of God. In any case where either party hereto is required to do any act, delays caused by or resulting from Acts acts of God, war, civil commotion, fire, flood or other casualty, labor difficulties, shortages of labor, materials or equipment, government regulations, unusually severe weather, or other causes beyond such party’s reasonable control shall not be counted in determining the time during which work shall be completed, whether such time be designated by a fixed date, a fixed time or a “reasonable time,” ”, and such time shall be deemed to be extended by the period of such delay.
Appears in 1 contract
Samples: Lease (GTC Biotherapeutics Inc)
Acts of God. In any case where either party hereto is required to do any actact (other than Tenant's obligation to pay rent), delays caused by or resulting from Acts of God, war, civil commotion, fireacts of terrorism, flood fire or other casualty, labor difficulties, shortages of labor, materials or equipment, government regulations, unusually severe weatherpermitting difficulties, failure to obtain building permit or other causes beyond such party’s 's reasonable control shall not be counted in determining the time during which work such act shall be completed, whether such time be designated by a fixed date, a fixed time or "a “reasonable time,” and such time shall be deemed to be extended by the period of such delay".
Appears in 1 contract
Samples: Lease Agreement (Asure Software Inc)
Acts of God. In any case where either party hereto is required to do any act, delays caused by or resulting from Acts of God, war, civil commotion, fire, flood or other casualty, labor difficulties, shortages of labor, materials or equipment, government regulations, unusually severe weather, or other causes beyond such party’s 's reasonable control shall not be counted in determining the time during which work shall be completed, whether such time be designated by a fixed date, a fixed time or a “"reasonable time,” " and such time shall be deemed to be extended by the period of such delay, however, in no case will such delay exceed a period of one (1) year.
Appears in 1 contract
Samples: Nashua Corp
Acts of God. In any case where either party hereto is required to do any actact (other than the payment of money), delays caused by or resulting from Acts acts of God, war, civil commotion, fire, flood or other casualty, labor difficulties, shortages of labor, materials or equipment, government regulations, unusually severe weather, or other causes beyond such party’s 's reasonable control shall not be counted in determining the time during which work shall be completed, whether such time be designated by a fixed date, a fixed time or a “"reasonable time,” ", and such time shall be deemed to be extended by the period of such delay.
Appears in 1 contract
Samples: Broadvision Inc
Acts of God. In any case where either party hereto is required to do any act, delays caused by or resulting from Acts of God, war, civil commotion, fire, flood floor or other casualty, labor difficulties, shortages of labor, materials or equipment, government regulations, unusually severe weather, or other causes beyond such party’s 's reasonable control control, shall not be counted in determining the time during which work shall be completed, whether such time be designated by a fixed date, a fixed time or a “"reasonable time,” ", and such time shall be deemed to be extended by the period of such delay.
Appears in 1 contract
Samples: By And (APA Enterprises, Inc.)
Acts of God. In any case where either party hereto is required to do any act, delays caused by or resulting from Acts of God, war, civil commotion, fire, flood fire or other casualty, labor difficulties, shortages of labor, materials or equipment, government regulations, unusually severe weather, or other causes beyond such party’s 's reasonable control shall not be counted in determining the time during which work shall be completed, whether or such time be designated by a fixed date, a fixed time or "a “reasonable time,” and such time shall be deemed to be extended by the period of such delay*.
Appears in 1 contract
Samples: Commerce Bancorp Inc /Nj/
Acts of God. In any case where either party hereto is required to do any act, delays caused by or resulting from Acts of God, war, civil commotion, fire, flood fire or other casualty, labor difficulties, shortages of labor, materials or equipment, government regulations, unusually severe weather, regulations or other causes causes, to the extent that any of which are beyond such party’s 's reasonable control control, shall not be counted in determining the time during which work shall be completed, whether such time be designated by a fixed date, a fixed time or 'a “reasonable time,” and ." "Financial inability" is expressly excluded as a cause for such time shall be deemed to be extended by the period of such delaydelay in performance.
