Virginia Stormwater Management Program (VSMP) permit definition

Virginia Stormwater Management Program (VSMP) permit means a document issued by the permit-issuing authority pursuant to the Virginia Stormwater Management Act and this chapter authorizing, under prescribed conditions, the potential or actual discharge of pollutants from a point source to surface waters. Under the approved state program, a VSMP permit is equivalent to a NPDES permit.
Virginia Stormwater Management Program (VSMP) permit or “VSMP permit” means 686 a document issued by the permit- issuing authority pursuant to the Virginia Stormwater
Virginia Stormwater Management Program (VSMP) permit or "VSMP permit" means a 804 document issued by the permit-issuing authority pursuant to the Virginia Stormwater 805 Management Act and this chapter authorizing, under prescribed conditions, the potential or

Examples of Virginia Stormwater Management Program (VSMP) permit in a sentence

  • All construction activities involving land disturbances equal to or exceeding ten thousand (10,000) square feet must be covered by a Virginia Stormwater Management Program (VSMP) permit approved and issued by the County in accordance with the County of Albemarle’s Water Protection Ordinance.

  • Compliance with the water quantity minimum standards set out in 9VAC25-870-66 of the Virginia Stormwater Management Program (VSMP) permit regulations shall be deemed to satisfy the requirements of minimum standard 19.

  • Prior to the start of any site grading work, the developer or owner shall obtain a Virginia Stormwater Management Program (VSMP) permit from the City of Fairfax.

  • Discharges that are covered under a separate individual or general Virginia Pollutant Discharge Elimination System (VPDES) or Virginia Stormwater Management Program (VSMP) permit for non-stormwater discharges.

  • Term life insurance policy investment option provided through Allianz Life Insurance.

  • Land disturbances over 1 acre require a construction site Virginia Stormwater Management Program (VSMP) permit issued by DEQ, which requires the project to develop a Stormwater Pollution Prevention Plan (SWPPP).

  • Additionally, this project will include land disturbing activities of one acre or more and will therefore require a Virginia Stormwater Management Program (VSMP) permit.

  • Discharges that are covered under a separate individual or general Virginia Pollutant Discharge Elimination System (VPDES) or Virginia Stormwater Management Program (VSMP) permit for non‐ stormwater discharges.

  • Since that time, Isle of Wight County has developed a Phase II MS4 (Municipal Separate Storm Sewer System) Stormwater Program and obtained a Virginia Stormwater Management Program (VSMP) permit from the Virginia Department of Conservation and Recreation (DCR) in 2003 for the County’s stormwater discharges.

  • The Applicant shall exceed the stormwater quality requirements of the Part II.C. Technical Criteria of the Virginia Stormwater Management Program (VSMP) permit regulations dated September 13, 2001.


More Definitions of Virginia Stormwater Management Program (VSMP) permit

Virginia Stormwater Management Program (VSMP) permit means a document issued by the

Related to Virginia Stormwater Management Program (VSMP) permit

  • Virginia Stormwater Management Program authority or "VSMP authority" means an authority approved by the State Board after September 13, 2011, to operate a Virginia Stormwater Management Program.

  • Virginia Stormwater Management Program or “VSMP” means a program approved by the State Board after September 13, 2011, that has been established by a locality to manage the quality and quantity of runoff resulting from land-disturbing activities and shall include such items as local ordinances, rules, permit requirements, annual standards and specifications, policies and guidelines, technical materials, and requirements for plan review, inspection, enforcement, where authorized in this article, and evaluation consistent with the requirements of this article and associated regulations.

  • Stormwater management plan means the set of drawings and other documents that comprise all the information and specifications for the programs, drainage systems, structures, BMPs, concepts and techniques intended to maintain or restore quality and quantity of stormwater runoff to pre-development levels.

  • Storm water management plan means a comprehensive plan designed to reduce the discharge of pollutants from storm water after the site has under gone final stabilization following completion of the construction activity.

  • Stormwater management system means any equipment, plants,

  • Virginia Stormwater Management Act means Article 2.3 (§ 62.1-44.15:24 et seq.) of Chapter 3.1 of Title 62.1 of the Code of Virginia.

  • Stormwater management BMP means an excavation or embankment and related areas designed to retain stormwater runoff. A stormwater management BMP may either be normally dry (that is, a detention basin or infiltration system), retain water in a permanent pool (a retention basin), or be planted mainly with wetland vegetation (most constructed stormwater wetlands).

  • Stormwater management measure means any practice, technology, process, program, or other method intended to control or reduce stormwater runoff and associated pollutants, or to induce or control the infiltration or groundwater recharge of stormwater or to eliminate illicit or illegal non-stormwater discharges into stormwater conveyances.

  • Stormwater management planning agency means a public body authorized by legislation to prepare stormwater management plans.

  • Stormwater management means the programs to maintain quality and quantity of stormwater runoff to pre-development levels.

  • Stormwater management planning area means the geographic area for which a stormwater management planning agency is authorized to prepare stormwater management plans, or a specific portion of that area identified in a stormwater management plan prepared by that agency.

