Tollroad Control Centre definition

Tollroad Control Centre means the building, facilities, equipment and systems described in section 2.3.1(b)(ix) of the Introduction document of the Performance Specification, which will be located on the Tollroad Area.

Examples of Tollroad Control Centre in a sentence

  • The Project Change Report confirms that the proposed merge would comply with agreed design standards ■ the ventilation station and infrastructure utility area and the Tollroad Control Centre (TCC) would be located at a different site, on the corner of Richer Street and Mt Coot- tha Road.

  • This is especially important for a book that uses popculture to introduce politics.

  • These changes include: ■ the movement of the western ventilation station and ventilation outlet to a position north- west of the proposed RD location ■ the relocation of the Tollroad Control Centre (TCC) from an area in the western worksite presented in the RD, to a site located opposite to the entrance of the Mt Coot-tha Botanic Gardens (see Section 5).

  • This APC addresses the Tollroad Control Centre (TCC), which is essential to the operation of the Project.

  • The location of the Tollroad Control Centre (TCC) proposed in the Application for Project Change has been reviewed and a new location will be identified for the TCC, in response to community concerns which have been raised during the assessment of the Application for Project Change.

Related to Tollroad Control Centre

  • Control Centre means the central facility of the Cycle Sharing System used mainly for service monitoring, operations control, and customer service. It is the location for collecting, storing, consolidating, processing the information obtained from various elements of the Cycle Sharing System as well as from users, agents, employees, and service providers.

  • Office of the Interconnection Control Center means the equipment, facilities and personnel used by the Office of the Interconnection to coordinate and direct the operation of the PJM Region and to administer the PJM Interchange Energy Market, including facilities and equipment used to communicate and coordinate with the Market Participants in connection with transactions in the PJM Interchange Energy Market or the operation of the PJM Region. On-Site Generators:

  • Transportation network company driver or “driver” means an

  • Data Centre or "DC" means the primary centre where data, software, computer systems and associated components, such as telecommunication and storage systems, redundant or backup power supplies, redundant data communications, environment controls and security devices are housed and operated from;

  • public service infrastructure means publicly controlled infrastructure of the following kinds:

  • area control service means air traffic control service for controlled flights in control areas;

  • Municipal Separate Storm Sewer System Management Program means a management program covering the duration of a state permit for a municipal separate storm sewer system that includes a comprehensive planning process that involves public participation and intergovernmental coordination, to reduce the discharge of pollutants to the maximum extent practicable, to protect water quality, and to satisfy the appropriate water quality requirements of the CWA and regulations, and this article and its attendant regulations, using management practices, control techniques, and system, design, and engineering methods, and such other provisions that are appropriate.

  • Intermodal Rail Yard means a rail facility in which cargo is transferred from drayage truck to train or vice-versa.

  • New England Control Area or “NECA” is the Control Area for New England as defined in the ISO-NE Tariff.

  • Station means a telephone instrument consisting of a connected transmitter, receiver, and associated apparatus to permit sending or receiving telephone messages.

  • Professional sports services contract means an agreement under which an individual is employed, or agrees to render services, as a player on a professional sports team, with a professional sports organization, or as a professional athlete.

  • Transportation network company means a company or organization facilitating and/or providing transportation services using a computer or digital application or platform to connect or match passengers with drivers for compensation or a fee.

  • Personal services contract means a contract that, by its express terms or as administered, makes the contractor per- sonnel appear to be, in effect, Government employees (see 37.104).

  • LCC-300 Cost Centre I EXTERNAL WORKS Lump Sum Breakdown I15 : Gas Main Lump Sum Item LSI15.1 I15.1 : Gas Main Contractor's Other Charges The Contractor shall enter hereunder any specific item of work or obligation or thing which is necessary for the execution of the Works, as required by the Contract, which has been omitted from or has not been separately itemised in this Lump Sum Breakdown and for which a separate charge is required. The unit of measurement for any Contractor's Other Charge shall be "sum", with Quantity and Rate columns entered with "N/A". ------------------------------------------------------------------------------------------------------------------- Total of Lump Sum Item LSI15.1 *** ------------ *** Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. [STAMP]

  • Sailboat means the same as that term is defined in Section 73-18-2.

  • Rechargeable Electrical Energy Storage System (REESS) means the rechargeable energy storage system that provides electric energy for electrical propulsion.

