Surface coating operations definition

Surface coating operations means all operations involving the application of protective, decorative, adhesive, or strengthening coating or impregnation to one or more surfaces, or into the interstices of any object or material, by means of spraying, spreading, flowing, brushing, roll coating, pouring, cementing, or similar means; and any subsequent draining or drying operations, excluding open-tank operations.
Surface coating operations means all operations involving the application of protective, decorative, adhesive, or strengthening coating or impregnation to one or more surfaces, or into the interstices of any object or material, by means of spraying, spreading, flowing, brushing, roll coating, pouring, cementing, or similar means; and any subsequent draining or drying operations, excluding open-tank operations.[44 FR 8577, Feb. 9, 1979; 44 FR 20940, Apr. 6, 1979, as amended at 58 FR 35099, June 30, 1993; 61 FR 9250, Mar. 3, 1996] Stat. Auth.: ORS 654.025(2) and 656.726(4).Stats. Implemented: ORS 654.001 through 654.295.Hist: APD Admin. Order 4-1989, f. 3/31/89, ef. 5/1/89 (temp). APD Admin. Order 8-1989, f. 7/7/89, ef. 7/7/89 (perm). OR-OSHA Admin. Order 4-1997, f. 4/2/97, ef. 4/2/97. OR-OSHA Admin. Order 3-1998, f. 7/7/98, ef. 7/7/98. §1926.58 (RESERVED). (Asbestos redesignated §1926.1101.) §1926.59 Hazard Communication.

Examples of Surface coating operations in a sentence

  • Surface coating operations that occur at research or laboratory facilities, or is part of janitorial, building, and facility maintenance operations, or that occur at hobby shops that are operated for noncommercial purposes.

  • Surface coating operations on metal parts or products (e.g., parts for motorcycles or lawnmowers) not intended for use in automobiles, light-duty trucks, or other motor vehicles as defined in §63.3176 cannot be made part of your affected source under subpart IIII of this part.

  • Surface coating operations, including related cleaning activities, of the types described in sections 2, 5, 6, 7, 9, and 10 of this rule located in Lake County or Porter County with actual VOC emissions of equal to or greater than fifteen (15) pounds per day before add-on controls as specified in sections 2(c), 5(c), 6(c), 7(c), 9(d), and 10(e) of this rule.(b) Facilities described in subsection (a)(3) shall attain compliance with this rule no later than July 1, 1991.

  • Surface coating operations on metal parts or products (e.g., parts for motorcycles or lawnmowers) not intended for use in automobiles, light-duty trucks, or other motor vehicles as defined in § 63.3176 cannot be made part of your affected source under subpart IIII of this part.

  • Surface coating operations on metal parts or products not intended for use in automobiles or light-duty trucks (for example, parts for motorcycles or lawn mowers) cannot be made part of your affected source under subpart IIII of this part.

  • Surface coating operations on plastic parts or products (e.g., parts for motorcycles or lawnmowers) not intended for use in automobiles, light-duty trucks, or other motor vehicles as defined in §63.3176 cannot be made part of your affected source under subpart IIII of this part.

  • Surface coating operations typically include normal touch up activities.

  • Surface coating operations on plastic parts or products not intended for use in automobiles or light-duty trucks (for example, parts for motorcycles or lawn mowers) cannot be made part of your affected source under subpart IIII of this part.

  • Surface coating operations whose actual or expected usage of coating materials is greater than 250 gallons per month but does not exceed 3,500 gallons per year, excluding sources that exclusively use non-VOC and non-HAP containing coatings, e.g., powder coating operations.

  • Surface coating operations, including related cleaning activities, of the types described in sections 2, 5, 6, 7, 9, and 10 of this rule located in Lake County or Porter County with actual VOC emissions of equal to or greater than fifteen (15)pounds per day before add-on controls as specified in sections 2(c), 5(c), 6(c), 7(c), 9(d), and 10(e) of this rule.(b) Facilities described in subsection (a)(3) shall attain compliance with this rule no later than July 1, 1991.

Related to Surface coating operations

  • Drilling operations means the drilling of an oil and gas well and the production and completion operations ensuing from the drilling which require entry upon the surface estate and which were commenced after June 30, 1979, and oil and gas geophysical and seismograph exploration activities commenced after June 30, 1983.

  • Production Operations means all operations conducted for the purpose of producing Petroleum from the Development Area after the commencement of production from the Development Area including the operation and maintenance of all necessary facilities therefor.

  • Generation Operations Center means the location of Buyer’s real-time operations personnel.

  • The Works/Project means the works to be executed or done under this contract.

