Verification method definition

Verification method. Visual inspection of computer operation via software. Verification Period & Frequency: One-time post-retrofit year. Verification Details:
Verification method. The results of measuring the corporate carbon footprint are published in the company's communication media using instructive and simple language. Deadline: Months 12 and 24 Measure 2.7: Salmon farming participating companies will design and implement a climate change mitigation and adaptation plan, which will include at least the following.
Verification method. R – review (Dimensional report) The OAP shall be delivered mounted on a specific modular HF with SD approximately 360 x 320 x 90 mm3 and custom hole patterns. The final design of such HF can be defined later on under discussion with the CA, including exact dimensions, mounting interfaces and holes. Verification method: I – inspection (including photo documentation) The specific HF must be HV compatible with the same requirements REQ-034935/A and REQ-034936/A. The contact between the OAP and the HF shall be made via amorphous thermoplastic with excellent vacuum compatibility. Verification method: I – inspection (including photo documentation) The OAP mirrors shall have a pictogram specifying the off-axis angle with respect to the optical axes. Verification method: I – inspection (including photo documentation) The OAP mirrors shall have the following information engraved into the top of the substrate barrel: □ Part number: ∇ 22060263 CPOAP E5 50degF375∇ □ Mark (triangle) pointing to the HR coated front side S1 Verification method: I – inspection Figure 1: Overview of the OAP drawing for the ▇▇▇▇ platform: PD = 310x270 mm2, CAP = 250x250 mm2, SFL=375 mm, off axis angle = 50° (see Chapter 1.4; RD-01).

Examples of Verification method in a sentence

  • REQ-030053/A Verification method: R – review The Supplier shall provide verification protocols outlining the results of tests executed for each optical Diode Modules before their delivery at ▇▇▇ Beamlines premises to confirm specification conformity (see REQ-030060/A).

  • Verification method: I – inspection (including photo documentation) The chamfers of the OAP mirror substrates shall comply with the reference drawing RD-01 (Chapter 1.4 - drawing № 00329445/00).

  • Verification method: R – review The outgassing of vacuum components shall be free of hydrocarbons and the appropriate proofs shall be performed by Supplier using a sufficiently sensitive residual gas analyzer, usually equipped with a secondary electron multiplier (SEM).

  • Verification method: R – review REQ-028710/A REQ-028711/A REQ-028712/A The Supplier shall provide to the CA the description of the vacuum cleaning procedure which will be reviewed and approved by the CA.

  • Verification method: R - review, T - test (Surfaces quality report) REQ-028321/A 4 pcs 2-inch diameter substrates shall be manufactured from the exact same material and polished with the exact same surface finish as the OAP mirrors as representative witness samples of the OAP for surface tests and further coating LDT tests.

  • REQ-031150/A Verification method: R - review The parameters of the M4, M4.5 and M5 coated mirrors shall correspond to the requirements given in the reference drawing RD- 01 (M4_1c_rev01; see chapter 1.4).

  • REQ-030042/A Verification method: T - test The Diodes shall include a Machine Protection Fault output (or multiple outputs for every individual device).

  • REQ-030029/A Verification method: R – review, T - test Diode modules shall not be damaged by the application of any voltage from -30 to +30 V DC to this analog input or by any arbitrary instantaneous change of the applied voltage to any value within this range.

  • REQ-030038/A Verification method: R – review All Configuration Parameters (Table 3) shall be permanently retained and restored automatically in the event of a power cycle, with the exception of the Alignment Beam and Output Enable parameters, which shall default to off/disabled on restoration of power.

  • REQ-031151/A Verification method: R - review, T - test (QRs - I, II, III, IV; see REQ-031157/A) The parameters of the L4n M1 and M2 type coated mirrors shall correspond to the requirements given in the reference drawing RD- 01 (L4nM1_1c_rev00; see chapter 1.4).


More Definitions of Verification method

Verification method. A circular economy roadmap for the industry focused on waste that includes the points mentioned above. Deadline: Month 14
Verification method. The CA shall agree the related documentation and issue Acceptance protocol for the Supplier at the acceptance of the related Phase of delivery.
Verification method on the checklist means how to find the answer of the question. Some questions need several checkpoints to identify the answer.

Related to Verification method

  • Balance Computation Method We use the daily balance method to calculate the interest on your account. This method applies a daily periodic rate to the balance in the account each day. Compounding and Crediting: Interest is compounded daily and calculated on a 365/366 day basis. Interest is credited on a monthly basis.

  • CEC Certification and Verification means that the CEC has certified (or, with respect to periods before the Project has commenced commercial operation (as such term is defined by and according to the CEC), that the CEC has pre-certified) that the Project is an ERR for purposes of the California Renewables Portfolio Standard and that all Energy produced by the Project qualifies as generation from an ERR for purposes of the Project.

  • Busy Line Verification (BLV) means a service whereby an End User requests an operator to confirm the busy status of a line.

  • Busy Line Verification (BLV) means a service whereby an End User requests an operator to confirm the busy status of a line.

  • Alternative method means any method of sampling and analyzing for an air pollutant that is not a reference or equivalent method but that has been demonstrated to the satisfaction of the commissioner and the U.S. EPA to, in specific cases, produce results adequate for a determination of compliance.