Stream Channel Protection definition

Stream Channel Protection means restricting peak flows from storm events that result in flow conditions where the stream is flowing to the full extent of its banks so the damaging effects to the channel of increased runoff from urbanization can be reduced. Methods for calculating stream channel protection are specified in the most current edition of the Design Manual.

Examples of Stream Channel Protection in a sentence

  • Idaho Stream Channel Protection Act, Title 42, Chapter 38, Idaho Code, and applicable rules as promulgated and administered by the Idaho Department of Water Resources.

  • These measures shall be implemented in accordance with standards prescribed by the Idaho Stream Channel Protection Act, Title 42, Chapter 38, Idaho Code, and the Idaho Dam Safety Act, Sections 42-1710 through 42-1721, Idaho Code, if applicable.

  • Stream Channel Protection Requirements ..............................................Section 308.

  • Policy ENV13 states that the Council will resist proposals that would result in a material loss of daylight/sunlight, particularly to dwellings, and that developments should not result in a significant increased sense of enclosure, overlooking or cause unacceptable overshadowing.

  • Stream Channel Protection Requirements For Regulated Activities involving New Development with one (1) or more acres of Earth Disturbance, the Applicant shall comply with the following stream channel protection requirements to minimize stream channel erosion and associated water quality impacts to the receiving waters: A.

  • Additionally, please contact DEQ to identify BMP alternatives and to determine whether this project is in an area with Total Maximum Daily Load stormwater permit conditions.• The Idaho Stream Channel Protection Act requires a permit for most stream channel alterations.

  • These measures shall be implemented in accordance with standards prescribed by the Idaho Stream Channel Protection Act, Title 42, Chapter 38, Idaho Code, and the Idaho Dam Safety Act, Sections 42-1710 through 42-1721, Idaho Code, if applicable.(11-1-89) c.

  • These rules apply to all existing and proposed uses and encroachments, whether or not authorized by permit under the Lake Protection Act, Title 58, Chapter 13, Idaho Code, or the Stream Channel Protection Act, Title 42, Chapter 38, Idaho Code.

  • Stream crossings, including fords, shall be minimum in number and planned and installed in compliance with the Stream Channel Protection Act, (Title 42, Chapter 38, Idaho Code), Paragraph030.07.b. and with the culvert sizing requirements of Paragraph 040.02.e. Fords are an acceptable stream crossing structures on small, shallow streams, with gradientsflat, less than four percent (4%) gradients.

  • The Grantee will comply with all applicable state and local laws, rules, and ordinances, including but not limited to: State fire laws and all rules of the State Land Board pertaining to forest and watershed protection, and with the Stream Channel Protection Act as designated in Chapter 38, Title 42 of the Idaho Code.

Related to Stream Channel Protection

  • Paycheck Protection Program means loan program created by Section 1102 of the CARES Act.

  • fall protection plan means a documented plan, which includes and provides for -

  • Electrical protection barrier means the part providing protection against any direct contact to the high voltage live parts.

  • Cathodic protection means a technique designed to prevent the corrosion of a metal surface by making that surface the cathode of an electrochemical cell. For example, protection can be accomplished with an impressed current system or a galvanic anode system.

  • ERCOT Protocols means the document adopted by ERCOT, including any attachments or exhibits referenced in that document, as amended from time to time, that contains the scheduling, operating, planning, reliability, and settlement (including customer registration) policies, rules, guidelines, procedures, standards, and criteria of ERCOT. For the purposes of determining responsibilities and rights at a given time, the ERCOT Protocols, as amended in accordance with the change procedure(s) described in the ERCOT Protocols, in effect at the time of the performance or non-performance of an action, shall govern with respect to that action.

  • Channel migration zone (CMZ) means the area where the active channel of a stream is prone to move and this results in a potential near-term loss of riparian function and associated habitat adjacent to the stream, except as modified by a permanent levee or dike. For this purpose, near-term means the time scale required to grow a mature forest. (See board manual section 2 for descriptions and illustrations of CMZs and delineation guidelines.)

  • New Jersey Stormwater Best Management Practices (BMP) Manual or “BMP Manual” means the manual maintained by the Department providing, in part, design specifications, removal rates, calculation methods, and soil testing procedures approved by the Department as being capable of contributing to the achievement of the stormwater management standards specified in this chapter. The BMP Manual is periodically amended by the Department as necessary to provide design specifications on additional best management practices and new information on already included practices reflecting the best available current information regarding the particular practice and the Department’s determination as to the ability of that best management practice to contribute to compliance with the standards contained in this chapter. Alternative stormwater management measures, removal rates, or calculation methods may be utilized, subject to any limitations specified in this chapter, provided the design engineer demonstrates to the municipality, in accordance with Section IV.F. of this ordinance and N.J.A.C. 7:8-5.2(g), that the proposed measure and its design will contribute to achievement of the design and performance standards established by this chapter.

