Water resource development project definition

Water resource development project means a project eligible for funding pursuant to s. 259.105 that increases the amount of water available to meet the needs of natural systems and the citizens of the
Water resource development project means a project
Water resource development project means a project eligible for funding pursuant to s. 259.105 that increases the amount of water available to meet the needs of natural systems and the citizens of the state by enhancing or restoring aquifer recharge, facilitating the capture and storage of excess flows in surface waters, or promoting reuse. The implementation of eligible projects under s. 259.105 includes land acquisition, land and water body restoration, aquifer storage and recovery facilities, surface water reservoirs, and other capital improvements. The term does not include construction of treatment, transmission, or distribution facilities with the exception of regional transmission facilities that transport reclaimed water or stormwater for reuse or regional transmission facilities that interconnect multiple water utilities located wholly within one county or within one regional water supply authority for the purpose of optimizing water withdrawals and reducing water resource impacts, with such interconnect facilities being identified as projects under s. 373.0361(2)(b) of an approved water management district regional water supply plan.

Examples of Water resource development project in a sentence

  • Community managed water resource development program Dag Block Water resource development project phase II.

  • Water resource development project authorities will most likely need to be amended in future WRDA bills to establish authority for such improvements and sort out how best to apportion design and construction costs – and long-term energy-production benefits – from the panels.


More Definitions of Water resource development project

Water resource development project means a project eligible for funding pursuant to s. 259.105 that increases the amount of water available to meet the needs of natural systems and the citizens of the state by enhancing or restoring aq- uifer recharge, facilitating the capture and storage of excess flows in surface waters, or promoting reuse. The implementation of eligible projects under s. 259.105 in- cludes land acquisition, land and water body restoration, aquifer storage and recov- ery facilities, surface water reservoirs, and other capital improvements. The term does not include construction of treatment, transmission, or distribution facilities.

Related to Water resource development project

  • site development plan means a dimensioned plan drawn to scale that indicates details of the proposed land development, including the site layout, positioning of buildings and structures, property access, building designs and landscaping;

  • Development Project means a project for the development of land within a

  • Economic development project means land and existing or planned improvements suitable for use by an industrial or commercial enterprise, or housing development, or the protection of the environment, including, but not limited to, groundwater or surface water. Economic development project includes necessary buildings, improvements, or structures suitable for and intended for or incidental to use as an industrial or commercial enterprise or housing development; and includes industrial park or industrial site improvements and port improvements or housing development incidental to an industrial or commercial enterprise; and includes the machinery, furnishings, and equipment necessary, suitable, intended for, or incidental to a commercial, industrial, or residential use in connection with the buildings or structures.

  • Water resources means all waters of the state occurring on the surface, in natural or artificial channels, lakes, reservoirs, or impoundments, and in subsurface aquifers, which are available, or which may be made available to agricultural, industrial, commercial, recreational, public, and domestic users;

  • Infrastructure project means any construction or acquisition of treatment works,

  • Redevelopment project means a specific construction project

  • Development Phase means the period before a vehicle type is type approved.

  • Total resource cost test or "TRC test" means a standard that is met if, for an investment in energy efficiency or demand-response measures, the benefit-cost ratio is greater than one. The benefit-cost ratio is the ratio of the net present value of the total benefits of the program to the net present value of the total costs as calculated over the lifetime of the measures. A total resource cost test compares the sum of avoided electric utility costs, representing the benefits that accrue to the system and the participant in the delivery of those efficiency measures, as well as other quantifiable societal benefits, including avoided natural gas utility costs, to the sum of all incremental costs of end-use measures that are implemented due to the program (including both utility and participant contributions), plus costs to administer, deliver, and evaluate each demand-side program, to quantify the net savings obtained by substituting the demand-side program for supply resources. In calculating avoided costs of power and energy that an electric utility would otherwise have had to acquire, reasonable estimates shall be included of financial costs likely to be imposed by future regulations and legislation on emissions of greenhouse gases.

  • spatial development framework means the Kouga Municipal Spatial Development Framework prepared and adopted in terms of sections 20 and 21 of the Act and Chapter 2 of this By-Law;

  • municipal spatial development framework means a municipal spatial development framework adopted by the Municipality in terms of Chapter 5 of the Municipal Systems Act;

  • Infrastructure improvement means permanent infrastructure that is essential for the public health and safety or that:

  • Redevelopment Project Area means an area designated by the municipality, which is not less in the aggregate than 1 1/2 acres and in respect to which the municipality has made a finding that there exist conditions which cause the area to be classified as an industrial park conservation area or a blighted area or a conservation area, or a combination of both blighted areas and conservation areas.

  • The Works/Project means the works to be executed or done under this contract.

  • Mixed use development means a Building used, designed or intended for Residential and Non-Residential uses, where:

  • Commercial Development Plan means the written commercialization plan attached as Appendix E.

  • Commercial project means any project, including, but not

  • Development Site means any parcel or lot on which exists or which is intended for building development other than the following:

  • General air quality operating permit or "general permit" means an air quality operating permit that meets the requirements of ARM 17.8.1222, covers multiple sources in a source category, and is issued in lieu of individual permits being issued to each source.

  • Renewable energy project means (A) a project

  • Development Area means that area to which a development plan is applicable.

  • cogeneration means the simultaneous generation in one process of thermal energy and electrical or mechanical energy;

  • Public works project means the erection, construction, alteration, repair, or improvement of any public structure, building, road, or other public improvement of any kind.

  • Commercial Development means any development on private land that is not heavy industrial or residential. The category includes, but is not limited to: hospitals, laboratories and other medical facilities, educational institutions, recreational facilities, plant nurseries, multi-apartment buildings, car wash facilities, mini-malls and other business complexes, shopping malls, hotels, office buildings, public warehouses and other light industrial complexes.

  • Initial Development Plan has the meaning set forth in Section 3.2(b).

  • Stormwater management planning area means the geographic area for which a stormwater management planning agency is authorized to prepare stormwater management plans, or a specific portion of that area identified in a stormwater management plan prepared by that agency.

  • Solar PV Project means the solar Photo Voltaic Power project that uses sunlight for direct conversion into electricity through Photo Voltaic technology.