the M5 definition
Examples of the M5 in a sentence
The Build Notice for each PCS System or PCS Sub-System will also include the Owner's best forecast based upon information available at such time (the "M5 Forecast") of when it expects to be able to declare Site Acquisition Substantial Completion within such PCS System or PCS Sub-System.
The agreement must include the M.5- Payment (Periodic Advance-Standard) standard provisions.
The Borrower shall ensure that transfer of land, which is required for the right of way of the M5 Road Section to be upgraded under Part A of the Project, shall have been completed between relevant agencies of the Borrower in accordance with applicable laws and regulations of the Borrower prior to commencement of any works on such land.
Following [83] the anomaly polynomial I4 for the string arising from the M5- brane wrapping a compact surface P inside a Calabi–Yau threefold15, Y3, can be determined by integrating the 6d anomaly polynomial over P .
Supply and installation of a modern electronic road tolling system based on microwave technology on a ▇▇▇ ▇▇ ▇▇▇▇▇▇▇ (▇▇▇▇ ▇▇ ▇▇ to km 131) of the M5 Road between Minsk and Bobrujsk, including supply of equipment such as (i) on-road tolling equipment, (ii) specialized vehicles and equipment for control purposes, (iii) a centralized data processing center, (iv) software and computers, and (v) on-board devices for vehicles.
Receptors of the M5 receptor subtype couple through the Gq/11 class of G-proteins and activate the phospholipase C pathway.
Reconstruction of the existing 2 (two) lanes of the M5 Road Section and construction of 2 (two) additional lanes to the ▇▇ ▇▇▇▇ Section, including construction of about 6 (six) two-level interchanges, seven overpasses, 4 (four) new bridges, and two pedestrian underpasses.
The Company must provide such security measures as are necessary for the protection and security of the Project Works, the Temporary Works and the M5 West Widening against theft, vandalism, unauthorised entry into the Project Site, the Temporary Areas and any other unlawful acts.
The ▇▇▇▇▇ software calculates the measured shear stress and shear rates given the M5 capabilities and the MV1/▇▇▇/cup geometry.
It is agreed that the M5 Call Option as set out in this clause 14 shall lapse and be of no further force or effect 60 (sixty) days after the expiry of the 5th (fifth) anniversary of the Implementation Date.