Maintenance Repairs Utility Installations Trade Fixtures and Alterations (a) Subject to the provisions of Paragraphs 2.2 (Lessor’s warranty as to condition), 2.3 (Lessor’s warranty as to compliance with covenants, etc.), 7.2 (Lessor’s obligations to repair), 9 (damage and destruction), and 14 (condemnation), Lessee shall, at Lessee’s sole cost and expense and at all times, keep the Premises and every part thereof in good order, condition and repair, structural and non-structural (whether or not such portion of the Premises requiring repair, or the means of repairing the same, are reasonably or readily accessible to Lessee, and whether or not the need for such repairs occurs as a result of Lessee’s use, any prior use, the elements or the age of such portion of the Premises), including, without limiting the generality of the foregoing all equipment or facilities serving the Premises, such as plumbing, heating, air conditioning, ventilating, electrical, lighting facilities, boilers, fired or unfired pressure vessels, fire sprinkler and/or standpipe and hose or other automatic fire extinguishing system, including fire alarm and/or smoke detection systems and equipment, fire hydrants, fixtures, walls (interior and exterior), foundations, ceilings, roofs, floors, windows, doors, plate glass, skylights, landscaping, driveways, parking lots, fences, retaining walls, signs, sidewalks and parkways located in, on, about, or adjacent to the Premises. Lessee shall not cause or permit any Hazardous Substance to be spilled or released in, on, under or about the Premises (including through the plumbing or sanitary sewer system) and shall promptly, at Lessee’s expense, take all investigatory and/ore remedial action reasonably recommended, whether or not formally ordered or required, for the cleanup of any contamination of, and for the maintenance, security and/or monitoring of, the Premises, the elements surrounding same, or neighboring properties that was caused or materially contributed to by Lessee, or pertaining to or involving any Hazardous Substance and/or storage tank brought onto the premises by or for lessee or under its control. Lessee, in keeping the Premises in good order, condition and repair, shall exercise and perform good maintenance practices. Lessee’s obligations shall include restorations, replacements or renewals when necessary to keep the Promises and all improvements thereon or a part thereof in good order, condition and state of repair. If Lessee occupies the Premises for seven (7) years or more, lessor may require Lessee to repaint the exterior of the buildings on the Premises as reasonably required, but not more frequently than once every seven (7) years.
Fixtures and Alterations After taking occupancy of the Designated Space, AGENCY shall not, without the COUNTY’S prior written consent, attach any fixtures in or to the Designated Space or change, alter, or make additions to the Designated Space, nor attach or affix any article hereto, nor permit any annoying sound device, overload any floor, or deface the Designated Space. Such prior written consent shall not be unreasonably withheld. Where the COUNTY has approved AGENCY’S modifications to the Designated Space, the AGENCY shall only be required to remove its modifications and restore the Designated Space to its original condition upon the AGENCY’S vacating of the Designated Space should the COUNTY’S approval make such restoration a requirement of its approval. If, however, AGENCY elects to remove its modifications upon vacating the Designated Space, then AGENCY, at its expense, shall restore the Designated Space to its original condition, ordinary wear and tear excepted.
Utility Installations Trade Fixtures Alterations 8.3.1 The term “Utility Installations” refers to all floor and window coverings, air and/or vacuum lines, power panels, electrical distribution, security and fire protection systems, communication cabling, lighting fixtures, HVAC equipment, plumbing, and fencing in or on the Premises. The term “
Tenant’s Equipment Tenant shall provide notice to Landlord prior to moving any heavy machinery, heavy equipment, freight, bulky matter or fixtures (collectively, “Equipment”) into or out of the Building and shall pay to Landlord any costs actually incurred by Landlord in connection therewith. If such Equipment requires special handling, Tenant agrees (a) to employ only persons holding all necessary licenses to perform such work, (b) all work performed in connection therewith shall comply with all applicable Requirements and (c) such work shall be done only during hours designated by Landlord.
