Examples of Underground Storage System in a sentence
A completed Form 62-761.900(5), Underground Storage System Installation and Removal Form for Certified Contractors (Certified Contractors Form), effective date, January 2017, hereby adopted and incorporated by reference, shall be submitted in paper or electronic format to the County no later than 21 days after installation of a storage tank system, storage tank, or integral piping.
Underground Storage System #5 already had an impervious barrier to the west of the system.
Performance CriteriaAcceptable SolutionsNotes/CommentsP4.1.1 – Emergency Spillage Response PlanAn Emergency Spillage Response Plan (ESRP) for spilt hazardous materials must be developed and implemented as part of the Underground Storage System (USS) Management System.
Solution50% of current year payments allocated to new claim reports, 90% of which are for the current AY (1997 = $10,000 total x 50% x 90% = $4,500) and10% are for next previous AY (1996 = $10,000 x 50% x 10% = $500), BUT ULAE pmts allocated in this step cannot exceed 10% of EP, hence only $3,800 can be allocated to 1997, with the excess of $700 added to the allocation pot in step 2 below.
The rim elevation of CB#3 is now higher than the 100-year ponding elevation of Underground Storage System #5.
During the lifetime of the Optionee, any option granted to such Optionee shall be exercisableonly by the Optionee or his or her lawfully permitted transferee; provided, however, that the Plan Administrator may, in its sole discretion, permit the transfer of options granted to the Optionee to such extent as permitted by Rule 701 under the 1933 Act and in a manner consistent with applicable tax and securities laws upon the Optionees request.
Indicate whether the type of tank is an aboveground or underground storage tank and provide the size and age of the leaking tank.If an underground tank was closed 2 (i.e. excavated/removed or abandoned-in-place), indicate how it was closed.Provide the name of the MDE Certified Underground Storage System Remover or Technician that performed the closure and their MDIC Number.
Grading (Sheet C-4) – Proposed finish grades on the east side of the Lot 4 and Lot 5 houses is lower than the ponding elevations with Underground Storage System #1 and #2, respectively.
If your duly checked-in baggage is delayed by more than 6 hours after your arrival, we will reimburse any provably expended extra costs for each commenced 12 hour period that you incur to purchase necessary replacement items, i.e. basic personal hygiene items and clothes.
Form 62-761.900(5) Underground Storage System Installation and Removal Form for Certified Contractors, January 2017, incorporated by reference in paragraph 62-761.400(1)(c), F.A.C., and referenced in subsection 62-761.200(5), F.A.C., and is also available online here: http://www.flrules.org/Gateway/reference.asp?No=Ref-07656.