EAE Sample Clauses

EAE. EAE serves as a typical animal model to study potential therapeutics for the human disease multiple sclerosis (30). Ten-week old C57BL mice were injected subcutaneously (sc) with 200µg MOG (Myelin Oligodendrocyte Glycoprotein) peptide suspended in Complete Xxxxxx’x adjuvant, followed by a second injection one week later. One day after induction of the disease (namely, one day after the second injection) treatment with vehicle control (PBS), total mouse IgG, 25µg D8 and 100µg D8 (3X/week, ip injections) commenced. The severity and the progression of the disease was documented 3X/week according to the standard EAE scoring system (31). Treatment with 25µg, and more significantly with 100µg of D8, attenuated the progression of EAE signs during the whole course of the experiment. Moreover, D8 at the higher dose (100 µg) reduced the incidence of the disease from about 90% (in all other treatment groups) to only 55% (Figure 10), thus shedding light on the potential therapeutic advantage of D8 in the treatment of EAE.
AutoNDA by SimpleDocs

Related to EAE

  • Vlastnictví Zdravotnické zařízení si ponechá a bude uchovávat Zdravotní záznamy. Zdravotnické zařízení a Zkoušející převedou na Zadavatele veškerá svá práva, nároky a tituly, včetně práv duševního vlastnictví k Důvěrným informacím (ve smyslu níže uvedeném) a k jakýmkoli jiným Studijním datům a údajům.

  • Configuration Management The Contractor shall maintain a configuration management program, which shall provide for the administrative and functional systems necessary for configuration identification, control, status accounting and reporting, to ensure configuration identity with the UCEU and associated cables produced by the Contractor. The Contractor shall maintain a Contractor approved Configuration Management Plan that complies with ANSI/EIA-649 2011. Notwithstanding ANSI/EIA-649 2011, the Contractor’s configuration management program shall comply with the VLS Configuration Management Plans, TL130-AD-PLN-010-VLS, and shall comply with the following:

  • Start-Up and Synchronization Consistent with the mutually acceptable procedures of the Developer and Connecting Transmission Owner, the Developer is responsible for the proper synchronization of the Large Generating Facility to the New York State Transmission System in accordance with NYISO and Connecting Transmission Owner procedures and requirements.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Přetrvávající platnost Tento odstavec 1.3 “Zdravotní záznamy a Studijní data a údaje” zůstane závazný i v případě zániku platnosti či vypršení platnosti této Smlouvy.

  • Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least thirty (30) days written notice to the SLDC and GUVNL, of the date on which it intends to synchronize the Power Project to the Grid System.

  • Electrical appliance safety The Hirer shall ensure that any electrical appliances brought by them to the premises and used there shall be safe, in good working order, and used in a safe manner in accordance with the Electricity at Work Regulations 1989. Where a residual circuit breaker is provided the hirer must make use of it in the interests of public safety.

  • Přetrvající platnost This Section 3 “

  • Modern Slavery You hereby affirm your compliance with the Modern Slavery Xxx 0000 and associated guidance. You confirm (a) that you have read, are familiar with and shall not perform an act or omission which is in contravention with, the letter or spirit of the Act; and (b) you carry out regular, meaningful and comprehensive due diligence procedures and have internal policies in place to address any suspected human rights abuse in your business and Group where applicable.

  • Enterprise Information Management Standards Performing Agency shall conform to HHS standards for data management as described by the policies of the HHS Chief Data and Analytics Officer. These include, but are not limited to, standards for documentation and communication of data models, metadata, and other data definition methods that are required by HHS for ongoing data governance, strategic portfolio analysis, interoperability planning, and valuation of HHS System data assets.

Time is Money Join Law Insider Premium to draft better contracts faster.