Calculation Sample Clauses

Calculation. Each of the foregoing ratios and financial requirements shall be calculated as of the last day of each Fiscal Quarter.
AutoNDA by SimpleDocs
Calculation. Any figure or percentage referred to in this Agreement shall be carried to seven decimal places.
Calculation. The FSA will be calculated as follows:
Calculation. Interest will be computed on the basis of a year of 360 days and paid for the actual number of days elapsed.
Calculation. Said Wage Rates are to be utilized by the Consultant in calculating compensation payable for specific assignments and Work Orders as requested by the City. The Consultant shall identify job classifications, available staff and projected man-hours required for the proper completion of tasks and/or groups of tasks, milestones and deliverables identified under the Scope of Work as exemplified in Schedule A2, Key Staff.
Calculation. To ensure that the eligible assets (assets discounted based upon Fitch’s and Moody’s ratings, as described below) of the Fund are greater than the Fund’s basic maintenance amount (as described below). If the eligible assets are less than the basic maintenance amount, the Fund fails the test. Basic Maintenance Amount (BMA): The Fund’s basic maintenance amount is the sum of the following: BMA Component Calculation
Calculation. ((total problems – total problems failing standard) / total problems) * 100 = percentage problem response (as calculated by rounding to the second decimal point). Note: this calculation must be completed for each problem severity level.
AutoNDA by SimpleDocs
Calculation. In determining any amount provided for in this Section 2.11, the Affected Party may use any reasonable averaging and attribution methods. Any Affected Party making a claim under this Section 2.11 shall submit to the Agent, for delivery to the Borrower, a certificate as to such additional or increased cost or reduction, which certificate shall be conclusive absent manifest error.
Calculation. DDR is calculated as the number of E-Line EVC test frames, EVC test frames within the specified traffic priority class that are successfully delivered from PE to PE within the Core Network divided by the total number of E-Line EVC test frames, test frames within the specified traffic priority class, sent per calendar month is: DDR (DDR for load consisting of frames) = frames Delivered/frames Offered *100
Calculation. RTD is determined by measuring transit delay in milliseconds across the Verizon Core Network and averaging the results over a thirty (30) day period from when the Trouble Ticket was opened. RTD calculation is as follows: RTD = T2 – T1 where: T1 is the time when an Ethernet frame leaves the Ingress Reference Point (i.e., Frame exit event) and T2 is the time when an Ethernet Frame arrives back at the Ingress Reference Point (i.e. Frame return event) with the difference measured. RTD is measured between the respective origination and destination infrastructure Ports, i.e. between the points where the Frame enters and exits Verizon’s Core Network, regardless of the Local Access to Verizon’s Core Network. External factors, including, but not limited to, Local Access issues, are excluded from the measurement.
Time is Money Join Law Insider Premium to draft better contracts faster.