SUB-GRADE definition
Examples of SUB-GRADE in a sentence
Purchaser shall obtain written approval from the Contract Administrator for SUBGRADE CONSTRUCTION AND DRAINAGE INSTALLATION before rock application.
DETACHED WALK (6") 0 LF $ 9.50 $ - 1010 CURB RETURNS W/ HCR'S (COLLECTOR - 2 RAMPS) 0 EA $ 750.00 $ - 1011 MID-BLOCK HCR'S 0 EA $ 150.00 $ - 1017 FULL DEPTH ASPHALT (6" est.) Includes SubBase 0 SY $ 14.00 $ - 1020 SUBGRADE PREPARATION 0 SY $ 1.00 $ - 1039 ROAD BASE FILTER FABRIC 0 SY $ 1.50 $ - 1042 ROUND-A-BOUT 0 LS $ 50,000.00 $ - 1008 10 FT.
SELLER MAKES NO WARRANTY OR GUARANTEE WHATSOEVER WITH RESPECT TO SALES OR ORDERS FOR NON-STANDARD, SUB-GRADE GOODS OR PURCHASES THROUGH UNAUTHORIZED SALES CHANNELS.
C A B F D E ORIGINAL GRADE LINE ORIGINAL SLOPE LINE PERSPECTIVE VIEW VERTICLE CURVE 10' 20' +/- 2' 1' A B C ROAD PROFILE ALONG A-B-C OF DRAIN DIP ORIGINAL GRADE LINE VERTICLE CURVE 10' 22' +/- 2' 1.5'-3' D E ROAD PROFILE ALONG D-E-F OF DRAIN DIP F ORIGINAL ROAD SURFACE SLOPE OUTSLOPE 3-5% SUBGRADE 1' B E OUTLET OF DIP TO BE CLEAR OF OBSTRUCUTIONS TO ALLOW WATER TO FLOW FREELY.
WHEN AN UNSTABLE SUB-GRADE CONDITION IS ENCOUNTERED WHICH WILL PROVIDE INADEQUATE PIPE SUPPORT, OR WHEN LEDGE ROCK, BOULDERS, OR LARGE STONES ARE ENCOUNTERED, ADDITIONAL TRENCH DEPTH SHALL BE EXCAVATED AND REFILLED WITH SUITABLE FOUNDATION MATERIAL AND COMPACTED.
ROAD NAME START STATION END STATION SUBGRADE WIDTH (ft) Pitrun SOURCE Pitrun WIDTH (ft) Pitrun DEPTH (in) Pitrun Quantity(yd3/sta) Pitrun SUBTOTAL(yd3) Crushed SOURCE Crushed WIDTH (ft) Crushed DEPTH (in) Crushed Quantity(yd3/sta) Crushed Subtotal(yd3) Oversize/ Rip rap Source Oversize/Rip Rap Quantity(yd3) Misc.
SUBGRADE BACKFILL • Obtain approval by MPCA CONTRACTOR prior to backfilling the excavation.
DETACHED WALK (6") 975 LF $20 $19,509 1009 CURB RETURNS W/ HCR'S (LOCAL - 1 RAMP) 4 EA $1,500 $6,000 1019 FULL DEPTH ASPHALT (9" est.) 2,341 SY $25 $58,526 1020 SUBGRADE PLACEMENT (12" est.) 2,341 SY $3 $5,853 1021 SIGNAGE 4 EA $400 $1,600 1022 STRIPING, THERMOPLASTIC PER CITY 2,838 LF $5 $14,191 1028 ARTERIAL LIGHTING 4 EA $6,000 $24,000 1050 TEXTURED/COLORED CONC.
RIPRAP TOP ELEVATION SHALL BE AT TOP OF FINISHED OUTLET GRADE, NOT SUBGRADE.
K:1 1 ½ 1 ½ 1 ½ 1 ½ BALLAST DEPTH B1 - - - - CUBIC YARDS / STATION TOTAL CY BALLAST - - - - SURFACING DEPTH B2 -- -- -- 6 CUBIC YARDS / STATION TOTAL CY SURFACING -- -- -- 34 TOTAL CUBIC YARDS 10 -- -- 608 SUBGRADE WIDTH S N/A N/A N/A 13.5 BRUSHCUT (Y/N) N N N/A N/A BLADE, SHAPE, & DITCH (Y/N) Y Y Y Y Diameter Gage Corrugation 18” 16 2 2/ 3 " x 1/ 2 " 24” – 48” 14 2 2/ 3 " x 1/ 2 " 54” – 96” 14 3" x 1" ST-ML 144+75 18 34 GM 10 GM 2 3 L NT C Install in oncoming ditchto stream crossingculvert.