Storm Water Pollution Prevention Plan (SWPPP definition

Storm Water Pollution Prevention Plan (SWPPP means a plan for stormwater discharge that includes all required content under Part III of this Permit and which describes the erosion prevention BMPs, sediment control BMPs and Permanent Stormwater Management Systems that, when implemented, will decrease soil erosion on a parcel of land and decrease off‐site nonpoint pollution.
Storm Water Pollution Prevention Plan (SWPPP means the set of drawings and other documents that comprise all the information and specifications for the programs, drainage systems, structures, BMPs, concepts and techniques intended to maintain or restore quality and quantity of storm water runoff to pre-development levels during and after construction.
Storm Water Pollution Prevention Plan (SWPPP means a joint storm water and erosion and sediment control plan that is written as a prerequisite to obtaining a NPDES Storm Water Permit for Construction Activity, that when implemented will decrease soil erosion on a parcel of land and off-site non-point pollution. It involves both temporary and permanent controls. The SWPPP, which draws its information from a Storm Water Management Plan and is typically condensed, must be incorporated into the construction grading plans for the project.

Examples of Storm Water Pollution Prevention Plan (SWPPP in a sentence

  • STORM WATER POLLUTION PREVENTION PLANThe Contractor shall submit a Storm Water Pollution Prevention Plan (SWPPP) to the Engineer for approval.

  • A filing form, a filing fee, a location map, and a Storm Water Pollution Prevention Plan (SWPPP) are required for this filing.

  • A qualified SWPPP practitioner (QSP) or qualified SWPPP developer (QSD) must prepare the WPCP.The WPCP must comply with the Department's Storm Water Pollution Prevention Plan (SWPPP) and Water Pollution Control Plan (WPCP) Preparation Manual and must: 1.

  • The Contractor shall be solely responsible for preparing and implementing a Storm Water Pollution Prevention Plan (SWPPP) prior to initiating Work.

  • Contractor shall comply with the State of Florida rules and regulations for the National Pollutant Discharge Elimination System (NPDES) including but not limited to all permitting, Notices of Intent, and the Storm Water Pollution Prevention Plan (SWPPP).


More Definitions of Storm Water Pollution Prevention Plan (SWPPP

Storm Water Pollution Prevention Plan (SWPPP means a plan that describes a process whereby a facility thoroughly evaluates potential pollutant sources at a site and selects and implements appropriate measures designed to prevent or control the discharge of pollutants in storm water runoff.
Storm Water Pollution Prevention Plan (SWPPP means a document developed to help identify sources of pollution potentially affecting the quality of storm water discharges associated with a facility or activity, and to ensure implementation of measures to minimize and control pollutants in storm water discharges associated with a facility or activity. The department determines specific requirements and information to be included in a SWPPP based on the type and characteristics of a facility or activity, and on the respective MPDES permit requirements.
Storm Water Pollution Prevention Plan (SWPPP means the required plan that describes the potential for pollution problems on a construction project.
Storm Water Pollution Prevention Plan (SWPPP means a document developed to help
Storm Water Pollution Prevention Plan (SWPPP meansis a document developed to help identify sources of pollution potentially affecting the quality of storm water discharges associated with a facility or activity, and to ensure implementation of measures to minimize and control pollutants in storm water discharges associated with a person, facility, or activity. A SWPPP is required when applying for a Construction General Permit.
Storm Water Pollution Prevention Plan (SWPPP means a plan required by storm water regulations or permits that includes site map(s), an identification of construction/contractor activities that could cause pollutants in the storm water, and a description of measures or practices to control these pollutants. This is synonymous with the term "BMP Plan" used in the KYDOW General Permit.
Storm Water Pollution Prevention Plan (SWPPP means a plan for stormwater discharge that includes all required content under in Section 5 that describes the erosion prevention, sediment control and waste control BMPs and permanent stormwater treatment systems. [Minn. R. 7090]