The Construction Work definition

The Construction Work means the construction works for the Project to be rendered by the Contractor as described in Article 3 of this Contract.

Examples of The Construction Work in a sentence

  • The Construction Work, the Guaranteed Price hereunder and the Contract Time, as such terms are applied and interpreted for the purposes of this Construction Contract, are subject to change, adjustment or variation only in accordance with the provisions of the Project Agreement.

  • The Construction Work Activity schedule shall include all planned Construction Work Activities, including fabrication, for the upcoming two weeks.

  • The Defendant states that while it encountered logistical and administrative challenges in running its programs within the region, it was understood that it would partner with the Plaintiff on condition that the Plaintiff would acquire legal status under the NGO Act and would, subject to approval of the NGO Board, take over the Defendant?s projects.

  • The Contractor shall ensure that all works conducted on site shall be in strict accordance with The Construction Work Code of Practice – August 2019 issued by Safe Work Australia, in association with Safework NSW and The NSW Government, and any other relevant Codes of Practice.

  • The Construction Work shall be subject to observation by Landlord from time to time during the period in which such work is being performed.

  • The Construction Work in Progress includes Cost of Land, Properties, Development Rights, TDR Rights, Construction Costs and Direct Expenses attributable to the projects.

  • This budget will address benchmarks for party distribution, campaign to leadership committee ratios, percentage to be contributed/distributed by IPTA members locally, and other objectives for achieving the goals of IPT-PAC.

  • The Construction Work Allowance has been annualised and forms part of an Employees’ Annual Rate of Pay for all Outside Staff and Supervisory Staff of Outside Staff.

  • The Construction Work Allowance applicable under the Award will not apply during the life of this Agreement.

  • The Construction Work Plan must indicate proposed equipment and compaction procedures.

Related to The Construction Work

  • The constructional plant means all appliances, tools, plants or machinery or whatsoever nature required in or about the execution, completion or maintenance of the works but does not include materials or other things intended to form part of the permanent work.

  • New construction means, for the purposes of determining insurance rates, structures for which the "start of construction" commenced on or after the effective date of an initial FIRM or after December 31, 1974, whichever is later, and includes any subsequent improvements to such structures. For floodplain management purposes, "new construction" means structures for which the "start of construction" commenced on or after the effective date of the floodplain management regulations adopted by a community and includes any subsequent improvements to such structures.

  • Completion of Construction means all the construction is complete except for minor weather-related components and conforms to the approved plans and specifications and change orders.

  • Commence Construction means that an owner or operator has either undertaken a continuous program of construction or has entered into a contractual obligation to undertake and complete, within a reasonable time, a continuous program of construction.

  • Residential construction means construction on single-family or two-family dwellings occupied or used, or intended to be occupied or used, primarily for residential purposes, and includes real property pursuant to chapter 499B.

  • Building construction means any physical activity on the site involved in the erection of a structure, cladding, external finish, formwork, fixture, fitting of service installation and the unloading of plant, machinery, materials or the like.

  • Pre-Construction Phase Services means the participation, documentation and execution of Contractor’s Pre-Construction Phase deliverables as required by this Agreement and further defined in Article 5.

  • Original construction ’ shall mean the first or initial construction

  • Commencement of Construction means the commencement of construction of foundation components or elements (such as footings, rafts or piles) for the home.

  • Pipeline Construction means a substantial disturbance to agricultural land associated with installation, replacement, removal, operation or maintenance of a pipeline, but shall not include work performed during an emergency. Emergency means a condition where there is clear and immediate danger to life or health, or essential services, or a potentially significant loss of property. When the emergency condition ends, pipeline construction will be in accordance with these rules.

  • Construction Work means any work in connection with

  • Existing construction means any structure for which the "start of construction" commenced before the effective date of the initial floodplain management code or ordinance adopted by the community as a basis for that community's participation in the NFIP.

