Steady-state idle test definition

Steady-state idle test means a vehicle emission test procedure consisting of an initial idle mode measurement of exhaust emissions followed, if necessary, by a high idle preconditioning mode and a second-chance idle mode.
Steady-state idle test means a vehicle emission test procedure consisting of an initial idle mode measurement of exhaust emissions followed, if
Steady-state idle test means a vehicle emission test procedure consisting

Related to Steady-state idle test

  • Commissioning test means tests applied to the Generating Facility, after completion of the construction of the Generating Facility, in order to verify that the Generating Facility may be released for Operation.

  • Drug use test means a scientifically substantiated method to test for the presence of illegal or performance-enhancing drugs or the metabolites thereof in a person’s urine.

  • Commissioning Tests means all of the procedures and tests which, in accordance with the Reasonable and Prudent Standard, and in compliance with industry guidelines, practices and standards, are:

  • COVID-19 test means a viral test for SARS-CoV-2 that is:

  • Drug test means a test designed to detect the illegal use of a controlled substance.

  • Digital audio-visual work means a series of related images which, when shown in succession, imparts an impression of motion, together with accompanying sounds, if any.

  • Web Site Accessibility Standards/Specifications means standards contained in Title 1 Texas Administrative Code Chapter 206.

  • Cannabis testing facility means an entity registered by

  • Digital audio-visual works which means a series of related images which, when shown in succession, impart an impression of motion, together with accompanying sounds, if any;

  • Maintenance Test means the maintenance test set out in Clause 12.1 (Maintenance Test).

  • Operational Acceptance Tests means the tests specified in the Technical Requirements and Agreed Project Plan to be carried out to ascertain whether the System, or a specified Sub system, is able to attain the functional and performance requirements specified in the Technical Requirements and Agreed Project Plan, in accordance with the provisions of GCC Clause 27.2 (Operational Acceptance Test).

  • DNS test Means one non-­‐recursive DNS query sent to a particular “IP address” (via UDP or TCP). If DNSSEC is offered in the queried DNS zone, for a query to be considered answered, the signatures must be positively verified against a corresponding DS record published in the parent zone or, if the parent is not signed, against a statically configured Trust Anchor. The answer to the query must contain the corresponding information from the Registry System, otherwise the query will be considered unanswered. A query with a “DNS resolution RTT” 5 times higher than the corresponding SLR, will be considered unanswered. The possible results to a DNS test are: a number in milliseconds corresponding to the “DNS resolution RTT” or, undefined/unanswered.

  • Web Site Accessibility Standards/Specifications means standards contained in Title 1 Texas Administrative Code Chapter 206.

  • Start-Up Testing means the completion of applicable required factory and start-up tests as set forth in Exhibit C.

  • Sound level meter means an instrument which includes a microphone, amplifier, RMS detector, integrator or time averager, output meter, and weighting networks used to measure sound pressure levels.

  • RDDS test Means one query sent to a particular “IP address” of one of the servers of one of the RDDS services. Queries shall be about existing objects in the Registry System and the responses must contain the corresponding information otherwise the query will be considered unanswered. Queries with an RTT 5 times higher than the corresponding SLR will be considered as unanswered. The possible results to an RDDS test are: a number in milliseconds corresponding to the RTT or undefined/unanswered.

  • Project Management Report means each report prepared in accordance with Section 4.02 of this Agreement;

  • Generation Interconnection Feasibility Study means a study conducted by the Transmission Provider (in coordination with the affected Transmission Owner(s)) in accordance with Tariff, Part IV, section 36.2.

  • State Level Monitoring Cell means the body constituted by the State Government for the control and elimination of ragging in institutions within the jurisdiction of the State, established under a State Law or on the advice of the Central Government, as the case may be.

  • Percolation test means a subsurface soil test at the depth of a proposed absorption system or similar component of an OWTS to determine the water absorption capability of the soil, the results of which are normally expressed as the rate at which one inch of water is absorbed. The rate is expressed in minutes per inch.

  • Nuclear fuel cycle-related research and development activities means those activities which are specifically related to any process or system development aspect of any of the following: - conversion of nuclear material, - enrichment of nuclear material, - nuclear fuel fabrication, - reactors, - critical facilities, - reprocessing of nuclear fuel, - processing (not including repackaging or conditioning not involving the separation of elements, for storage or disposal) of intermediate or high-level waste containing plutonium, high enriched uranium or uranium-233, but do not include activities related to theoretical or basic scientific research or to research and development on industrial radioisotope applications, medical, hydrological and agricultural applications, health and environmental effects and improved maintenance.

  • Acceptance Testing mean the tests, reviews and other activities that are performed by or on behalf of Agency to determine whether the Deliverables meet the Acceptance Criteria or otherwise satisfy the Agency, as determined by the Agency in its sole discretion.

  • Application Programming Interface or “API” means the application programming interface materials and related documentation containing all data and information to allow skilled Software developers to create Software interfaces that interface or interact with other specified Software.

  • site development plan means a dimensioned plan drawn to scale that indicates details of the proposed land development, including the site layout, positioning of buildings and structures, property access, building designs and landscaping;

  • Design Criteria Package means concise, performance-oriented drawings or specifications for a public construction project. The purpose of the Design Criteria Package is to furnish sufficient information to permit Design-Build Firms to prepare a bid or a response to the District’s Request for Proposals, or to permit the District to enter into a negotiated Design- Build Contract. The Design Criteria Package must specify performance- based criteria for the public construction project, including the legal description of the site, survey information concerning the site, interior space requirements, material quality standards, schematic layouts and conceptual design criteria of the project, cost or budget estimates, design and construction schedules, site development requirements, provisions for utilities, stormwater retention and disposal, and parking requirements applicable to the project. Design Criteria Packages shall require firms to submit information regarding the qualifications, availability, and past work of the firms, including the partners and members thereof.

  • Marijuana testing facility means an entity licensed to analyze and certify the safety and potency of marijuana.