Examples of Thorough inspection in a sentence
Thorough inspection of the instrument will be carried out by the First Party only on completion of the entire job of installation and commissioning of the equipment.
Thorough inspection and load testing of lifting machines and tackles shall be done by a third party, at least once in every 12 months and the records of such inspection and testing shall be maintained and a copy shall be submitted by the contractor to the departmental representative at site.
Thorough inspection and load testing of lifting machines and tackles shall be done by a competent person atleast once every 12 months and records of such inspection and testing shall be maintained.Motors, gearing transmission, couplings, belts, chain drives and other moving parts of hoisting appliances shall be provided with adequate safeguards.
Thorough inspection of the contractor’s delivery vehicle, e.g., underchassis, engine hood, storage compartment and passenger cabin shall be undertaken before access is allowed.
Thorough inspection and load testing of lifting machines and tackles shall be done by a competent person atleast once every 12 months and records of such inspection and testing shall be maintained.
Thorough inspection and load testing of a crane shall be done by a competent person at least once every 12 months.
Thorough inspection and load testing of lifting machines and tackles shall be done by a competent person at least once every 12 months and records of such inspection and testing shall be maintained.
Thorough inspection of the pipe materials shall be performed prior to installation.All materials purchase and handling will be the responsibility of the Contractor.
Thorough inspection must be conducted in all affected units to determine proper identification or presence of bed bugs.
Thorough inspection of machined parts such as thickness mapping of domes, visual and dimensional inspection is carried out in metrology and inspection facility.