ACTION SUBMITTALS Clause Examples

POPULAR SAMPLE Copied 1 times
ACTION SUBMITTALS. A. Product Data: For each type of product.
ACTION SUBMITTALS. A. Product Data: For each type of product. 1. Include construction details, material descriptions, dimensions of individual components and profiles, and finishes for electrical identification products.
ACTION SUBMITTALS. 1. Product Data: For each type of product. a. Include construction details, material descriptions, dimensions of individual components and profiles, weights and finishes. b. Manufacturers' specifications and other data required to demonstrate compliance with the specified requirements. Include rated capacities, operating characteristics, electrical characteristics, and furnished specialties and accessories. c. Complete material list of all items proposed to be furnished and installed under this Section, including but not limited to the following items: Foundations, structural steel, purlins, PV module attachment hardware, grounding devices, WEEBS, lighting systems, and all other products required to properly install the canopies. d. Manufacturers' recommended installation procedures which, when approved by the Owner, shall become the basis for inspecting and accepting or rejecting actual installation procedures used on the work. e. Samples of module attachment hardware. f. Sample lighting fixture 2. Shop Drawings: For structures and attachments
ACTION SUBMITTALS. Engineer will review each submittal, make marks to indicate corrections or modifications required, and return it. Engineer will stamp each submittal with an action stamp and will ▇▇▇▇ ▇▇▇▇▇ appropriately to indicate action taken.
ACTION SUBMITTALS. A. Product Data: For each type of product. 1. Include construction details, material descriptions, dimensions of individual components and profiles, and finishes for EV charging equipment. 2. Include rated capacities, operating characteristics, electrical characteristics, and furnished specialties and accessories.
ACTION SUBMITTALS. A. Comparable Product Requests: Submit request for consideration of each comparable product. Identify product or fabrication or installation method to be replaced. Include Specification Section number and title and Drawing numbers and titles. 1. Include data to indicate compliance with the requirements specified in "Comparable Products" Article.
ACTION SUBMITTALS. A. Product Data: For the following: 1. Each type of steel reinforcement. 2. Bar supports. B. Shop Drawings: Comply with ACI SP-066: 1. Include placing drawings that detail fabrication, bending, and placement. 2. Include bar sizes, lengths, materials, grades, bar schedules, stirrup spacing, bent bar diagrams, bar arrangement, location of splices, lengths of lap splices, details of mechanical splice couplers, details of welding splices, tie spacing, hoop spacing, and supports for concrete reinforcement. C. Construction Joint Layout: Indicate proposed construction joints required to build the structure. 1. Location of construction joints is subject to approval of Architect.
ACTION SUBMITTALS. A. Product Data: For each type of canopy component. 1. Include construction details, material descriptions, dimensions of individual components and profiles, and finishes. B. Shop Drawings: Include the following: 1. Complete erection drawings showing attachment system, column and gutter beam framing, transverse cross sections, covering and trim details, and any optional installation details to clearly indicate proper assembly of components. Drawings shall be sealed by a State Registered Structural Engineer in the state of Delaware.
ACTION SUBMITTALS. A. Product Data: For each of the following: 1. Forms for cylindrical columns. 2. Form ties. 3. Waterstops. 4. Form-release agent. B. Shop Drawings: Prepared by a qualified professional engineer responsible for their preparation, detailing fabrication, assembly, and support of forms. 1. For exposed vertical concrete walls, indicate dimensions and form tie locations. 2. Indicate dimension and locations of construction and movement joints required to construct the structure in accordance with ACI 301 (ACI 301M). a. Location of construction joints is subject to approval of the Architect. 3. Indicate location of waterstops. 4. Indicate proposed schedule and sequence of stripping of forms, shoring removal, and reshoring installation and removal.
ACTION SUBMITTALS. A. Product Data: For each of the following. 1. Portland cement. 2. Fly ash. 3. Slag cement. 4. Blended hydraulic cement.