Furniture, Fixtures and Equipment Sublessee shall have the right to use during the Term the office furnishings and equipment within the Subleased Premises that are identified on Exhibit C attached hereto, as such exhibit may be adjusted by mutual agreement of the parties prior to the Third Floor Premises Delivery Date (the “Furniture”), provided Sublessee may only use the Furniture located in the Second Floor Premises after the Second Floor Commencement Date. The Furniture is provided in its “AS IS, WHERE IS” condition, without representation or warranty whatsoever. Sublessee shall insure the Furniture under the property insurance policy required under the Master Lease, as incorporated herein, and pay all taxes with respect to the Furniture. Sublessee shall maintain the Furniture in good condition and repair, reasonable wear and tear excepted, and shall be responsible for any loss or damage to the same occurring during the Term. Sublessee shall surrender the Furniture to Sublessor upon the termination of this Sublease in the same condition as exists as of the applicable Delivery Date, reasonable wear and tear excepted. Sublessee shall not remove any of the Furniture from the Subleased Premises. Notwithstanding anything to the contrary herein, Sublessee may provide Sublessor with written notice one (1) time not less than forty-five (45) days prior to the Third Floor Premises Delivery Date that lists any items of Furniture that Sublessee does not want to use and Sublessor shall, at no cost to Sublessee, remove such items from the Subleased Premises prior to the Third Floor Premises Delivery Date and such items shall no longer be considered Furniture hereunder. Notwithstanding the foregoing, provided Sublessee is not in default beyond the expiration of any applicable cure or grace period as of the date of the expiration or earlier termination of this Sublease, which condition may be waived by Sublessor in its sole discretion, then upon the expiration or earlier termination of this Sublease, the Furniture shall become the property of Sublessee, and Sublessee shall accept the same in its “AS IS, WHERE IS” condition, without representation or warranty whatsoever except as provided in the Bill of Sale referred to in the following sentence. In the event the Furniture is to become the property of Sublessee upon the expiration or earlier termination of this Sublease pursuant to the terms of the immediately preceding sentence, then Sublessor agrees to execute and deliver to Sublessee a Bill of Sale in the form of Exhibit D attached hereto conveying and transferring to Sublessee the Furniture.
Communications Equipment Members of the board of directors or any committee thereof may participate in and act at any meeting of such board or committee through the use of a conference telephone or other communications equipment by means of which all persons participating in the meeting can hear each other, and participation in the meeting pursuant to this section shall constitute presence in person at the meeting.
Furniture For no additional charge, Landlord hereby leases to Tenant and Tenant hereby leases from Landlord those items of furniture and artwork situated in the Premises (the "FURNITURE") and described on the inventory list attached hereto as EXHIBIT C (the "INVENTORY LIST"). Landlord hereby represents to Tenant that Landlord owns the Furniture and has the right to lease the Furniture to Tenant as described herein. Landlord and Tenant acknowledge that prior to the Lease Commencement Date the parties will conduct a "walk-through" inspection of the Premises in order to confirm the completeness and accuracy of the furniture shown on the Inventory List, and to give Tenant the opportunity to confirm that the Furniture is in good condition and repair. Subject to such "walk-through" inspection, Tenant accepts the Furniture in its "as-is" condition, without any representation or warranty by Landlord. LANDLORD SPECIFICALLY DISCLAIMS ANY REPRESENTATIONS AND/OR WARRANTIES, INCLUDING, WITHOUT LIMITATION, ANY WARRANTY OF MERCHANTABILITY OR OF FITNESS FOR A PARTICULAR PURPOSE WITH RESPECT TO THE FURNITURE. During the Term of this Lease, Tenant shall maintain and repair the Furniture as reasonably necessary, and shall insure the same along with its other personal property pursuant to ARTICLE 10 hereof. Upon the expiration or earlier termination of this Lease, Tenant shall surrender the Furniture to Landlord in the same condition and repair as on the Lease Commencement Date, reasonable wear and tear and damage by casualty excepted.