  • Green building strategies means those strategies that minimize the impact of development on the environment, and enhance the health, safety and well-being of residents by producing durable, low-maintenance, resource-efficient housing while making optimum use of existing infrastructure and community services.

  • generating plant means the generating facility described in Schedule 1 as amended from time to time;

  • Diatomaceous earth filtration means a process resulting in substantial particulate removal in which a precoat cake of diatomaceous earth filter media is deposited on a support membrane (septum), and while the water is filtered by passing through the cake on the septum, additional filter media known as body feed is continuously added to the feed water to maintain the permeability of the filter cake.

  • Exploration Operations means operations conducted in the Contract Area pursuant to this Contract in searching for Petroleum and in the course of an Appraisal Programme and shall include but not be limited to aerial, geological, geophysical, geochemical, palaeontological, palynological, topographical and seismic surveys, analysis, studies and their interpretation, investigations relating to the subsurface geology including structural test drilling, stratigraphic test drilling, drilling of Exploration Xxxxx and Appraisal Xxxxx and other related activities such as surveying, drill site preparation and all work necessarily connected therewith that is conducted in connection with Petroleum exploration.

  • Radiation area means any area, accessible to individuals, in which radiation levels could result in an individual receiving a dose equivalent in excess of 0.05 mSv (0.005 rem) in 1 hour at 30 centimeters from the source of radiation or from any surface that the radiation penetrates.

  • Structural Engineer means the Engineer appointed or to be appointed from time to time by Promoter for the preparation of the structural design and drawings of the buildings .

  • Industrial maintenance coating means a high performance architectural coating, including primers, sealers, undercoaters, intermediate coats, and topcoats formulated for application to substrates, including floors, exposed to one or more of the following extreme environmental conditions listed below and labeled “For industrial use only;” “For professional use only;” “Not for residential use;” or “Not intended for residential use.”

  • Heating oil means petroleum that is No. 1, No. 2, No. 4-light, No. 4-heavy, No. 5-light, No. 5-heavy, and No. 6 technical grades of fuel oil; other residual fuel oils (including Navy Special Fuel Oil and Bunker C); and other fuels when used as substitutes for one of these fuel oils. Heating oil is typically used in the operation of heating equipment, boilers, or furnaces.

  • Very high radiation area means an area, accessible to individuals, in which radiation levels from radiation sources external to the body could result in an individual receiving an absorbed dose in excess of 5 Gy (500 rad) in one hour at one meter from a source of radiation or one meter from any surface that the radiation penetrates.

  • Temporary clean coal technology demonstration project means a clean coal technology demonstration project that is operated for a period of five years or less and that complies with the SIP and other requirements necessary to attain and maintain the national ambient air quality standards during the project and after the project is terminated.

  • Biomethane means biogas that meets pipeline quality natural gas standards.

  • Surface water means all water which is open to the atmosphere and subject to surface runoff.

  • cogeneration means the simultaneous generation in one process of thermal energy and electrical or mechanical energy;

  • Surface waters means all waters of the state as defined in G.S. 143-212 except underground waters

  • Modular building means, but shall not be limited to, single and multifamily houses, apartment

  • Infrastructure Improvements means a street, road, sidewalk, parking facility, pedestrian mall, alley, bridge, sewer, sewage treatment plant, property designed to reduce, eliminate, or prevent the spread of identified soil or groundwater contamination, drainage system, waterway, waterline, water storage facility, rail line, utility line or pipeline, transit-oriented development, transit-oriented property, or other similar or related structure or improvement, together with necessary easements for the structure or improvement, owned or used by a public agency or functionally connected to similar or supporting property owned or used by a public agency, or designed and dedicated to use by, for the benefit of, or for the protection of the health, welfare, or safety of the public generally, whether or not used by a single business entity, provided that any road, street, or bridge shall be continuously open to public access and that other property shall be located in public easements or rights-of-way and sized to accommodate reasonably foreseeable development of eligible property in adjoining areas. Infrastructure improvements also include 1 or more of the following whether publicly or privately owned or operated or located on public or private property:

  • Plant means the machinery and apparatus intended to form or forming part of the Works.

  • Surface mining means mining by removing the overburden lying above the natural deposits and excavating directly from the natural deposits exposed, or by excavating directly from deposits lying exposed in their natural state and shall include dredge operations conducted in or on natural waterways or artificially created waterways within the state.

  • Furniture coating means any paint designed for application to room furnishings including, but not limited to, cabinets (kitchen, bath and vanity), tables, chairs, beds, and sofas.

  • Mining Operations means every kind of work done by the Operator:

  • Modular building manufacturer means a person or corporation who owns or operates a

  • Architectural coating means a coating applied to stationary structures and their appurtenances, to mobile homes, to pavements, or to curbs.