Manpower Loading Sample Clauses

Manpower Loading. The Baseline Schedule for construction and all schedule updates thereto will be manpower loaded. Each Schedule activity or task will be assigned a total number of craft-hours (based on direct man-hours including xxxxxxx and general xxxxxxx) as required to perform the Work involved. Contractor shall demonstrate to the reasonable satisfaction of the Owner that the total number of man-hours loaded in the Schedule are the same as and balance to the total direct man-hours estimated by Contractor.
AutoNDA by SimpleDocs

Related to Manpower Loading

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • System Logging The system must maintain an automated audit trail which can 20 identify the user or system process which initiates a request for PHI COUNTY discloses to 21 CONTRACTOR or CONTRACTOR creates, receives, maintains, or transmits on behalf of COUNTY, 22 or which alters such PHI. The audit trail must be date and time stamped, must log both successful and 23 failed accesses, must be read only, and must be restricted to authorized users. If such PHI is stored in a 24 database, database logging functionality must be enabled. Audit trail data must be archived for at least 3 25 years after occurrence.

  • Contractor Key Personnel ‌ The Contractor shall assign a Corporate OASIS Program Manager (COPM) and Corporate OASIS Contract Manager (COCM) as Contractor Key Personnel to represent the Contractor as primary points-of-contact to resolve issues, perform administrative duties, and other functions that may arise relating to OASIS and task orders solicited and awarded under XXXXX. Additional Key Personnel requirements may be designated by the OCO at the task order level. There is no minimum qualification requirements established for Contractor Key Personnel. Additionally, Contractor Key Personnel do not have to be full-time positions; however, the Contractor Key Personnel are expected to be fully proficient in the performance of their duties. The Contractor shall ensure that the OASIS CO has current point-of-contact information for both the COPM and COCM. In the event of a change to Contractor Key Personnel, the Contractor shall notify the OASIS CO and provide all Point of Contact information for the new Key Personnel within 5 calendar days of the change. All costs associated with Contractor Key Personnel duties shall be handled in accordance with the Contractor’s standard accounting practices; however, no costs for Contractor Key Personnel may be billed to the OASIS Program Office. Failure of Contractor Key Personnel to effectively and efficiently perform their duties will be construed as conduct detrimental to contract performance and may result in activation of Dormant Status and/or Off-Ramping (See Sections H.16. and H.17.).

  • Loading RPMG shall schedule the loading and shipping of all outbound corn oil purchased hereunder, but all labor and equipment necessary to load trucks and rail cars and other associated costs shall be supplied and borne by Producer without charge to RPMG. Producer shall handle the corn oil in a good and workmanlike manner in accordance with RPMG’s written requirements and normal industry practice. Producer shall maintain the truck and rail loading facilities in safe operating condition in accordance with normal industry standards and shall visually inspect all trucks and rail cars to assure (i) cleanliness so as to avoid contamination, and (ii) that such trucks and railcars are in a condition suitable for transporting the corn oil. RPMG and RPMG’s agents shall have adequate access to the Ethanol Facility to load Producer’s corn oil on an industry standard basis that allows RPMG to economically market Producer’s corn oil. RPMG’s employees shall follow all reasonable safety rules and procedures promulgated by Producer and provided to RPMG reasonably in advance and in writing. Producer shall supply product description tags, certificates of analysis, bills of lading and/or material safety data sheets that are applicable to all shipments. In the event that Producer fails to provide the labor, equipment and facilities necessary to meet RPMG’s loading schedule, Producer shall be responsible for all costs and expenses, including without limitation actual demurrage and wait time, incurred by RPMG resulting from or arising in connection with Producer’s failure to do so.

  • Infertility Services This plan covers the following services, in accordance with R.I. General Law §27-20-20. • Services for the diagnosis and treatment of infertility if you are:

  • Scope of Interconnection Service 1.3.1 The NYISO will provide Energy Resource Interconnection Service to Interconnection Customer at the Point of Interconnection.

  • The Site The site of the Project Highway (the “Site”) shall comprise the site described in Schedule-A in respect of which the Right of Way shall be provided by the Authority to the Contractor. The Authority shall be responsible for:

  • Dewatering 4.7.1 Where a part of a site is affected by surface water following a period of rain, thus rendering some areas unsafe for productive work, consistent with the Employer’s obligations under the OH&S Act, all non- trades employees shall assist in ‘dewatering’ their own work site or area if it is so affected. Such work to be paid at single time rates. Productive work will continue in areas not so affected.

  • Green Economy/Carbon Footprint a) The Supplier/Service Provider has in its bid provided Transnet with an understanding of the Supplier’s/Service Provider’s position with regard to issues such as waste disposal, recycling and energy conservation.

  • Passengers THE CARRIER shall be liable for damages resulting from the death of a Passenger or any bodily injury sustained by a Passenger if the act causing the damages took place on board the aircraft or during boarding or deboarding operations.

Time is Money Join Law Insider Premium to draft better contracts faster.