Appears in 1 contract
Samples: Enterprise Bancorp Inc /Ma/
Acts of God. In any case where either party hereto is required to do any act, delays caused by or resulting from Acts of God, war, civil commotion, fire, flood or other casualty, labor difficulties, shortages of labor, materials or equipment, government regulations, unusually severe weather, or other causes beyond such party’s 's reasonable control shall not be counted in determining deteimining the time during which work shall be completed, whether such time be designated by a fixed date, a fixed time or a “"reasonable time,” " and such time shall be deemed to be extended by the period of such delay.
Appears in 1 contract
Samples: Javelin Pharmaceuticals, Inc
Acts of God. In any case where either party hereto is required to do any act, delays caused by or resulting from Acts of God, war, civil commotion, fire, flood or other casualty, labor difficulties, shortages of labor, materials or equipment, government regulations, unusually usually severe weather, or other causes beyond such party’s 's reasonable control shall not be counted in determining the time during which work shall be completed, whether such time be designated by a fixed date, a fixed time or a “"reasonable time,” ", and such time shall be deemed to be extended by the period of such delay.
Appears in 1 contract
Samples: Sublease Agreement (Sonoma Systems)
Acts of God. In any case where either party hereto is required to do any act, excluding the payment of rent or other sum required to be paid by TENANT to LANDLORD hereunder, delays caused by or resulting from Acts of God, war, civil commotion, fire, flood fire or other casualty, labor difficulties, shortages of labor, materials or equipment, government regulations, unusually severe weather, or other causes beyond such party’s 's reasonable control shall not be counted in determining the time during which work shall be completed, whether such time be designated by a fixed date, a fixed time or "a “reasonable time,” and such time shall be deemed to be extended by the period of such delay".
Appears in 1 contract
Acts of God. In Excepting only the obligation of Tenant to pay any monetary amount due hereunder, in any case where either party hereto is required to do any act, delays caused by or resulting from Acts acts of God, war, civil commotion, fire, flood or other casualty, labor difficulties, shortages of labor, materials or equipment, government regulations, unusually severe weather, or other causes beyond such party’s 's reasonable control (other than financial inability) shall not be counted in determining the time during which work shall be completed, whether such time be designated by a fixed date, a fixed time or a “"reasonable time,” ", and such time shall be deemed to be extended by the period of such delay.
Appears in 1 contract
Samples: Ilc Technology Inc
Acts of God. In any case where either party hereto is required to do ----------- any act, delays caused by or resulting from Acts of God, war, civil commotion, fire, flood or other casualty, labor difficulties, shortages of labor, materials or equipment, government regulations, unusually severe weather, or other causes beyond such party’s 's reasonable control shall not be counted in determining the time during which work shall be completed, whether such time be designated by a fixed date, a fixed time or a “"reasonable time,” " and such time shall be deemed to be extended by the period of such delay.
Appears in 1 contract
Acts of God. In any case where either party hereto is required to do any act, delays caused by or resulting from Acts acts of God, war, civil commotion, fire, flood or other casualty, labor difficulties, shortages of labor, materials or equipment, government regulations, unusually severe weather, or other causes beyond such party’s reasonable control (“Force Majeure”) shall not be counted in determining the time during which work shall be completed, whether such time be designated by a fixed date, a fixed time or a “reasonable time,” ”, and such time shall be deemed to be extended by the period of such delay.
Appears in 1 contract
Samples: Haemonetics Corp
Acts of God. In any case case, where either party hereto is required to do any act, delays caused by or resulting from Acts acts of God, war, civil commotion, fire, flood or other casualty, labor difficulties, shortages of labor, materials or equipment, government regulations, unusually severe weather, or other causes beyond such party’s 's reasonable control shall not be counted in determining the time during which work such act shall be completed, whether such time be designated by a fixed date, a fixed time or a “"reasonable time,” ", and such time shall be deemed to be extended by the period of such delay.
