Acceptance and Operation Sample Clauses

Acceptance and Operation. Spirit shall take or, as applicable, have taken delivery of all of the Aircraft and Spare Engines in accordance with the schedule set forth in Exhibit A to this Agreement, as amended, supplemented or otherwise modified from time to time, and shall operate the Aircraft and Spare Engines in regular commercial service as contemplated by Section 10.4 below for the duration of the Period of Cover, subject to Section 11 hereto.
AutoNDA by SimpleDocs
Acceptance and Operation. 7.1 The Seller will be responsible for supervision of the installation of the Attractions at the Site. Seller shall, with the operational assistance of the Buyer, prepare and test the installed Attractions for operation and formal acceptance by Buyer (“Commissioning”). Seller shall, with the operational assistance of the Buyer, train Buyer personnel in the operation of the Attractions and equipment safety. Seller’s installation supervision shall continue until completion and final acceptance in writing of the Attractions by Xxxxx for operations.

Related to Acceptance and Operation

  • Maintenance and Operation Member-Generator agrees to maintain their system and facilities in accordance with applicable manufacturer's recommended maintenance schedule and standard prudent engineering practices. Member-Generator covenants and agrees to operate their system, facilities and equipment so as to minimize the likelihood for a malfunction or other disturbance, damaging or otherwise affecting or impairing Cooperative’s electrical system. Member-Generator shall comply with all applicable laws, regulations, zoning, building codes, safety rules and other environmental regulations or restrictions applicable to the design, installation, operation and maintenance of the Member-Generator's System. Member-Generator must, at least once every year, conduct a test to confirm that Member-Generator’s System automatically ceases to energize the output (interconnection equipment output voltage goes to zero) within two (2) seconds of being disconnected from Cooperative’s electrical system. Disconnecting the Member-Generator’s System from Cooperative’s electrical system at the visible disconnect switch and measuring the time required for the unit to cease to energize the output shall satisfy this test. Member-Generator shall maintain a record of the results of these tests and, upon request by Cooperative, shall provide a copy of the test results to Cooperative. If Member-Generator is unable to provide a copy of the test results upon request, Cooperative shall notify Member- Generator by mail that Member-Generator has thirty (30) days from the date Member-Generator receives the request to provide Cooperative with the results of a test. If Member-Generator does not provide Cooperative with the test results within the thirty (30) day time period or if the test results provided to Cooperative show that Member-Generator’s net metering unit is not functioning correctly, Cooperative may immediately disconnect Member-Generator’s System from Cooperative’s electrical system. If Member-Generator’s equipment ever fails this test, Member-Generator shall immediately disconnect Member-Generator’s System from Cooperative's electrical system. Member-Generator’s System shall not be reconnected to Cooperative's electrical system by the Member-Generator until Member-Generator’s System is repaired and operating in a normal and safe manner. Cooperative shall have the right to have a representative present and informed when any such tests are conducted. Cooperative does not warrant the testing procedures or results by the presence of its representative. Member-Generator is responsible for protecting their equipment from transient high voltage spikes caused by lightning and/or transient low voltage conditions caused by faults or short circuits, and from any other causes or events. Therefore, Cooperative shall not be responsible for damage to Member-Generator’s equipment allegedly caused by transient high voltage spikes caused by lightning and/or transient low voltage conditions caused by faults or short circuits or other causes or events. Member-Generator agrees to notify Cooperative no less than thirty (30) days prior to modification of the components or design of the Member-Generator’s System that in any way may degrade or significantly alter the System’s output characteristics. Member-Generator acknowledges that any such modifications will require submission of a new Application and Agreement to Cooperative.

  • Use and Operation 3.1 Permitted Use ......................................................................................................

  • Management and Operations 15.1 The Operator shall prepare an annual work programme and budget for each Calendar Year during the term of this Agreement. Each such work programme and budget shall set out in reasonable details, the work to be carried out, facilities to be purchased or created, training and employment programme, establishment, salaries and wages, social welfare schemes to be undertaken, and an estimate of the Expenditure to be incurred. The Operator shall present such work programme and budget to the Government and the Working Interest Owners before the start of each Calendar Year and thereafter provide a quarterly update on the implementation of such work programme and budget.

  • Communications and Operations Management a. Network Penetration Testing - Transfer Agent shall, on approximately an annual basis, contract with an independent third party to conduct a network penetration test on its network having access to or holding or containing Fund Data. Transfer Agent shall have a process to review and evaluate high risk findings resulting from this testing.

  • Management and Operation of Business 37 6.1 Management...................................................................................37 6.2 Certificate of Limited Partnership...........................................................38 6.3 Restrictions on General Partner's Authority..................................................38 6.4 Reimbursement of the General Partner.........................................................39 6.5

  • Quality Assurance The parties endorse the underlying principles of the Company’s Quality Management System, which seeks to ensure that its services are provided in a manner which best conforms to the requirements of the contract with its customer. This requires the Company to establish and maintain, implement, train and continuously improve its procedures and processes, and the employees to follow the procedures, document their compliance and participate in the improvement process. In particular, this will require employees to regularly and reliably fill out documentation and checklists to signify that work has been carried out in accordance with the customer’s specific requirements. Where necessary, training will be provided in these activities.

  • Financial Condition and Operations The Borrower will not permit any of the events set forth below to occur.

  • Program Management 1.1.01 Implement and operate an Immunization Program as a Responsible Entity

  • Business and Operations Borrower will continue to engage in the businesses presently conducted by it as and to the extent the same are necessary for the ownership, maintenance, management and operation of the Property. Borrower will qualify to do business and will remain in good standing under the laws of each jurisdiction as and to the extent the same are required for the ownership, maintenance, management and operation of the Property.

  • Management and Operations of Business 30 Section 7.1 Management .............................................................. 30 Section 7.2 Certificate of Limited Partnership ...................................... 34 Section 7.3 Restrictions on General Partner's Authority ............................. 34 (i) 3 Section 7.4 Reimbursement of the Crescent Group ..................................... 35 Section 7.5 Outside Activities of the Crescent Group ................................ 35 Section 7.6 Contracts with Affiliates ............................................... 36 Section 7.7 Indemnification ......................................................... 36 Section 7.8 Liability of the General Partner ........................................ 39 Section 7.9 Other Matters Concerning the General Partner ............................ 39 Section 7.10 Title to Partnership Assets ............................................ 40 Section 7.11 Reliance by Third Parties .............................................. 40 Section 7.12 Limited Partner Representatives ........................................ 41

Time is Money Join Law Insider Premium to draft better contracts faster.