Tenant’s Property All insurance proceeds payable by reason of any loss of or damage to any of Tenant’s Personal Property shall be paid to Tenant and, to the extent necessary to repair or replace Tenant’s Personal Property in accordance with Section 10.5, Tenant shall hold such proceeds in trust to pay the cost of repairing or replacing damaged Tenant’s Personal Property.
Tenant’s Personal Property Tenant may (and shall as provided hereinbelow), at its expense, install, affix or assemble or place on any parcels of the Land or in any of the Leased Improvements, any items of Tenant’s Personal Property and Tenant shall, subject to the conditions set forth below and except for any Tenant’s Personal Property that is purchased by Lessor pursuant to Section 37.2 below, remove the same upon the expiration or any prior termination of the Term. Tenant shall provide and maintain during the entire Term all such Tenant’s Personal Property as shall be necessary in order to operate each Facility in compliance with all licensure and certification requirements, in compliance with all applicable Legal Requirements and Insurance Requirements and otherwise in accordance with customary practice in the industry for the Primary Intended Use. Lessor acknowledges that Leasehold Mortgagee has a security interest in Tenant’s Personal Property and, upon the expiration or earlier termination of this Lease as it relates to a Leased Property, Lessor agrees to permit Leasehold Mortgagee to enter on such Leased Property in order to remove such Tenant’s Personal Property, so long as Leasehold Mortgagee, at no expense to Lessor, repairs or causes to be repaired, any damage to such Leased Property caused by any such removal, and further agrees to subordinate, and hereby subordinates, to the lien of Leasehold Mortgagee on such Tenant’s Personal Property any xxxx Xxxxxx has thereon. All of Tenant’s Personal Property not removed by Tenant or Leasehold Mortgagee within twenty-one days following the expiration or earlier termination of this Lease with respect to the applicable Leased Property where such Tenant’s Personal Property is located or sold to Lessor pursuant to Section 37.2 below shall be considered abandoned by Tenant and Leasehold Mortgagee and may be appropriated, sold, destroyed or otherwise disposed of by Lessor without first giving notice thereof to Tenant or Leasehold Mortgagee and without any payment to Tenant or Leasehold Mortgagee and without any obligation to account therefor or otherwise dispose of the same in accordance with applicable law. Tenant will, at its expense, restore such Leased Property to the condition required by Section 9.1(d), including repair of all damage to the Leased Property caused by the removal of Tenant’s Personal Property, whether effected by Tenant, Leasehold Mortgagee or Lessor.
Removal of Tenant’s Property Upon the expiration or earlier termination of this Lease or the termination of Tenant's right of possession of the Premises only, Tenant shall have the right, at its sole cost and expense, for a period of fifteen ( 15) days thereafter to remove Tenant's Property, Distinctive Property and the Financed Personalty, respectively, from the Premises, provided that Tenant shall pay to Landlord Rent due under Article 3 hereof for the actual number of days which elapse during such fifteen (15) day period until the Tenant's Property, Distinctive Property and the Financed Personalty, as applicable, are removed from the Premises. If and to the extent that Tenant fails to remove any of such property by the expiration of said fifteen (15) day period, Landlord agrees that Tenant Lender, TE Lender and Franchisor each shall have the right for a period of forty (45) days thereafter to remove the same from the Premises, provided that Tenant shall pay to Landlord Rent due hereunder for the actual number of days which elapse until Tenant Lender, TE Lender or Franchisor remove the same from the Premises during such forty five (45) day period. If and to the extent that any such property remains on the Premises on the sixtieth (60th) day after such termination, the same shall be deemed abandoned, and at Landlord's option shall become the property of Landlord and may be sold or disposed of as Land-lord may determine; provided, however, that Landlord shall not use, suffer or permit the use of any Distinctive Property unless the attributes or features thereof associated with Tenant or Franchisor are removed or obliterated. Any and all damage to the Building caused by or resulting from the removal of Tenant's Property, Distinctive Property or Financed Personalty shall promptly be repaired at no cost or expense to Landlord and Tenant shall be liable for such cost and expense unless such repairs are made by Tenant, Franchisor or TE Lender, as the case may be.