Appears in 1 contract
Acts of God. In any case where either party hereto is required to do any act, delays caused by or resulting from Acts of God, war, civil commotion, fire, flood floor or other casualty, labor difficulties, shortages of labor, materials or equipment, government regulations, unusually severe weather, or other causes beyond such party’s reasonable control control, shall not be counted in determining the time during which work shall be completed, whether such time be designated by a fixed date, a fixed time or a “reasonable time,” ”, and such time shall be deemed to be extended by the period of such delay.
Appears in 1 contract
Samples: Lease (Information Architects Corp)
Acts of God. In any case where either party hereto is required to do any act, delays caused by or resulting from Acts the occurrence of acts of God, war, civil commotionlabor disputes, fire, flood or other casualtyunusual delays in deliveries, labor difficulties, shortages of labor, materials or equipment, government regulations, unusually severe weather, unavoidable casualties or other causes beyond such party’s the reasonable control of the party claiming such delay shall not be counted in determining the time during which work shall be completed, whether such time be designated by a fixed date, a fixed time or a “reasonable time,” ”, and such time shall be deemed to be extended by the period of such delay.
Appears in 1 contract
Samples: BioMed Realty Trust Inc
Acts of God. 19 20 In any case where either party hereto is required to do any actact or work, delays caused by 21 or resulting from Acts of God, war, civil commotion, fire, flood or other casualty, labor difficulties, shortages of 22 labor, materials or equipment, government regulations, unusually severe weather, pandemic, or other causes caused beyond such 23 party’s reasonable control shall not be counted in determining the time during which such act or 24 work shall be completed, whether such time be designated by a fixed date, a as fixed time or a 25 “reasonable time,” and such time shall be deemed to be extended by the period of such delay.. 26
Appears in 1 contract
Samples: Lease Agreement
Acts of God. In any case where either party hereto is required to do do, any act, delays caused by or resulting from Acts acts of God, war, civil commotion, fire, flood or other casualty, unusual labor difficulties, unusual shortages of labor, materials or equipment, government regulations, unusually severe weather, or other causes beyond such party’s 's reasonable control shall not be counted in determining the time during which work shall be completed, whether such time be designated by a fixed date, a fixed time or a “"reasonable time,” ", and such time shall be deemed to be extended by the period of such delay.
Appears in 1 contract
Samples: Thermo Vision Corp
Acts of God. In any case where either party hereto is required to do any act, delays caused by or resulting from Acts of God, war, civil commotion, fire, flood or other casualty, labor difficultiesdifficulties not limited to the Premises or Tenant's or Landlord's business operations, shortages of labor, materials or equipment, government regulations, unusually severe weather, or other causes beyond such party’s 's reasonable control shall not be counted in determining the time during which work shall be completed, whether such time be designated by a fixed date, a fixed time or a “"reasonable time,” ", and such time shall be deemed to be extended by the period of such delay.
Appears in 1 contract
Acts of God. In any case where either party hereto is required to do any act, delays caused by or resulting from Acts acts of God, war, civil commotion, fire, flood or other casualty, labor difficulties, shortages of labor, materials or equipment, unusual government regulations, unusually severe weather, or other causes beyond such party’s reasonable control shall not be counted in determining the time during which work such act shall be completed, whether such time be designated by a fixed date, a fixed time or “a “reasonable time,” and such time shall be deemed to be extended by the period of such delay.
Appears in 1 contract
Acts of God. In any case where either party hereto is required to do any act, delays caused by or resulting from Acts of God, war, civil commotion, fire, flood fire or other casualty, labor difficulties, shortages of labor, materials or equipment, government regulations, unusually severe weather, regulations or other causes causes, to the extent that any of which are beyond such party’s 's reasonable control control, shall not be counted in determining the time during which work shall be completed, whether such time be designated by a fixed date, a fixed time or "a “reasonable time,” and ." "Financial inability" is expressly excluded as a cause for such time shall be deemed to be extended by the period of such delaydelay in performance.
