Examples of the Drawing in a sentence
Notwithstanding the requirements for any Authority inspection and test contained in Specifications applicable to this Contract, except where specialized inspections or tests are specified for performance solely by the Authority, the Contractor shall perform or have performed the inspections and tests required to substantiate that the supplies and services provided under the contract conform to the Drawing, Specifications and Contract requirements.
The minimum standards as shown in Table 2.1 shall apply Table 2.1 Alignment Standards Standard Flat and Rolling Terrain The cross section details of the road shall be as shown on the Drawing or as directed by the Engineer.
Any discrepancy in the Drawing or between the Schedule of Quantities and/or Drawing and/or specifications.
Where excavation is made in trenches, measurements for cutting shall be taken by means of taps and staff and the width of concrete or rubble packing as shown on the Drawing shall be considered as the width of excavation.
Should any utilities be encountered that are not shown on the Drawing, the CONTRACTOR shall immediately notify the OWNER’S REPRESENTATIVE and shall take all due caution necessary to protect the utility.
The CONTRACTOR shall repair, to the satisfaction of the OWNER, any surface or subsurface Improvement damaged during the course of the Work (unless such improvement is shown to be abandoned or removed) whether or not such improvement is shown on the Drawing.
It is, hereby, clarified that the claim in respect of such donations as indicated above will be admissible under section 80G on the basis of the certificate issued by the Drawing and Disbursing Officer (DDO)/Employer in this behalf - Circular No. 2/2005, dated 12-1-2005.
If the project is not substantially completed prior to the winter season due to the failure of the Contractor to meet the completion date, these necessary control structures will be installed and maintained by the Contractor at his expense and these items will not be paid for under the terms of the Scope of Work, except those that are permanent facilities to be left in place in accordance with the Drawing Plans Set and Specifications.
Phase II: 1) Mobilize all necessary equipment to the site and develop the site access as shown on the Drawing Plan Set.
The Division shall require the removal of off-site sediment by the Contractor if such sediment resulted from the Contractor’s negligence to place and maintain sediment control structures in accordance with the Drawing Plan Set and Specifications.