  • Stormwater management facility means a control measure that controls stormwater runoff and changes the characteristics of that runoff including, but not limited to, the quantity and quality, the period of release or the velocity of flow.

  • Stormwater management basin means an excavation or embankment and related areas designed to retain stormwater runoff. A stormwater management basin may either be normally dry (that is, a detention basin or infiltration basin), retain water in a permanent pool (a retention basin), or be planted mainly with wetland vegetation (most constructed stormwater wetlands).

  • New Jersey Stormwater Best Management Practices (BMP) Manual or “BMP Manual” means the manual maintained by the Department providing, in part, design specifications, removal rates, calculation methods, and soil testing procedures approved by the Department as being capable of contributing to the achievement of the stormwater management standards specified in this chapter. The BMP Manual is periodically amended by the Department as necessary to provide design specifications on additional best management practices and new information on already included practices reflecting the best available current information regarding the particular practice and the Department’s determination as to the ability of that best management practice to contribute to compliance with the standards contained in this chapter. Alternative stormwater management measures, removal rates, or calculation methods may be utilized, subject to any limitations specified in this chapter, provided the design engineer demonstrates to the municipality, in accordance with Section IV.F. of this ordinance and N.J.A.C. 7:8-5.2(g), that the proposed measure and its design will contribute to achievement of the design and performance standards established by this chapter.

  • General air quality operating permit or "general permit" means an air quality operating permit that meets the requirements of ARM 17.8.1222, covers multiple sources in a source category, and is issued in lieu of individual permits being issued to each source.

  • Energy Use Intensity (EUI means the kBTUs (1,000 British Thermal Units) used per square foot of gross floor area.

  • disaster management means a continuous and integrated process of planning, organising, coordinating and implementing measures which are necessary or expedient for—

  • Municipal Separate Storm Sewer System Management Program means a management program covering the duration of a state permit for a municipal separate storm sewer system that includes a comprehensive planning process that involves public participation and intergovernmental coordination, to reduce the discharge of pollutants to the maximum extent practicable, to protect water quality, and to satisfy the appropriate water quality requirements of the CWA and regulations, and this article and its attendant regulations, using management practices, control techniques, and system, design, and engineering methods, and such other provisions that are appropriate.

  • Project Management Plan means the management plan that (i) sets out a high level workplan to describe the manner in which the Design-Builder will manage the Project, including to address related matters such as traffic management and communications, and (ii) is prepared by or for the Design-Builder and submitted to the Owner;

  • Database Management System (DBMS) A system of manual procedures and computer programs used to create, store and update the data required to provide Selective Routing and/or Automatic Location Identification for 911 systems. Day: A calendar day unless otherwise specified. Dedicated Transport: UNE transmission path between one of CenturyLink’s Wire Centers or switches and another of CenturyLink’s Wire Centers or switches within the same LATA and State that are dedicated to a particular customer or carrier. Default: A Party’s violation of any material term or condition of the Agreement, or refusal or failure in any material respect to properly perform its obligations under this Agreement, including the failure to make any undisputed payment when due. A Party shall also be deemed in Default upon such Party’s insolvency or the initiation of bankruptcy or receivership proceedings by or against the Party or the failure to obtain or maintain any certification(s) or authorization(s) from the Commission which are necessary or appropriate for a Party to exchange traffic or order any service, facility or arrangement under this Agreement, or notice from the Party that it has ceased doing business in this State or receipt of publicly available information that signifies the Party is no longer doing business in this State.

  • energy management system means a set of interrelated or interacting elements of a plan which sets an energy efficiency objective and a strategy to achieve that objective;

  • Asset Management Plan means a plan created by the department and approved by the state transportation commission or a plan created by a local road agency and approved by the local road agency's governing body that includes provisions for asset inventory, performance goals, risk of failure analysis, anticipated revenues and expenses, performance outcomes, and coordination with other infrastructure owners.

  • Pest Management Plan and “PMP” means the Recipient’s plan dated December 13, 2010, which: (i) addresses the concerns relating to the Project risks associated with potential increases in the use of pesticides for agricultural production, intensification and diversification and controlling disease vector populations arising from irrigation schemes; (ii) sets forth mitigation and monitoring measures to be taken during Project implementation and operation to eliminate adverse environmental and social impacts, offset them, or reduce them to acceptable levels; (iii) recommends institutional measures to strengthen national capacities to implement the mitigation and monitoring measures; and (iv) as part of the implementation arrangements, identifies national agencies and other partners that could play a vital role in the success of the Project.

  • Best management practice (BMP means a structural device or nonstructural practice designed to temporarily store or treat stormwater runoff in order to mitigate flooding, reduce pollution, and provide other amenities.

  • Construction Management Agreement means the Construction Management Agreement, dated as of the date of the Common Agreement, between Construction Manager and the Project Company.

  • Urban Coordinating Council Empowerment Neighborhood means a neighborhood given priority access to State resources through the New Jersey Redevelopment Authority.