  • Construction Works means all works and things necessary to complete the Project Facilities in accordance with this Agreement;

  • Erection, construction, remodeling, repairing means all types of work done on a particular building or work at the site thereof in the construction or development of the project, including without limitation, erecting, construction, remodeling, repairing, altering, painting, and decorating, the transporting of materials and supplies to or from the building or work done by the employees of the Contractor, Subcontractor, or Agent thereof, and the manufacturing or furnishing of

  • Cost of Construction means the total cost to Owner of those portions of the entire Project designed or specified by the Design Professional. Cost of Construction does not include the Design Professional's compensation and expenses and Owner's expenses associated with the Project or the cost of other services to be provided by others to the Owner.

  • Start of construction means the date the development permit was issued, provided the actual start of construction, repair, reconstruction, or improvement was within 180 days of the permit date. The actual start means the first placement of permanent construction of the structure such as the pouring of slabs or footings, installation of piles, construction of columns, or any work beyond the stage of excavation, and includes the placement of a manufactured home on a foundation. (Permanent construction does not include initial land preparation, such as clearing, grading and filling; nor does it include the installation of streets and/or walkways; nor does it include excavation for a basement, footings, piers or foundations or the erection of temporary forms; nor does it include the installation on the property of buildings appurtenant to the permitted structure, such as garages or sheds not occupied as dwelling units or part of the main structure. (NOTE: accessory structures are NOT exempt from any ordinance requirements) For a substantial improvement, the actual start of construction means the first alteration of any wall, ceiling, floor, or other structural part of a building, whether or not that alteration affects the external dimensions of the building.

  • Direct Construction Cost means the sum of the amounts that the Construction Manager actually and necessarily incurs for General Conditions Costs, Cost of the Work and Construction Manager’s Contingency during the Construction Phase as allowed by this Agreement. Direct Construction Cost does not include Pre-Construction Phase Fees or Construction Phase Fees.

  • Begin actual construction means, in general, initiation of physical on-site construction activities on an emissions unit which are of a permanent nature. Such activities include, but are not limited to, installation of building supports and foundations, laying of underground pipework, and construction of permanent storage structures. With respect to a change in method of operation, this term refers to those on-site activities, other than preparatory activities, which mark the initiation of the change.

  • Commenced Construction means (a) all of the following site preparation work is completed: ingress and egress routes exist; the site on which the project will be located is cleared and graded; there is power service to the site; footings are prepared; and foundations have been poured consistent with purchased equipment specifications and project design; or (b) the following financial commitments have been made: (i) (A) an engineering, procurement, and construction contract (“EPC”) has been executed by all parties and is effective; or (B) contracts (collectively, “EPC Equivalents”) for all of the following have been executed by all parties and is effective: (1) project engineering, (2) procurement of all major equipment, and (3) construction of the project, and (ii) the cumulative payments made by the developer under the EPC or EPC Equivalents to the counterparties to those respective agreements is equal to at least thirty (30) percent of the total costs of the EPC or EPC Equivalents.

  • Construction and demolition debris means and includes:

  • Construction Activities means the disturbance of soils associated with clearing, grading, excavation activities or other construction-related activities.

  • construction site means a workplace where construction work is being performed;

  • Construction means any physical change or change in the method of operation (including fabrication, erection, installation, demolition, or modification of an emissions unit) which would result in a change in actual emissions.

  • Construction project means the same as that term is defined in Section 38-1a-102.

  • Construction and demolition waste means the waste building materials, packaging, and rubble resulting from construction, remodeling, repair, and demolition operations on pavements, houses, commercial buildings and other structures.

  • Land disturbing construction activity means any man-made alteration of the land surface resulting in a change in the topography or existing vegetative or non-vegetative soil cover, that may result in runoff and lead to an increase in soil erosion and movement of sediment into waters of the state. Land disturbing construction activity includes clearing and grubbing, demolition, excavating, pit trench dewatering, filling and grading activities.