Examples of Water Pipeline in a sentence
These plates shall be fixed on C.C. at 75mm to 100mm above floor level.For flushing arrangement, one 25mm dia G.I. Common Water Pipeline (minimum size) shall be fixed on the wall parallel to floor.
These facilities will include the terminal reservoir, terminal reservoir pump station, overflow facilities and related appurtenance needed to assist in the moving of water to and from the ASR Infrastructure, other ASR facilities, and Product Water Pipeline.
One or more of the contracts between Cal-Am and a selected contractor, valued in excess of $1 million, relating to the design and/or construction of the following facilities: (1) the Desalination Infrastructure, (2) the Source Water Infrastructure, (3) the Brine Discharge Infrastructure contracted for by Cal-Am, (4) the Product Water Pipeline, (5) the Raw Water Pipeline; (6) the ASR Infrastructure, and (7) the Terminal Reservoir Infrastructure.
The combination of the Desalination Infrastructure, the Brine Discharge Infrastructure, the Source Water Infrastructure, the Product Water Pipeline, the Raw Water Pipeline, and the Terminal Reservoir Infrastructure.
The Water Pipeline Project is owned by the City of Saint Peters (31.8%) and the City of Saint Charles (68.2%).
The purpose of the Water Pipeline Project is to construct and operate a water pipeline and appurtenant facilities from the Howard Bend Treatment Plant, owned and operated by the City of Saint Louis, Missouri, to the separate facilities of the municipalities of Saint Peters, Missouri, and Saint Charles, Missouri, in order to adequately supply water by the pipeline to the citizens and businesses of the municipalities.
Saint Peters-Saint Charles Water Pipeline Project (Water Pipeline Project) The Water Pipeline Project was formed under the laws of the state of Missouri on October 2, 1985.
Motion by Sarah Tourdot, second by Kylie Vadnais, to approve vouchers as presented totaling $892,093.25.
The City of Saint Peters is responsible for managing and accounting for the daily operations of the Water Pipeline Project, except when concurrence of both cities is required.
Chapter 5 DiscussionThe goal of this chapter is to reflect the empirically collected data with the theoreti- cal background and answer the stated research questions.