RESPONSIBILITY FOR CONSTRUCTION COST Sample Clauses

RESPONSIBILITY FOR CONSTRUCTION COST. 5.2.1 Evaluations of the Owner's Project budget, preliminary estimates of Construction Cost and detailed estimates of Construction Cost prepared by the Design Professional represent the Design Professional's best judgment as a design professional familiar with the construction industry. It is recognized, however, that neither the Design Professional nor the Owner has control over the cost of labor, materials or equipment, over the Contractor's methods of determining bid prices, or over competitive bidding or market conditions. Accordingly, the Design Professional cannot and does not warrant or represent that bids or cost proposals will not vary from the Owner's Project budget or from any estimate of Construction Cost or evaluation prepared or agreed to by the Design Professional.
AutoNDA by SimpleDocs
RESPONSIBILITY FOR CONSTRUCTION COST. 5.2.1 Evaluations of the Owner’s Project budget, and Detailed Estimates of Construction Cost, prepared by the Engineer, represent the Engineer’s best judgment as a design professional familiar with the construction industry. It is recognized, however, that neither the Engineer nor the Owner has control over the cost of labor, materials or equipment, over the Contractor’s methods of determining bid prices, or over competitive bidding, market or negotiating conditions. Accordingly, the Engineer cannot and does not warrant or represent that bids or negotiated prices will not vary from the fixed limit of construction cost, or from any cost estimate or evaluation prepared by the Engineer.
RESPONSIBILITY FOR CONSTRUCTION COST. 6.2.1 Evaluations of the Owner's Project budget, preliminary estimates of Construction Cost and detailed estimates of Construction Cost, if any, prepared by the Architect/Engineer, represent the Architect/Engineer's best judgment as a design professional familiar with the construction industry. It is recognized, however, that neither the Architect/Engineer nor the Owner has control over the cost of labor, materials or equipment, over the Construction Manager's methods of determining bid prices, or over competitive bidding, market or negotiating conditions. Accordingly, the Architect/Engineer cannot and does not warrant or represent that bids or negotiated prices will not vary from the Owner's Project budget or from any estimate of Construction Cost or evaluation prepared or agreed to by the Architect/Engineer. The Architect/Engineer, however, shall conform to the provisions of this Section entitled “Responsibility for Construction Cost” in an attempt to keep the Project cost within the Construction Cost.
RESPONSIBILITY FOR CONSTRUCTION COST. Evaluations of Owner's Project budget, preliminary estimates of Construction Cost and detailed estimates of Construction Cost, if any, prepared by Professional, represent Professional's best judgment as a design professional familiar with the construction industry. It is also recognized, however, that neither Professional nor Owner has control over the cost of labor, materials or equipment, over Construction Manager's methods of determining bid prices, or over competitive bidding, market or negotiating conditions.
RESPONSIBILITY FOR CONSTRUCTION COST. 5.2.1 Evaluations of the Owner’s Project budget, preliminary estimates of Construction Cost and detailed estimates of Construction Cost prepared by the Construction Manager represent the Construction Manager’s best judgment as a person or entity familiar with the construction industry. It is recognized, however, that neither the Construction Manager nor the Owner has control over the cost of labor, materials or equipment, over Contractors’ methods of determining bid prices, or over competitive bidding, market or negotiating conditions. Accordingly, the Construction Manager cannot and does not warrant or represent that bids or negotiated prices will not vary from the Project budget proposed, established or approved by the Owner, or from any cost estimate or evaluation prepared by the Construction Manager.
RESPONSIBILITY FOR CONSTRUCTION COST. 3.2.1 Evaluations of the Owner's Project Budget, statements of probable Construction Cost and detailed estimates of Construction Cost, if any, prepared by the Consultant, represent the Consultant's professional judgment as a design professional familiar with the construction industry. It is recognized, however, that neither the Consultant nor the Owner has control over the cost of labor, materials or equipment, over the Contractor's methods of determining bid prices, or over competitive bidding, market or negotiating conditions. Accordingly, the Consultant cannot and does not warrant or represent that bids or negotiated prices will not vary from the Project Budget proposed, established or approved by the Owner, if any, or from any statement of probable construction cost or other cost estimate or evaluation prepared by the Consultant. At each stage of the Pre-Construction Phase, the Consultant may elect to produce his own estimate or may use the estimate prepared by the Contractor and review it to assure the Owner of the completeness and reasonable accuracy.
RESPONSIBILITY FOR CONSTRUCTION COST. 3.1.1 Evaluations of the District’s Project budget and Construction Cost Estimates prepared by Construction Manager represent Construction Manager’s best judgment as a person or entity familiar with the construction industry. It is recognized, however, that neither Construction Manager nor the District has control over the cost of labor, materials or equipment, over Contractors’ methods of determining bid prices, or over competitive bidding, market or negotiating conditions. Accordingly, Construction Manager cannot and does not warrant or represent that bids or negotiated prices will not vary from the Project budget proposed, established or approved by the District, or from any evaluation prepared by Construction Manager. The Construction Manager shall coordinate with the District to agree on what costs are included to define “Construction Cost” for the Project.
AutoNDA by SimpleDocs
RESPONSIBILITY FOR CONSTRUCTION COST. 4.2.1 Evaluations of the District's Project budget, Statements of Probable Construction Cost and Estimates of Construction Cost, as prepared by the Architect's construction estimator, represent the Architect's best judgment as a design professional familiar with the construction industry. It is recognized, however, that neither the Architect nor the District has control over the cost of labor, materials or equipment, over the Contractor's methods of determining bid prices, or over competitive bidding, market or negotiating conditions. Accordingly, the Architect cannot and does not warrant or represent that bids or negotiated prices will not vary from the Project budget proposed, established or approved by the District, if any, or from any Statement of Probable Construction Cost or other cost estimate or evaluation prepared by the Architect.
RESPONSIBILITY FOR CONSTRUCTION COST. The Architect/Engineer's review of the Project Budget and of preliminary estimates of Construction Cost or detailed estimates of Construction Cost prepared by the owner is solely for the Architect/Engineer's guidance in the Architect/Engineer's preparation of the Construction Documents. Accordingly, the Architect/Engineer cannot and does not warrant the accuracy of the estimates of the owner, or warrant or represent that bids of negotiated prices will not vary from the Project Budget or from any estimate of Construction Cost or evaluation reviewed by the Architect/Engineer.
RESPONSIBILITY FOR CONSTRUCTION COST. 5.2.1 Fixed Limit of Construction Cost shall be established in Exhibit B.