Maximum Run Time means the maximum number of hours a generating unit can run over the course of an Operating Day, as measured by PJM’s State Estimator.
Minimum Run Time For all generating units that are not combined cycle units, “Minimum Run Time” shall mean the minimum number of hours a unit must run, in real-time operations, from the time after generator breaker closure, which is typically indicated by telemetered or aggregated State Estimator megawatts greater than zero, to the time of generator breaker opening, as measured by PJM's State Estimator. For combined cycle units, “Minimum Run Time” shall mean the time period after the first combustion turbine generator breaker closure, which is typically indicated by telemetered or aggregated State Estimator megawatts greater than zero, and the last generator breaker opening as measured by PJM’s State Estimator.
NI 41-101 means National Instrument 41-101 – General Prospectus Requirements;
NI 51-101 means National Instrument 51-101 Standards of Disclosure for Oil and Gas Activities;
NI 51-102 means National Instrument 51-102 – Continuous Disclosure Obligations;