  • LCC-300 Cost Centre E Terminus Building - Structure Lump Sum Breakdown E4 : Station (GL X7-27/M-Q, 15.00m-21.96m) Lump Sum Item LSE4.4 E4.4 : Structural Steelwork Contractor's Other Charges The Contractor shall enter hereunder any specific item of work or obligation or thing which is necessary for the execution of the Works, as required by the Contract, which has been omitted from or has not been separately itemised in this Lump Sum Breakdown and for which a separate charge is required. The unit of measurement for any Contractor's Other Charges shall be "sum", with Quantity and Rate columns entered with "N/A". ---------------------------------------------------------------------------------------------------------------- To Collection of Lump Sum Item LSE4.4 *** ----------- *** Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. [STAMP]

  • Multiphase professional services contract means a contract for the providing of professional

  • Services Commencement Date means the date delivery of the Services shall commence as specified in the Key Provisions. If no date is specified in the Key Provisions this date shall be the Commencement Date;

  • Tourism destination project means a qualified non-gaming

  • LCC-300 Cost Centre L : EPIW - STRUCTURE (OPTION 1) Lump Sum Breakdown L4 : Widening of Boundary Patrol Road (Area D) (EPIW) (Option 1) Lump Sum Item LSL4.7 L4.7 : Diversion of Utilities Method-Related Charges The Contractor shall enter hereunder in detail any method related charges items in accordance with CESMM3 Section 7 --------------------------------------------------------------------------------------------- To Collection of Lump Sum Item LSL4.7 *** ---------- *** Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. [STAMP]

  • LCC-300 Cost Centre G Terminus Building : E&M Works Lump Sum Breakdown G4 : Plumbing and Drainage Lump Sum Item LSG4.4 G4.4 : Cold Water Installation Contractor's Other Charges The Contractor shall enter hereunder any specific item of work or obligation or thing which is necessary for the execution of the Works, as required by the Contract, which has been omitted from or has not been separately itemised in this Lump Sum Breakdown and for which a separate charge is required. The unit of measurement for any Contractor's Other Charge shall be "sum", with Quantity and Rate columns entered with "N/A". sum *** *** *** ------------------------------------------------------------------------------------------------ To Collection of Lump Sum Item LSG4.4 *** ---------- *** Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. [STAMP]

  • Interconnection Activation Date means the date that the construction of the joint facility Interconnection arrangement has been completed, trunk groups have been established, joint trunk testing is completed and trunks have been mutually accepted by the Parties.

  • Service Control Point (SCP) is the node in the common channel signaling network that accepts Queries for certain Database services. The SCP is a real time database system that receives Queries from service platforms, performs subscriber or application-specific service logic, and then sends a Response back to the Query-originating platform. Such service platforms can be Service Switching Points (SSPs) or other network nodes capable of properly formatting and launching Queries.

  • Service Road means a road or lane provided at the front, rear or side of a plot for service purpose;

  • LCC-300 Cost Centre F Terminus Building - ABWF Lump Sum Breakdown F5 : Shared Facilities Lump Sum Item LSF5.1 F5.1 : Shared Facilities - ABWF Dense concrete blockwork; compressive strength 7.0N/mm2 stretcher bond; in cement/lime mortar; flush pointed; as Appendix AA to Particular Specification, section F10 Thickness: 140mm, U511.1 vertical straight walls m2 *** *** *** Thickness: 140mm; 2 hours fire rating U511.2 vertical straight walls m2 *** *** *** Ancillaries U581 joint reinforcement; 24 gauge galvanised expanded steel mesh; 300mm wide m *** *** *** U583 movement joints; fire rated filler; 140 mm in depth; as Drawing nr LCC300/31/A24/154, 156 m *** *** *** U586 fixings and ties; galvanised mild steel dove tail ties m2 *** *** *** U589 head restraint; galvanised mild steel angle; 70 x 70 x 3mm thick; sleeved and dowelled into blockwork at 2000mm centres m *** *** *** PAINTING Emulsion paint; with one coat thinned with water in accordance with manufacturer's recommendation and two unthinned coats; as Appendix AA to Particular Specification, section M60 Plaster and render V543 surfaces inclined at an angle exceeding 60 degrees to the horizontal m2 *** *** *** -------------------------------------------------------------------------------------------------------------- To Collection of Lump Sum Item LSF5.1 *** ---------- *** Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. [STAMP]