Underutilized Oklahoma Resource Project definition

Underutilized Oklahoma Resource Project means a project, including but not limited to pipeline gathering systems and electric generation stations, which allows the production of oil or natural gas reserves which previously were not being produced due to problems such as chemical composition, location in relation to appropriate pipeline systems or pressure of the product.

Related to Underutilized Oklahoma Resource Project

  • Gasification means the substoichiometric oxidation or steam reformation of a substance to produce a gaseous mixture containing two or more of the following: (i) oxides of carbon; (ii) methane; and (iii) hydrogen;

  • generating plant means the generating facility described in Schedule 1 as amended from time to time;

  • Mixed-use project means a project comprising both a qualified

  • Stormwater management planning area means the geographic area for which a stormwater management planning agency is authorized to prepare stormwater management plans, or a specific portion of that area identified in a stormwater management plan prepared by that agency.

  • Solar PV Project means the solar Photo Voltaic Power project that uses sunlight for direct conversion into electricity through Photo Voltaic technology.

  • The Works/Project means the works to be executed or done under this contract.

  • cogeneration means the simultaneous generation in one process of thermal energy and electrical or mechanical energy;

  • Project means the goods or Services described in the Signature Document or a Work Order of this Contract.

  • Power Plant means a facility for the generation of

  • Energy Use Intensity (EUI means the kBTUs (1,000 British Thermal Units) used per square foot of gross floor area.

  • Cogeneration unit means a unit that is able to operate in cogeneration mode;

  • Renewable energy project means (A) a project

  • Sub-project means a specific development project to be carried out by a Beneficiary utilizing the proceeds of a Sub-loan;

  • Environmentally-Limited Resource means a resource which has a limit on its run hours imposed by a federal, state, or other governmental agency that will significantly limit its availability, on either a temporary or long-term basis. This includes a resource that is limited by a governmental authority to operating only during declared PJM capacity emergencies.

  • Campsite means any place where any bedding, sleeping bag, or other material used for bedding purposes, or any stove or fire is placed, established or maintained for the purpose of maintaining a temporary place to live, whether or not such place incorporates the use of any tent, lean-to, shack, or any other structure, or any vehicle or part thereof.

  • Infrastructure project means any construction or acquisition of treatment works,

  • Electric generating unit means an individual electric generator and its associated plant and apparatus whose electrical output is capable of being separately identified and metered. Emergency Condition shall mean a condition or situation: (1) that in the judgment of the Party making the claim is imminently likely to endanger life or property; or (2) that, in the case of the CAISO, is imminently likely (as determined in a non-discriminatory manner) to cause a material adverse effect on the security of, or damage to, the CAISO Controlled Grid or the electric systems of others to which the CAISO Controlled Grid is directly connected; (3) that, in the case of the Participating TO, is imminently likely (as determined in a non-discriminatory manner) to cause a material adverse effect on the security of, or damage to, the Participating TO’s Transmission System, Participating TO’s Interconnection Facilities, Distribution System, or the electric systems of others to which the Participating TO’s electric system is directly connected; or

  • Electric utility steam generating unit means any steam electric generating unit that is constructed for the purpose of supplying more than one-third of its potential electric output capacity and more than 25 MW electrical output to any utility power distribution system for sale. Any steam supplied to a steam distribution system for the purpose of providing steam to a steam-electric generator that would produce electrical energy for sale is also considered in determining the electrical energy output capacity of the affected facility.

  • Infrastructure facility means a building; structure; or networks of buildings, structures, pipes, controls, and equipment, or portion thereof, that provide transportation, utilities, public education, or public safety services. Included are government office buildings; public schools; courthouses; jails; prisons; water treatment plants, distribution systems, and pumping stations; wastewater treatment plants, collection systems, and pumping stations; solid waste disposal plants, incinerators, landfills, and related facilities; public roads and streets; highways; public parking facilities; public transportation systems, terminals, and rolling stock; rail, air, and water port structures, terminals, and equipment.

  • Projects means the projects identified in Exhibit A to the Agreement and all other projects, any costs of which are included in a Transitional Capital Plan pursuant to the Act or are Recovery Costs, and financed, by payment or reimbursement, with the proceeds of Bonds or Notes.

  • Generating Facility means the Generating Unit(s) comprising Seller’s power plant, as more particularly described in Section 1.02 and Exhibit B, including all other materials, equipment, systems, structures, features and improvements necessary to produce electric energy and thermal energy, excluding the Site, land rights and interests in land.

  • Project Company means Company incorporated by the bidder as per Indian Laws in accordance with Clause no 3.5.

  • Pilot project means an innovative environmental project that covers one or more designated facilities, designed and implemented in the form of an EMSA. (See Section 52.3 of the Act.)

  • Train Unloading Infrastructure means train unloading infrastructure reasonably required for the unloading of iron ore from the Railway to be processed, or blended with other iron ore, at processing or blending facilities in the vicinity of that train unloading infrastructure and with the resulting iron ore products then loaded on to the Railway for transport (directly or indirectly) to a loading port. Company to obtain prior Ministerial in-principle approval

  • New Project means (a) each facility or operating location which is either a new facility, location or office or an expansion, relocation, remodeling or substantial modernization of an existing facility, location or office owned by the Borrower or its Subsidiaries which in fact commences operations and (b) each creation (in one or a series of related transactions) of a business unit to the extent such business unit commences operations or each expansion (in one or a series of related transactions) of business into a new market.

  • Commercial project means any project, including, but not