Appears in 1 contract
Samples: Enterprise Bancorp Inc /Ma/
Acts of God. In any case where either party hereto is required to do any act, delays other than the payment of Annual Fixed Rent or additional rent, delays, caused by or resulting from Acts acts of God, war, civil commotion, fire, flood or other casualty, labor difficulties, shortages of labor, materials materials, or equipment, unusual government regulations, unusually severe weather, or other causes beyond such party’s 's reasonable control shall not be counted in determining the time during which work such act shall be completed, whether such time be designated by a fixed date, a fixed time or "a “reasonable time,” ", and such time shall be deemed to be extended by the period of such delay.
Appears in 1 contract
Samples: Benchmark Electronics Inc
Acts of God. In any case where either party hereto is required to do any ----------- act, delays caused by or resulting from Acts of God, war, civil commotion, fire, flood or other casualty, labor difficulties, shortages of labor, materials or equipment, government regulations, unusually severe weather, or other causes beyond such party’s 's reasonable control shall not be counted in determining the time during which work shall be completed, whether such time be designated by a fixed date, a fixed time or "a “reasonable time,” ", and such time shall be deemed to be extended by the period of such delay.
Appears in 1 contract
Samples: Lease Agreement (Organogenesis Inc)
Acts of God. In any case where either party hereto is required to do any actact (except for the payment of money), delays caused by or resulting from Acts acts of God, war, civil commotion, fire, flood or other casualty, labor difficulties, shortages of labor, materials or equipment, government regulations, unusually severe weather, or other causes beyond such party’s reasonable control shall not be counted in determining the time during which work shall be completed, whether such time be designated by a fixed date, a fixed time or a “reasonable time,” ”, and such time shall be deemed to be extended by the period of such delay.
Appears in 1 contract
Samples: Avant Immunotherapeutics Inc
Acts of God. In any case where either party hereto is required to do any act, delays caused by or resulting from Acts of God, war, civil commotion, fire, flood or other casualty, labor difficulties, shortages of labor, materials or equipmentequipments, government governmental regulations, unusually severe weather, or other causes beyond such party’s 's reasonable control shall not be counted in determining the time during which work shall be completed, whether such time be designated by a fixed date, a fixed time or "a “reasonable time,” ", and such time shall be deemed to be extended by the period of such delay.
Appears in 1 contract
Samples: High Voltage Engineering Corp
Acts of God. In any case where either party hereto is required to do any ----------- act, delays caused by or resulting from Acts of God, war, civil commotion, fire, flood or other casualty, labor difficulties, shortages of labor, materials or equipment, government regulations, unusually severe weather, or other causes beyond such party’s 's reasonable control (but financial inability shall never constitute a cause beyond either party's control) shall not be counted in determining the time during which work shall be completed, whether such time be designated by a fixed date, a fixed time or a “"reasonable time,” " and such time shall be deemed to be extended by the period of such delay.
Appears in 1 contract
Samples: Software Com Inc
Acts of God. In any case where either party hereto is required to do any actact (other than the payment of money), delays caused by or resulting from Acts of God, war, civil commotion, fire, flood floor or other casualty, labor difficulties, shortages of labor, materials or equipment, government regulations, unusually severe weather, or other causes beyond such party’s 's reasonable control control, shall not be counted in determining the time during which work such act shall be completed, whether such time be designated by a fixed date, a fixed time or a “"reasonable time,” ", and such time shall be deemed to be extended by the period of such delay.
Appears in 1 contract
Acts of God. In any case where either party hereto is required to do any act, delays caused by or resulting from Acts of God, war, civil commotion, fire, flood or other casualty, labor difficulties, shortages of labor, materials or equipment, government regulations, unusually severe weather, weather or other causes beyond such party’s 's reasonable control shall not be counted in determining the time during which work shall be completed, whether such time be designated by a fixed date, a fixed time or a “"reasonable time,” " and such time shall be deemed deed to be extended by the period of such delay.
Appears in 1 contract