Water System Development Fee definition

Water System Development Fee means the fee payable by a District Customer to District and District to Provider in accordance with this Agreement with respect to any new or expanded connection of a District Customer to the District Water System made after the Closing Date, whether metered or unmetered.

Examples of Water System Development Fee in a sentence

  • The Foreign Water System Development Fee shall be set by the City Council by ordinance, and shall be paid by the applicant at the time of final approval of the development by the City.

  • The purpose of the Foreign Water System Development Fee is to meet the costs of offsite improvements necessary for the City to incorporate foreign water into the City’s water system on an ongoing basis.

  • ORDINANCE AMENDING DIVISION 7 OF THE MUNICIPAL CODE – WATER SYSTEM DEVELOPMENT FEE: Ordinance No. 5284: MOTION: Councilmember Reece moved, seconded by Councilmember Gaines, the Council Approve the Ordinance Amending Division 7 of the Municipal Code – Water System Development Fee.

  • In addition to the water service connection fee, a Water System Development Fee shall be assessed for each connection.

  • The Water System Development Fee was created to fund the cost of the future water system improvements and is imposed upon future development within the water system service area.

  • The City of Azusa adopted an Ordinance in 1988 creating a Water System Development Fee.

  • DOMESTIC WATER METERS:The DOW ordinarily requires payment of a facilities reserve charge (FRC) [currently $ 4,600.00 now called Water System Development Fee (WSDF) for connecting to their system.

  • Item 3.D: A Resolution (No. 2015-080) of the City Council of the City of Riverbank Appropriating $6,500 from the Waste Water System Development Fee Fund (207) Reserve for the Preparation of a Soil Condition Study for the California Avenue Sewer Line Extension.

  • Current and Proposed Water System Development Fee 5WATER SYSTEM DEVELOPMENT FEE ANALYSIS 6CURRENT USE AND AVAILABLE CAPACITY 6Figure 2.

  • Table 3-3 Water System Development Fee Schedule Table 3-4 Sewer System Development Fee Schedule Table 3-5 below shows the existing and calculated water and sewer combined system development fee for a residential ERU, assuming a 3 bedroom house using 120 gallons per day per bedroom for the sewer system.

Related to Water System Development Fee

  • Development Fee means a fee for the packaging of a Property, including negotiating and approving plans, and undertaking to assist in obtaining zoning and necessary variances and necessary financing for the Property, either initially or at a later date.

  • Development Area means that area to which a development plan is applicable.

  • Development Fees means fees imposed to offset capital costs of providing public infrastructure, public safety or other public services to a development and authorized pursuant to A.R.S. Section 9-463.05, A.R.S. Section 11-1102 or A.R.S. Title 48 regardless of the jurisdiction to which the fees are paid.

  • Development Phase means the period before a vehicle type is type approved.

  • Development Site means any parcel or lot on which exists or which is intended for building development other than the following:

  • Construction Phase Services means the coordination, implementation and execution of the Work required by this Agreement, which are further defined in Article 8.

  • Redevelopment Area means the community redevelopment area described, defined or otherwise identified or referred to in the Redevelopment Plan.

  • spatial development framework means the Kouga Municipal Spatial Development Framework prepared and adopted in terms of sections 20 and 21 of the Act and Chapter 2 of this By-Law;

  • Development Project means a project for the development of land within a

  • Development Work means the work of development to be performed on or with respect to the Land (including, without limitation, the installation of utilities, roads and all related on-site and off-site improvements) in connection with the development of the Land for the subsequent construction thereon of Homes, all of which work and construction shall be completed by or on behalf of the Borrower in accordance with the Plans and Specifications, but shall not include the Construction Improvements.

  • site development plan means a dimensioned plan drawn to scale that indicates details of the proposed land development, including the site layout, positioning of buildings and structures, property access, building designs and landscaping;

  • municipal spatial development framework means a municipal spatial development framework adopted by the Municipality in terms of Chapter 5 of the Municipal Systems Act;

  • The Project Plan means the document to be developed by the Supplier and approved by the Purchaser, pursuant to GCC Clause 19, based on the requirements of the Contract and the Preliminary Project Plan included in the Supplier’s bid. The “Agreed and Finalized Project Plan” is the version of the Project Plan approved by the Purchaser, in accordance with GCC Clause 19.2. Should the Project Plan conflict with the Contract in any way, the relevant provisions of the Contract, including any amendments, shall prevail.

  • Mixed use development means a Building used, designed or intended for Residential and Non-Residential uses, where:

  • Redevelopment Project Area means an area designated by the municipality, which is not less in the aggregate than 1 1/2 acres and in respect to which the municipality has made a finding that there exist conditions which cause the area to be classified as an industrial park conservation area or a blighted area or a conservation area, or a combination of both blighted areas and conservation areas.

  • The Works/Project means the works to be executed or done under this contract.

  • Project Water means water made available for delivery to the contractors by project conservation facilities and the transportation facilities included in the System.

  • Interconnection Feasibility Study means either a Generation Interconnection Feasibility Study or Transmission Interconnection Feasibility Study.

  • Development Works means the external development works and internal development works on immovable property;

  • Stormwater system means constructed and natural features which function together as a system to collect, convey, channel, hold, inhibit, retain, detain, infiltrate, divert, treat, or filter stormwater. “Stormwater system” includes both public and privately owned features.

  • Public works project means the erection, construction, alteration, repair, or improvement of any public structure, building, road, or other public improvement of any kind.

  • generating plant means the generating facility described in Schedule 1 as amended from time to time;

  • Redevelopment project means a specific construction project

  • Project means the goods or Services described in the Signature Document or a Work Order of this Contract.

  • Stormwater management planning area means the geographic area for which a stormwater management planning agency is authorized to prepare stormwater management plans, or a specific portion of that area identified in a stormwater management plan prepared by that agency.

  • Wastewater System means a system of wastewater collection, treatment,