  • Cathodic protection tester means a person who can demonstrate an understanding of the principles and measurements of all common types of cathodic protection systems as applied to buried or submerged metal piping and tank systems. At a minimum, such persons must have education and experience in soil resistivity, stray current, structure-to-soil potential, and component electrical isolation measurements of buried metal piping and tank systems.

  • application for international protection means a request made by a third country national or a stateless person for protection from a Member State, who can be understood to seek refugee status or subsidiary protection status, and who does not explicitly request another kind of protection, outside the scope of this Directive, that can be applied for separately;

  • Procurement Code means §13-1-101, et seq., XXXX 0000, as amended and supplemented from time to time.

  • Technology protection measure means a specific technology that blocks or filters Internet access to visual depictions that are:

  • Development regulations or "regulation" means the controls

  • Database Management System (DBMS) A system of manual procedures and computer programs used to create, store and update the data required to provide Selective Routing and/or Automatic Location Identification for 911 systems. Day: A calendar day unless otherwise specified. Dedicated Transport: UNE transmission path between one of CenturyLink’s Wire Centers or switches and another of CenturyLink’s Wire Centers or switches within the same LATA and State that are dedicated to a particular customer or carrier. Default: A Party’s violation of any material term or condition of the Agreement, or refusal or failure in any material respect to properly perform its obligations under this Agreement, including the failure to make any undisputed payment when due. A Party shall also be deemed in Default upon such Party’s insolvency or the initiation of bankruptcy or receivership proceedings by or against the Party or the failure to obtain or maintain any certification(s) or authorization(s) from the Commission which are necessary or appropriate for a Party to exchange traffic or order any service, facility or arrangement under this Agreement, or notice from the Party that it has ceased doing business in this State or receipt of publicly available information that signifies the Party is no longer doing business in this State.

  • InterMTA Traffic is: (a) traffic originated by a CMRS end user of ALLTEL in an MTA and terminated to an end user of MATC in another MTA; and (b) traffic originated by an end user of MATC in one MTA and terminated to an end user of ALLTEL in another MTA.

  • Virginia Stormwater Management Act means Article 2.3 (§ 62.1-44.15:24 et seq.) of Chapter 3.1 of Title 62.1 of the Code of Virginia.

  • Floodplain Management Regulations means this ordinance and other zoning ordinances, subdivision regulations, building codes, health regulations, special purpose ordinances, and other applications of police power. This term describes federal, state or local regulations, in any combination thereof, which provide standards for preventing and reducing flood loss and damage.

  • Procurement Regulations means, for purposes of paragraph 87 of the Appendix to the General Conditions, the “World Bank Procurement Regulations for IPF Borrowers”, dated July 2016, revised November 2017 and August 2018.

  • the applicable data protection law means the legislation protecting the fundamental rights and freedoms of individuals and, in particular, their right to privacy with respect to the processing of personal data applicable to a data controller in the Member State in which the data exporter is established;

  • Applicable Data Protection Law means, as applicable, the EU General Data Protection Regulation (Regulation 2016/679) (as may be amended, superseded or replaced) ("GDPR") and all other supplemental or implementing laws relating to data privacy in the relevant European Union member state, including where applicable the guidance and codes of practice issued by the relevant supervisory authority, and/or all applicable analogous privacy laws of other countries;

  • Biological safety cabinet means a containment unit suitable for the preparation of low to moderate risk agents where there is a need for protection of the product, personnel, and environment, according to National Sanitation Foundation (NSF) Standard 49.

  • Safety Management System means a systematic approach to managing safety, including the necessary organizational structures, accountabilities, policies and procedures;

  • InterLATA Traffic describes Telecommunications between a point located in a Local Access and Transport Area ("LATA") and a point located outside such area.

  • Mobile crisis outreach team means a crisis intervention service for minors or families of minors experiencing behavioral health or psychiatric emergencies.

  • Virginia Stormwater Management Program authority or "VSMP authority" means an authority approved by the State Board after September 13, 2011, to operate a Virginia Stormwater Management Program.

  • Quality Management System means a set of interrelated or interacting elements that organisations use to direct and control how quality policies are implemented and quality objectives are achieved;

  • Spatial Planning and Land Use Management Act means the Spatial Planning and Land Use Management Act, 2013 (Act 16 of 2013);